International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2065 ]  
 
Proposed Input for G.smp Summary Clause re Capacity Efficiency     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2064 ]  
(Rev.1) 
G.vdsl: Proposed Accuracy Target for LATN and SATN     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2063 ]  
(Rev.1) 
G.8263: PDV Noise Tolerance Testing for the PEC-S-F     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2062 ]  
 
Mapping of 16G Fibre-Channel into OTN     Alcatel-Lucent USA Inc.   Q11/15   2012-08-24
[ 2061 ]  
(Rev.1-2) 
Proposed Input for G.smp Summary Clause re Mesh Topology Definition     Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2060 ]  
 
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2059 ]  
(Rev.1) 
G.ploam: Parameters for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2058 ]  
 
Misalignment among G.709, G.798 and G.872     Ciena Corporation   Q9/15, Q12/15, Q11/15   2012-08-24
[ 2057 ]  
 
G.vdsl: Proposed text for Data Gathering Messaging     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2056 ]  
 
Generic considerations for protection resource assignments in G.smp     Alcatel-Lucent USA Inc. , Ciena Corporation   Q9/15   2012-08-24
[ 2055 ]  
 
Distributed G.8031 proposal     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2054 ]  
 
Requirements of Control Plane/Management Plane to support SMP     Ciena Corporation   Q9/15   2012-08-24
[ 2053 ]  
(Rev.1) 
Development of a new PTP Profile for Time/Phase Distribution     AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation   Q13/15   2012-08-24
[ 2052 ]  
 
Protection Interworking editorial comments     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2051 ]  
 
Bi-directional SMP Operation and Signalling Flow Sequence     Ciena Corporation   Q9/15   2012-08-24
[ 2050 ]  
(Rev.1) 
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame     ERDF   Q4C/15   2012-08-24
[ 2049 ]  
 
Comments and clarifications on G.smp     Ciena Corporation   Q9/15   2012-08-24
[ 2048 ]  
 
G.odusmp Support of Both ODUj and ODUk Restoration     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2047 ]  
 
Use of CL-SNCG/S to simplify G.873.2 configurations     Ciena Corporation   Q9/15   2012-08-24
[ 2046 ]  
 
Not used  
Withdrawn by submitter
 
N/A   Q9/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2044 ]  
 
G.odusmp with TCM APS     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2043 ]  
 
Alternative to legacy interfaces for connecting PRTC to T-GM     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2042 ]  
 
G.8272: PRTC Support of SyncE and ESMC     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2041 ]  
 
G.smp multiple failure protection pre-emption     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2040 ]  
 
Support of IPv6 for G.8265.1     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2039 ]  
 
Two-step clock issue with multicast transmission     Cisco Systems, Inc.   Q13/15   2012-08-24
[ 2038 ]  
 
Support of IP for G.8275.x     Cisco Systems, Inc. , Juniper Networks   Q13/15   2012-08-24
[ 2037 ]  
 
ODU SMP APS protocol considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2036 ]  
 
Protection Interworking - Linear Protection Generic Models     Fujitsu Network Communications, Inc.   Q9/15   2012-08-24
[ 2035 ]  
 
Alignment of APS specifications in G.873.1, G.798, and G.709     Tellabs Oy   Q9/15, Q11/15   2012-08-24
[ 2034 ]  
 
Proposed appendix to G.798.1 concerning SNC implementation considerations     Tellabs Oy   Q9/15   2012-08-24
[ 2033 ]  
(Rev.1-2) 
Proposal for consented text G.9956 Annex A - Cor1 - Various corrections and clarifications     ERDF   Q4C/15   2012-08-24
[ 2032 ]  
 
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc.   Q4A/15   2012-08-24
[ 2031 ]  
 
Not used  
Withdrawn by submitter
 
N/A     2012-08-24
[ 2030 ]  
 
Update to the AIS Insert process in G.8121.2     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2029 ]  
 
Update to the AIS Insert process in G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2028 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121.2     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2027 ]  
 
Proposed Text for adding Lock Instruct functions to G.8121     Cisco Systems, Inc.   Q9/15, Q14/15   2012-08-24
[ 2026 ]  
 
Proposed text for G.8121 Appendix describing PHB flows     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2025 ]  
 
Updates to G.8121.2 for alignment with G.8121     Cisco Systems, Inc.   Q9/15   2012-08-24
[ 2024 ]  
 
G.fast: Limitations on cyclic prefix length     Swisscom SA   Q4A/15   2012-08-24
[ 2023 ]  
 
Terminology for Performance Monitoring in G.8013/Y.1731     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2012-08-24
[ 2022 ]  
 
G.fast: Requirements for VDSL2 emulation on G.fast hardware     Swisscom SA   Q4A/15   2012-08-24
[ 2021 ]  
 
Proposal for Updating External Commands     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2020 ]  
 
ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2019 ]  
 
ODU SMP Application Analysis     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2018 ]  
 
Editorial Suggestions for G.smp     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2017 ]  
 
Discussion and Update for ODU SMP Node Functional Model     Huawei Technologies Co. Ltd.   Q9/15   2012-08-24
[ 2016 ]  
 
Discussion and Proposal for Solving SMP Objectives Open Issues     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-24
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29