International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 440 ]  
 
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access     Huawei Technologies   Q9/15   2009-09-16
[ 439 ]  
 
Text proposal for clause 8/G.798.1     Huawei Technologies   Q9/15   2009-09-16
[ 438 ]  
 
Proposal to specify OCh/OTUkV_A with OTUk_CP     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 437 ]  
 
Multi-vendor demarcation in the OTN     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 436 ]  
 
LO and HO ODU view points and NNIs     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 435 ]  
 
Document withdrawn  
See C533
 
N/A     2009-09-16
[ 434 ]  
 
First models of OTN equipment proposal     Huawei Technologies   Q9/15   2009-09-16
[ 433 ]  
 
Multi-lane STM-256     AT&T   Q11/15   2009-09-16
[ 432 ]  
 
Optical Monitoring     AT&T   Q7/15, Q6/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 430 ]  
 
G.709 OTN domains     AT&T   Q11/15   2009-09-16
[ 429 ]  
 
G.8032 (Comments on Draft)     Nortel Networks (Canada)   Q9/15   2009-09-16
[ 428 ]  
 
Additional requirements for G.7718     Alcatel-Lucent , NTT   Q14/15   2009-09-16
[ 427 ]  
 
G.8032 (Access Protection)     Nortel Networks (Canada)   Q9/15   2009-09-16
[ 426 ]  
 
Eye Mask for 10G G.695     Nortel Networks (Canada)   Q6/15   2009-09-16
[ 425 ]  
 
Support for the approval of G.9960 and consent of G.hn Recommendations     Portugal Telecom   Q4/15   2009-09-15
[ 424 ]  
 
Proposal of fibre macrobending identification method     SoftBank Telecom   Q5/15   2009-09-15
[ 423 ]  
 
Considerations of Y.1731 Performance Monitoring     NEC Corporation   Q10/15   2009-09-15
[ 422 ]  
 
Configuration principle of interconnected rings in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 421 ]  
 
Considerations of guard timer in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 420 ]  
 
Considerations of FS state in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 419 ]  
 
Considerations of initial state in G.8032v2     NEC Corporation   Q9/15   2009-09-15
[ 418 ]  
 
Proposed text for equal priority requests in G.8031     NEC Corporation   Q9/15   2009-09-15
[ 417 ]  
 
Proposed modification for loss measurement process in G.8021     NEC Corporation   Q9/15   2009-09-15
[ 416 ]  
 
Draft new Recommendation L.limt "Low impact mini-trench installation technique"     Sirti SpA   Q16/15   2009-09-15
[ 415 ]  
 
Considerations about physical layer configurations for WSON     Ericsson   Q6/15   2009-09-15
[ 414 ]  
 
Proposal of architecture of G.omci     NTT   Q2/15   2009-09-15
[ 413 ]  
 
Proposal of home network remote management requirements on G.hntreq     NTT   Q1/15   2009-09-15
[ 412 ]  
(Rev.1) 
Latency Measurements in the Optical Transport Network Using G.709 Overhead     Verizon , AT&T , BT , Nokia Siemens Networks   Q9/15, Q11/15   2009-09-15
[ 411 ]  
 
Sublayers and WSON in G.872     Ciena Corp   Q12/15   2009-09-15
[ 410 ]  
 
An updated Topology model for WSON     Ciena Corp   Q12/15   2009-09-15
[ 409 ]  
 
Some thoughts on Transport Entities     Ciena Corp   Q12/15   2009-09-15
[ 408 ]  
 
Characteristic Information, Sublayers and Media     Ciena Corp   Q12/15   2009-09-15
[ 407 ]  
 
Mapping of 100GBASE-R into OPU4     Alcatel-Lucent   Q11/15   2009-09-15
[ 406 ]  
 
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Alcatel-Lucent   Q9/15, Q11/15   2009-09-15
[ 405 ]  
 
Adaptation of STM-256 over multichannel parallel interfaces     Alcatel-Lucent , Cisco , Finisar , Juniper   Q9/15, Q11/15   2009-09-15
[ 404 ]  
 
Propose to add Link discover Process based on OAM in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 403 ]  
 
Propose to add requirement of MAC topology management     ZTE Corporation   Q14/15   2009-09-15
[ 402 ]  
 
Propose to add MAC Link discover support in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 400 ]  
 
Propose to add requirement of discovery support on MPLS-TP NM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 399 ]  
 
CSF Indication for Y.1731 (Ethernet OAM)     Alcatel-Lucent   Q9/15, Q10/15   2009-09-15
[ 398 ]  
 
Correct power budget modelling of indoor access installations     Draka Communications   Q5/15, Q16/15   2009-09-15
[ 397 ]  
 
Proposal for revision of ITU-T Recommendation G.657 (Explanation)     Draka Communications   Q5/15, Q16/15   2009-09-15
[ 396 ]  
 
Proposal for revision of ITU-T Recommendation G.657 (Full text)     Draka Communications   Q5/15, Q16/15   2009-09-15
[ 395 ]  
 
Further thoughts on the GMP CnD encoding     PMC-Sierra   Q11/15   2009-09-14
[ 394 ]  
 
Rooted mp FDFr     Alcatel Shanghai Bell , CATR , MII   Q12/15   2009-09-14
[ 393 ]  
 
G.vector: Minimum requirements for frequency-dependent modulation of probe tones     Ikanos Communications   Q4/15   2009-09-14
[ 392 ]  
 
G.hn: Alternate Probe Transmission for Channel Estimation     Aware   Q4/15   2009-09-15
[ 391 ]  
 
G.vector: Sub-sampling of reported error samples     Ikanos Communications   Q4/15   2009-09-14
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29