International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 415 ]  
 
2009-09-15 Ericsson   Considerations about physical layer configurations for WSON     Q6/15  
[ 414 ]  
 
2009-09-15 NTT   Proposal of architecture of G.omci     Q2/15  
[ 413 ]  
 
2009-09-15 NTT   Proposal of home network remote management requirements on G.hntreq     Q1/15  
[ 412 ]  
(Rev.1) 
2009-09-15 Verizon , AT&T , BT , Nokia Siemens Networks   Latency Measurements in the Optical Transport Network Using G.709 Overhead     Q9/15, Q11/15  
[ 411 ]  
 
2009-09-15 Ciena Corp   Sublayers and WSON in G.872     Q12/15  
[ 410 ]  
 
2009-09-15 Ciena Corp   An updated Topology model for WSON     Q12/15  
[ 409 ]  
 
2009-09-15 Ciena Corp   Some thoughts on Transport Entities     Q12/15  
[ 408 ]  
 
2009-09-15 Ciena Corp   Characteristic Information, Sublayers and Media     Q12/15  
[ 407 ]  
 
2009-09-15 Alcatel-Lucent   Mapping of 100GBASE-R into OPU4     Q11/15  
[ 406 ]  
 
2009-09-15 Alcatel-Lucent   BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Q9/15, Q11/15  
[ 405 ]  
 
2009-09-15 Alcatel-Lucent , Cisco , Finisar , Juniper   Adaptation of STM-256 over multichannel parallel interfaces     Q9/15, Q11/15  
[ 404 ]  
 
2009-09-15 ZTE Corporation   Propose to add Link discover Process based on OAM in G.8051     Q14/15  
[ 403 ]  
 
2009-09-15 ZTE Corporation   Propose to add requirement of MAC topology management     Q14/15  
[ 402 ]  
 
2009-09-15 ZTE Corporation   Propose to add MAC Link discover support in G.8051     Q14/15  
[ 401 ]  
 
2009-09-15 ZTE Corporation   Propose to add requirement of discovery support on MPLS-TP OAM Requirement     Q14/15, Q12/15  
[ 400 ]  
 
2009-09-15 ZTE Corporation   Propose to add requirement of discovery support on MPLS-TP NM Requirement     Q14/15, Q12/15  
[ 399 ]  
 
2009-09-15 Alcatel-Lucent   CSF Indication for Y.1731 (Ethernet OAM)     Q9/15, Q10/15  
[ 398 ]  
 
2009-09-15 Draka Communications   Correct power budget modelling of indoor access installations     Q5/15, Q16/15  
[ 397 ]  
 
2009-09-15 Draka Communications   Proposal for revision of ITU-T Recommendation G.657 (Explanation)     Q5/15, Q16/15  
[ 396 ]  
 
2009-09-15 Draka Communications   Proposal for revision of ITU-T Recommendation G.657 (Full text)     Q5/15, Q16/15  
[ 395 ]  
 
2009-09-14 PMC-Sierra   Further thoughts on the GMP CnD encoding     Q11/15  
[ 394 ]  
 
2009-09-14 Alcatel Shanghai Bell , CATR , MII   Rooted mp FDFr     Q12/15  
[ 393 ]  
 
2009-09-14 Ikanos Communications   G.vector: Minimum requirements for frequency-dependent modulation of probe tones     Q4/15  
[ 392 ]  
 
2009-09-15 Aware   G.hn: Alternate Probe Transmission for Channel Estimation     Q4/15  
[ 391 ]  
 
2009-09-14 Ikanos Communications   G.vector: Sub-sampling of reported error samples     Q4/15  
[ 390 ]  
 
2009-09-14 Ikanos Communications, Inc.   G.vector: Guidelines for setting values of Bmin, Bmax, and Lw in reporting of error samples.     Q4/15  
[ 389 ]  
 
2009-09-15 Aware   G.hn: PHY-frame Header Repetition     Q4/15  
[ 388 ]  
 
2009-09-14 ASSIA, Inc.   G.vector: Working text proposal for configuration, performance monitoring and test parameters section of G.vector     Q4/15  
[ 387 ]  
 
2009-09-14 ASSIA, Inc.   G.PLOAM: Working text proposal for new PLOAM parameters related to G.Vector     Q4/15  
[ 386 ]  
(Rev.1) 
2009-09-14 ZTE Corporation   G.int: Improve the transportation efficiency of the payload in ATM cells     Q4/15  
[ 385 ]  
 
2009-09-14 Juniper Networks, Inc. , Brilliant Telecommunication, Inc.   Inclusion of routers in core network description of WD16     Q13/15  
[ 384 ]  
 
2009-09-14 Brilliant Telecommunications, Inc.   Synchronization reference for frequency distribution     Q13/15  
[ 383 ]  
 
2009-09-14 Alcatel-Lucent   Failure and probable cause mapping for G.7710     Q14/15  
[ 382 ]  
 
2009-09-14 Alcatel-Lucent   Automatic control of the ODUkT TCM control function     Q9/15  
[ 381 ]  
 
2009-09-14 Alcatel-Lucent   Comments on draft Revision of Rec. G.7713     Q14/15  
[ 380 ]  
 
2009-09-10 Nokia Siemens   G.8032 Timers Description     Q9/15  
[ 379 ]  
 
2009-09-10 Cisco Ciena; China Telecom , AT&T , Broadcom Corporation , Ciena Corporation , Verizon   Methods for Measuring Multipoint Services Availability     Q9/15, Q10/15  
[ 378 ]  
 
2009-09-10 Brilliant Telecommunications, Inc.   IP address configuration for unicast message negotiation     Q13/15  
[ 377 ]  
 
2009-09-10 Broadcom   G.vdsl: G.993.2 initialization and memory split     Q4/15  
[ 376 ]  
 
2009-09-10 Broadcom   G.INP: Exchange of RRC look-back value     Q4/15  
[ 375 ]  
 
2009-09-10 Broadcom   G.INP: Various comments on G.INP draft     Q4/15  
[ 374 ]  
 
2009-09-10 Broadcom   G.INP: Clarification on EOC and counters     Q4/15  
[ 373 ]  
 
2009-09-10 United States of America   Open access requirements for bend insensitive single mode fibres     Q5/15  
[ 372 ]  
 
2009-09-09 United States of America   Reliability requirements for bend insensitive single-mode fibre     Q5/15, Q16/15  
[ 371 ]  
 
2009-09-09 United States of America   Modification to G.650.1     Q5/15  
[ 370 ]  
 
2009-09-09 Cisco systems, Inc.   Frame loss measures for multi-point EVCs     Q9/15, Q10/15  
[ 369 ]  
 
2009-09-09 Symmetricom, Inc   Maximum Rate for Unicast Negotiation     Q13/15  
[ 368 ]  
 
2009-09-09 Symmetricom, Inc   Clarification on Unicast/Multicast messages     Q13/15  
[ 367 ]  
 
2009-09-09 Symmetricom, Inc   Clarification of text in clause 7 of the draft version of G.8264.1     Q13/15  
[ 366 ]  
 
2009-09-09 Symmetricom, Inc   Maximum Rate for PTP Signaling Messages     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21