International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 115 ]  
 
2008-11-20 France Telecom   IPR: Potentially Essential Patents Notification for ITU-T G.hn     Q4/15  
[ 114 ]  
 
2008-11-20 NEC Corporation and Fujitsu   Reconsideration of topology restrictions on G.8032v2     Q9/15  
[ 113 ]  
 
2008-11-20 Swisscom   G.ploam: Improvement of xTU-R Inventory Information     Q4/15  
[ 112 ]  
 
2008-11-20 United States   Structure for Evolution of G.709     Q11/15  
[ 111 ]  
 
2008-11-20 Norway   Support for the consent of draft Recommendation G.hn     Q4/15  
[ 110 ]  
 
2008-11-20 AT&T, Lucent, Ciena, PMC-Sierra   Standardization of G.709 Bit Rate Compliant Transparent Transport of 10GBase-R Clients in G.7041 and G.709     Q11/15  
[ 109 ]  
 
2008-11-20 Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson   G.INP: Working text for PMS-TC ARQ for VDSL2     Q4/15  
[ 108 ]  
 
2008-11-20 Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson   G.INP: Working text for PMS-TC ARQ for ADSL2     Q4/15  
[ 107 ]  
 
2008-11-20 Huawei Technologies Co., Ltd.   Proposals to extend G.709     Q11/15  
[ 106 ]  
 
2008-11-20 Broadcom   G.INP: Comments on management of retransmission     Q4/15  
[ 105 ]  
 
2008-11-20 AT&T   G.8021 Appendix II Correction     Q9/15  
[ 104 ]  
 
2008-11-20 Alcatel-Lucent   Proposal for a frequency only end-to-end 1588V2 telecom profile     Q13/15  
[ 103 ]  
 
2008-11-20 Korea (Republic of)   Correction to OPUk-16v frame structure in G.709     Q11/15  
[ 102 ]  
 
2008-11-20 Korea (Republic of)   Comments on G.8032 Version 2 - Ethernet ring protection switching     Q9/15  
[ 101 ]  
 
2008-11-20 Ericsson   PEC Network Limits and packet based clock characteristics (G.8261 and G.8263)     Q13/15  
[ 100 ]  
 
2008-11-20 Ericsson   Proposals for G.pactiming-bis     Q13/15  
[ 99 ]  
 
2008-11-20 Ericsson   PNT-F and CES-IWF integrated in the end equipment     Q13/15  
[ 98 ]  
 
2008-11-20 Ericsson   Reference Points where network requirements apply; Frequency Synchronization case     Q13/15  
[ 97 ]  
 
2008-11-20 Ericsson   General aspects on the protocols for packet based methods in G.8264     Q13/15  
[ 96 ]  
 
2008-11-20 Ericsson   Details on the use of NTP for frequency distribution in G.8264     Q13/15  
[ 95 ]  
 
2008-11-20 Huawei Technologies Co., Ltd.   OPUk GMP proposal     Q11/15  
[ 94 ]  
 
2008-11-20 Tejas Networks Ltd   G.8032 Efficient Flushing Mechanism     Q9/15  
[ 93 ]  
 
2008-11-20 Tejas Networks Ltd   G.8032 Dual Node Interconnect     Q9/15  
[ 92 ]  
 
2008-11-19 LSI Corporation, Nokia Siemens Networks, Huawei Technologies   Proposal to develop Use Cases for IEEE1588v2 (PTP) Frequency Distribution applications     Q13/15  
[ 91 ]  
 
2008-11-19 Broadcom   G.vector: Quantification of normalized error samples     Q4/15  
[ 90 ]  
 
2008-11-19 Broadcom   G.vector: Further specification of the vectoring back-channel     Q4/15  
[ 89 ]  
 
2008-11-19 Italy   Proposal for the Revision of G.697     Q6/15  
[ 88 ]  
 
2008-11-19 NTT   Draft for Questionnaire on "Optical fibre cables for drop applications"     Q16/15  
[ 87 ]  
 
2008-11-19 Finisar Corporation   Proposal on upgrading G.695 to include 10 Gbit/s channels     Q6/15  
[ 86 ]  
 
2008-11-19 Finisar Corporation   Proposal on extending the applicability of CML sources in G.698.2 applications     Q6/15  
[ 85 ]  
 
2008-11-19 NTT   Study plan and schedule of 18/15 - Development of optical networks in access area     Q18/15  
[ 84 ]  
 
2008-11-19 NTT   Study plan and schedule of 16/15-optical fibre cable construction types     Q16/15  
[ 83 ]  
 
2008-11-19 NTT   Proposed study plan for question 17/15-Optical fibre cable network maintenance     Q17/15  
[ 82 ]  
 
2008-11-19 Nippon Telegraph and Telephone Corporation (NTT)   Proposal to promote discussion on forward error correction (FEC) techniques in Q.6/WP2     Q6/15  
[ 81 ]  
 
2008-11-19 Nippon Telegraph and Telephone Corporation (NTT)   Proposal to facilitate discussion on power consumption issues in optical transmission systems     Q6/15  
[ 80 ]  
(Rev.1) 
2008-11-19 NEC Corporation   Proposed modification of clearing FS/MS commands on G.8032     Q9/15  
[ 79 ]  
 
2008-11-19 ADVA Optical Networking, Inc.   New Objects/Attributes from MEF     Q14/15  
[ 78 ]  
 
2008-11-19 Tellabs Oy   Proposed definition of ODU3e     Q11/15  
[ 77 ]  
 
2008-11-19 ADTRAN   Proposal for clarifying downstream priority queues     Q2/15  
[ 76 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   Introducing the MAC layer     Q12/15  
[ 75 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   STM-16 Jitter and Wander Accumulation over OTN Cross-Connect Network Elements     Q13/15, Q11/15  
[ 74 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   Initial Results for Ethernet Client Jitter and Wander Accumulation over OTN Islands     Q13/15, Q11/15  
[ 73 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   Initial Results for High-Definition Serial Digital Interface Video Client Jitter Accumulation over OTN Islands     Q13/15, Q11/15  
[ 72 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   ODUk VCAT/AMP or ODUf/GMP     Q11/15  
[ 71 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   From SDH centric, line and ring WDM based to multi-service, multi-domain OTN evolution     Q11/15  
[ 70 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   Atomic and compound information entities     Q12/15  
[ 69 ]  
 
2008-11-19 Huawei Technologies Co., Ltd.   Timing Domains and Timing-Related Processes in an OTN Network Element     Q13/15, Q11/15  
[ 68 ]  
 
2008-11-19 NEC, Fujitsu, NTT   Specifications proposal to G.gbe     Q2/15  
[ 67 ]  
 
2008-11-19 NEC, Fujitsu   Liaison statement proposal on G.gbe     Q2/15  
[ 66 ]  
 
2008-11-19 Hitachi   Comments on the Software image download in G.984.4 Revised 2008-Am2     Q2/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21