International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 540 ]  
 
2009-09-18 KT Corporation   Proposal for a draft of new ITU-T Recommendation "Technical considerations on protecting outside plant facilities from natural disasters" L.tcosp     Q17/15  
[ 539 ]  
 
2009-09-18 NTT   Proposal for a revision of Recommendation G.696.1 for 100G application code     Q6/15  
[ 538 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modifications for sections 8.3.3.4.6 - 8.3.3.5     Q4/15  
[ 537 ]  
 
2009-09-18 Panasonic Corporation   Proposal to specify G.hn Management Messages for G.cx     Q4/15  
[ 536 ]  
 
2009-09-18 Panasonic Corporation   Request to mandate coexistence feature between ITU-T G.9960 and ISO/IEC 12139-1.     Q4/15  
[ 535 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposal for Smart Grid architecture based on G.hn     Q4/15  
[ 534 ]  
 
2009-09-18 Gigle Semiconductor   Ghn: Analysis and Proposal on the proposed dual FEC scheme     Q4/15  
[ 533 ]  
 
2009-09-18 Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation   HO and LO ODUk Shared Ring Protection (SRP)     Q9/15  
[ 532 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Up-convert frequency tolerance     Q4/15  
[ 531 ]  
 
2009-09-18 Calnex Solutions   Definition of methodology for the development of additional Test Cases for G.8261 Appendix VI.     Q13/15  
[ 530 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modifications in section 8.6.3 (Domain Master: Scheduling)     Q4/15  
[ 529 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modification for section 8.5 (Endpoint node capabilities)     Q4/15  
[ 528 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modification for section 8.6.7 (Topology maintenance)     Q4/15  
[ 527 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modification to align bit ordering in DLL     Q4/15  
[ 526 ]  
 
2009-09-18 Infineon Technologies AEG   G.hn: Proposed text modification in description of scheduled inactivity (§8.6.3)     Q4/15  
[ 525 ]  
 
2009-09-18 Alcatel-Lucent USA , Verizon   MAC Operations using Y.1731 PDU     Q10/15  
[ 524 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Proposal to determine BS/GS based on near-end information in G.8021     Q9/15  
[ 523 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021     Q9/15  
[ 522 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively     Q9/15  
[ 521 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   G.8031 state transition when WTR timers differ at both ends     Q9/15  
[ 520 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers     Q9/15  
[ 519 ]  
 
2009-09-18 Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   G.8031 state transitions when working recovers from SF     Q9/15  
[ 518 ]  
 
2009-09-18 Alcatel-Lucent USA   Maintaining the independence of the two ring interconnection options in G.8032v2     Q9/15  
[ 517 ]  
 
2009-09-18 Tellabs Oy   Applications requiring 2 stages of ODU multiplexing     Q11/15  
[ 516 ]  
 
2009-09-18 Alcatel-Lucent USA   Proposal to rename the "RPL Node" in G.8032v2     Q9/15  
[ 515 ]  
 
2009-09-18 Tellabs Oy   Clarification of external ODU in clause 7/G.709     Q11/15  
[ 514 ]  
 
2009-09-18 Alcatel-Lucent USA   Proposal to review and update G.8032 Study Points and Living List     Q9/15  
[ 513 ]  
 
2009-09-18 Tellabs Oy   Proposed clarification regarding GFP-F mappings for 10G Ethernet     Q11/15  
[ 512 ]  
 
2009-09-17 Alcatel-Lucent USA, AimValley BV   Proposed modifications to G.8021 and G.8032 for R-APS-specific dFOP-PM and dFOP-TO     Q9/15  
[ 511 ]  
 
2009-09-17 China Unicom   Proposal on Ethernet interfaces in optical fibre submarine cable systems     Q8/15  
[ 510 ]  
 
2009-09-17 LM Ericsson AB   G.vector : Proposal to include Loop diagnostics mode in G.vector     Q4/15  
[ 509 ]  
 
2009-09-17 Ericsson   Introductory text on NTP for frequency distribution in G.8264.1 and G.8261     Q13/15  
[ 508 ]  
 
2009-09-17 Vitesse Semiconductor (USA)   Proposed Addition of CI-BCH eFEC to G.975.1     Q8/15  
[ 507 ]  
 
2009-09-17 Ericsson   Applicability of the Q-factor measurement method to non-OOK optical signals     Q6/15  
[ 506 ]  
 
2009-09-17 N/A   Document withdrawn     N/A  
[ 505 ]  
 
2009-09-17 Huawei Technologies   Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands     Q13/15, Q11/15  
[ 504 ]  
 
2009-09-17 Huawei Technologies   Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands     Q13/15, Q11/15  
[ 503 ]  
 
2009-09-17 NSN   G.8032v2 Priority Logic description update     Q9/15  
[ 502 ]  
 
2009-09-17 Huawei Technologies   1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands     Q13/15, Q11/15  
[ 501 ]  
 
2009-09-17 Huawei Technologies   Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses     Q13/15, Q11/15  
[ 500 ]  
 
2009-09-17 Nortel Networks (Canada)   Frequency grid for GPON wavelength converted Reach Extenders     Q6/15, Q2/15  
[ 499 ]  
 
2009-09-17 Nortel Networks (Canada)   Revision of wavelength allocation grid in G.984.6Am1     Q2/15  
[ 498 ]  
 
2009-09-17 Nortel Networks (Canada)   Updation of the text providing example of single fibre WC-enabled seeded RE units     Q2/15  
[ 497 ]  
 
2009-09-17 Nortel Networks (Canada)   Clarifications to G.7713     Q14/15  
[ 496 ]  
 
2009-09-17 Ericsson   G.8264.1 proposals     Q13/15  
[ 495 ]  
 
2009-09-17 Ericsson   ESMC SSM Extension: discussion on the Node Identifier     Q13/15  
[ 494 ]  
 
2009-09-17 Nortel Networks (Canada)   Transitional Links as SNPP Links     Q12/15  
[ 493 ]  
 
2009-09-17 Ericsson   ESMC-SSM Extensions proposals     Q13/15  
[ 492 ]  
 
2009-09-17 Ikanos Communications, Infineon Technologies NA   G.inp: Comments on Section 8.1.4, framing type 4     Q4/15  
[ 491 ]  
 
2009-09-17 Nortel Networks (Canada)   ESMC Receive state machine     Q13/15  
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21