International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2115 ]  
 
Consideration of the CSF function on G.8021     NEC Corporation   Q9/15   2012-08-27
[ 2114 ]  
 
Clarification of APS protocol type on G.smp m:1 architecture     NEC Corporation   Q9/15   2012-08-27
[ 2113 ]  
 
Proposed text for the network connectivity in G.Supplement for G.8032     NEC Corporation   Q9/15   2012-08-27
[ 2112 ]  
+Corr.1 
Add management item as a main function in G.9960     FiberHome Technologies Group   Q4B/15   2012-08-27
[ 2111 ]  
+Corr.1 
Proposal to G.multi: wavelength management channel choice and announcement in Stacked-PON     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2110 ]  
+Corr.1 
Proposal to G.multi: the framework of transmission convergence layer function in CO     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2109 ]  
+Corr.1 
Proposal on supporting OTDR function for G.984.5     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2108 ]  
+Corr.1 
Proposal on an asymmetric wavelength number physical architechture for G.ngpon2.2     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2107 ]  
 
OAM configuration examples for G.supplement for G.8032     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2012-08-27
[ 2106 ]  
 
Architecture Considerations for Time Distribution     ADVA Optical Networking   Q13/15   2012-08-26
[ 2105 ]  
 
G.8261.1 Network limits     ADVA Optical Networking   Q13/15   2012-08-26
[ 2104 ]  
 
PTP Network Probe and PTP Clock Probe     ADVA Optical Networking   Q13/15   2012-08-26
[ 2103 ]  
 
Exact PTP clockclass values in application     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2102 ]  
 
Proposal on PTP multicast MAC address in 8275.1     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2101 ]  
 
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2100 ]  
 
Coordinate mechanism for SyncE and PTP     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2099 ]  
(Rev.1-2) 
Analysis and comparison on PTN ring protection proposals     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2098 ]  
(Rev.1-3) 
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2097 ]  
(Rev.1-2) 
PTN requirements on Ring protection  
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2096 ]  
(Rev.1-2) 
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection     China Mobile Communications Corporation; China   Q9/15   2012-08-26
[ 2095 ]  
 
PRTC Timing Signal Variation for a Particular Design     SymmetriCom, Inc.   Q13/15   2012-08-25
[ 2094 ]  
 
G.hn: Update of relaying tables in G.9961     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2093 ]  
 
G.hn: MA priorities of PROBEs and CTMG     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2092 ]  
 
G.hn: Updates on the Network admission procedure (NAP)     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2091 ]  
 
G.hn: interfaces for Management, Control and Security for G.hn     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2090 ]  
 
G.hn: Clarification on FACK     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2089 ]  
 
G.hn: Proposal for Extended ACK implementation     Marvell Semiconductor Inc.   Q4B/15   2012-08-25
[ 2088 ]  
 
G.fast: Proposed Definitions for G.fast PMD     Ikanos Communications   Q4A/15   2012-08-25
[ 2087 ]  
 
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     PMC-Sierra, Inc.   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-25
[ 2086 ]  
 
Proposed clarification for the CSF start time in G.7041     PMC-Sierra, Inc.   Q11/15   2012-08-25
[ 2085 ]  
 
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces     PMC-Sierra, Inc.   Q11/15   2012-08-25
[ 2084 ]  
 
Testing Packet Clocks (re. G.8263) - Part 2     Anue Systems   Q13/15   2012-08-25
[ 2083 ]  
 
Normal operation of telecom-grade network elements for supporting packet-based timing     Anue Systems   Q13/15   2012-08-25
[ 2082 ]  
 
Packet Timing Monitor - Definition     Anue Systems   Q13/15   2012-08-25
[ 2081 ]  
 
Annex for G.8273 discussing performance parameters for PTP clocks     Anue Systems   Q13/15   2012-08-25
[ 2080 ]  
 
Organization of T-BC performance requirements     Anue Systems   Q13/15   2012-08-25
[ 2079 ]  
 
Time Error of PTP master ports     Anue Systems   Q13/15   2012-08-24
[ 2078 ]  
 
Time error accumulation in chains of phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2077 ]  
 
Estimating constant time error and related measurement methods for phase/time clocks     Anue Systems   Q13/15   2012-08-24
[ 2076 ]  
 
Requirements for fibres used in next generation submarine systems and new recommended text for G.654     OFS Fitel, LLC   Q5/15   2012-08-24
[ 2075 ]  
 
G.8260: Definition of Partial On-path Support     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2074 ]  
 
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2073 ]  
 
G.8272: Phase/Time Holdover Capability for a PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2072 ]  
 
Update to G.8021 for retrieval of on-demand intermediate measurements     Alcatel-Lucent Italia S.p.A. , Alcatel-Lucent USA Inc.   Q9/15   2012-08-24
[ 2071 ]  
 
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
[ 2070 ]  
 
G.smp Objectives     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-24
[ 2069 ]  
 
G.8272: Performance conditions for the PRTC     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2068 ]  
 
G.8265.1: Value of the PTP "Renewal Invited" flag     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2067 ]  
 
G.8265.1: Value of the PTP clockAccuracy Field     SymmetriCom, Inc.   Q13/15   2012-08-24
[ 2066 ]  
 
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4A/15   2012-08-24
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29