International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 815 ]  
 
G.inp: Clarification to RRC Codeword Redundancy Generation     Ikanos Communications   Q4/15   2010-05-16
[ 814 ]  
 
G.inp: Operation of OLR with Retransmission     Ikanos Communications   Q4/15   2010-05-16
[ 813 ]  
 
G.vdsl: Method for phase synchronizing VDSL local clocks in support of ToD Transport     Ikanos Communications   Q4/15   2010-05-16
[ 812 ]  
 
G.vdsl: Method for Transporting Time-of-Day in VDSL2 Systems     Ikanos Communications   Q4/15   2010-05-16
[ 811 ]  
 
Distributed Boundary and Transparent Clocks     ADTRAN , Calix , Symmetricom   Q4/15, Q2/15, Q13/15   2010-05-16
[ 810 ]  
 
MPI test methods in short cables - Justification for modification of Appendix in G.650.1     OFS-Fitel   Q5/15   2010-05-16
[ 809 ]  
 
Support of SSM for Synchronous Ethernet in OMCI     ADTRAN   Q2/15, Q13/15   2010-05-16
[ 808 ]  
 
Proposal for Appendix I in G.657     OFS-Fitel   Q5/15   2010-05-16
[ 807 ]  
 
G.hn Management and Diagnostics Specifications     AT&T   Q4/15   2010-05-16
[ 806 ]  
 
Proposed ITU-T Rec. on remote management of CPE     AT&T , ASSIA Inc , Qwest , Verizon   Q4/15, Q2/15, Q1/15   2010-05-16
[ 805 ]  
 
SLM extensions to G.8021     Cisco , ADVA , EXFO , Extreme Networks   Q9/15, Q10/15   2010-05-16
[ 804 ]  
 
SyncE Jitter tolerance values     Deutsche Telekom   Q13/15   2010-05-14
[ 803 ]  
 
Examples of using cluster selection & metrics [G.8260, G.8261.1, G.8263]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 802 ]  
 
Liaison to IEEE 802.1 about TC & 802.1Q violation [G.8275.1]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 801 ]  
 
Possible 'basestation' masks [G.8261.1]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 800 ]  
 
Comparison of MTIE in time and frequency domain [G.8260, G.8261.1, G.8263]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 799 ]  
 
Interpolation of pre-processed metrics [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 798 ]  
 
Definition of clusterTDEV [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 797 ]  
 
Change definition of cluster selection [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 796 ]  
 
Definition of cluster selection (augmented) [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 795 ]  
 
Key performance indicators for cluster usage (e.g. FWPR) [G.8260]     Zarlink Semiconductor   Q13/15   2010-05-14
[ 794 ]  
 
G.827x High Level Requirements     IDT   Q13/15   2010-05-14
[ 793 ]  
 
Unicast Master Table     IDT   Q13/15   2010-05-14
[ 792 ]  
 
G.8265.1 editorial comments     IDT   Q13/15   2010-05-14
[ 791 ]  
 
G.8265.1 clause 6.2.1     IDT   Q13/15   2010-05-14
[ 790 ]  
 
Concern with bandwidth degrade notification for Y.1731     Canada   Q9/15, Q10/15   2010-05-14
[ 789 ]  
 
Concern with G.ptneq & E-OTN     Canada   Q9/15, Q12/15   2010-05-14
[ 788 ]  
 
Concern with ETREE proposal for G.ptneq & E-OTN     Canada   Q9/15, Q10/15   2010-05-14
[ 787 ]  
 
Document withdrawn (see TD 317/WP3)     N/A     2010-05-14
[ 786 ]  
 
Ethernet Proactive Frame Delay Measurement     Alcatel-Lucent Italy   Q9/15, Q14/15, Q10/15   2010-05-14
[ 785 ]  
 
Proposed ITU-T Rec. on remote management of CPE     Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia   Q4/15, Q2/15, Q1/15   2010-05-14
[ 784 ]  
 
Request for revising ITU-T Rec. G.9960 Unified high-speed wire-line based home networking transceivers - Foundation     Federal Republic of Germany   Q4/15   2010-05-12
[ 783 ]  
 
Support for the approval of G.9961, G.9960 Corrigendum 1, and G.9972 Recommendations     Federal Republic of Germany   Q4/15   2010-05-12
[ 782 ]  
 
Proposed New Recommendation on remote management of CPE over broadband networks - CPE WAN Management Protocol (CWMP)     Alcatel-Lucent Bell NV   Q4/15, Q2/15, Q1/15   2010-05-12
[ 781 ]  
 
Proposed text for the revision of ITU-T Recommendation G.7712     Alcatel-Lucent   Q14/15   2010-05-11
[ 780 ]  
 
Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport     France Télécom , Cisco   Q13/15   2010-05-10
[ 779 ]  
 
Proposed Primary Reference Time Clock Performance for G.8271     Symmetricom, LSI   Q13/15   2010-05-10
[ 778 ]  
 
Proposed jitter specifications for O.174     JDSU   Q15/15   2010-05-11
[ 777 ]  
 
G.873.2 text proposal for Sections 7.1 and following     Alcatel Lucent Germany   Q9/15   2010-05-11
[ 776 ]  
 
G.873.2 text for wrapping versus steering comparison     Alcatel Lucent Germany   Q9/15   2010-05-10
[ 775 ]  
 
Support for the mixed unicast/multicast mode of operation in G.8265.1     Symmetricom   Q13/15   2010-05-10
[ 774 ]  
 
PDV histogram plot for G.8260 Appendix I     Symmetricom   Q13/15   2010-05-10
[ 773 ]  
 
Measurement configuration for PDV measurements     Symmetricom   Q13/15   2010-05-10
[ 772 ]  
 
Relationship of PDV metrics to PTP slave performance     Symmetricom   Q13/15   2010-05-10
[ 771 ]  
 
xTDEV/MAFE Definitions and Usage for G.8260 Appendix     Symmetricom , Nokia-Siemens   Q13/15   2010-05-10
[ 770 ]  
 
Definition of Time Error and PDV for packet timing signals     Symmetricom   Q13/15   2010-05-10
[ 769 ]  
 
Definition of Packet Delay Variation (PDV) for timing applications     Symmetricom   Q13/15   2010-05-10
[ 768 ]  
 
Definition of "Packet Based Method" in G.8260     Symmetricom   Q13/15   2010-05-10
[ 767 ]  
 
The need for multiple protocol instances in PTP slaves     Symmetricom   Q13/15   2010-05-10
[ 766 ]  
 
Comments by John Eidson on the PTP Telecom Profile for Frequency Distribution     Symmetricom   Q13/15   2010-05-10
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29