Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1015 ]
|
G.cx: Proposal for additional changes before approval
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 1014 ]
|
G.hnem: Proposal for G.hnem constellation mappings
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 1013 ]
|
G.hnem: Advantage of coherent mappings for G.hnem
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 1012 ]
|
Living List for XG-PON Transmission Convergence layer specification
|
Huawei
,
Mitsubishi
,
Motorola
|
Q2/15
|
2010-05-20 |
|
[ 1011 ]
|
Proposed changes to add MMM
|
DS2
|
Q4/15
|
2010-05-20 |
|
[ 1010 ]
|
Multi-Medium Mode: Default operational mode for G.9960 when in a multi-medium domain
|
DS2
|
Q4/15
|
2010-05-20 |
|
[ 1009 ]
|
AMI application support Appendix for G.9960 and G.9961
|
DS2
|
Q4/15
|
2010-05-20 |
|
[ 1008 ]
|
Concatenated Code For ITU-T G.hnem
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1007 ]
|
G.hnem APC for Interfacing to IPv6
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1006 ]
|
G.hnem Addressing Scheme
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1005 ]
|
G.hnem Relaying Functionality
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1004 ]
|
G.hnem Segmentation and Reassembly Mechanism
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1003 ]
|
G.hnem LCC Frame Format
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1002 ]
|
G.hnem Coherent Modulation Considerations
|
Yitran
|
Q4/15
|
2010-05-20 |
|
[ 1001 ]
|
Equivalence of the IEEE 1588 Boundary Clock and Peer-to-Peer Transparent Clock for Synchronization Transport
|
Huawei
|
Q13/15
|
2010-05-20 |
|
[ 1000 ]
|
Scale factors for ADSL2+ Virtual Noise
|
BT
|
Q4/15
|
2010-05-20 |
|
[ 999 ]
|
Functional Model of Hitless Adjustment of ODUflex
|
Huawei
|
Q9/15
|
2010-05-20 |
|
[ 998 ]
|
G.inp: On Retransmission REIN overhead formula
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 997 ]
|
G.inp: Further comments on SRA Proposals for G.998.4
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 996 ]
|
Comments and way forward for distribution of ToD over VDSL2 links
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 995 ]
|
Treatment of delay jumps in relation with MAFE/MATIE
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 994 ]
|
Packet metrics applied to two-way delay patterns
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 993 ]
|
Analysis of the floor delay window method
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 992 ]
|
Applicability of MATIE as a phase stability metric
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 991 ]
|
Document withdrawn
|
Ericsson
|
Q6/15
|
2010-05-20 |
|
[ 990 ]
|
G.827x Slave Clock specification (for time)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 989 ]
|
Q13 Requirements structure for time supply (G.827x)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 988 ]
|
Input for G.827x Slave clock specification
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 987 ]
|
SyncE Jitter tolerance (high frequency)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 986 ]
|
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 985 ]
|
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 984 ]
|
KL0bis and Estimation of Electrical Length in VDSL2
|
BT
|
Q4/15
|
2010-05-20 |
|
[ 983 ]
|
Document withdrawn
|
N/A
|
|
2010-05-20 |
|
[ 982 ]
|
G.vdsl2: KL0bis Estimation for the optional Equalized FEXT UPBO method
|
Deutsche Telekom
|
Q4/15
|
2010-05-20 |
|
[ 981 ]
|
Extension of Appendix I/G.806 to include waveband switching
|
NTT
|
Q9/15
|
2010-05-20 |
|
[ 980 ]
|
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798
|
Huawei
,
Alcatel-Lucent Germany
|
Q9/15, Q13/15
|
2010-05-20 |
|
[ 979 ]
|
Generic abbreviations for advanced modulation formats in G.Sup39
|
Ericsson
|
Q6/15
|
2010-05-20 |
|
[ 978 ]
|
Applicability of Jitter Requirements for SyncE interfaces
|
Calnex Solutions
|
Q13/15
|
2010-05-20 |
|
[ 977 ]
|
Transport of accurate Time Synchronization over access technologies
|
Ericsson
|
Q4/15, Q2/15, Q13/15
|
2010-05-20 |
|
[ 976 ]
|
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having ±100 ppm Frequency Tolerance
|
Huawei
,
Alcatel-Lucent Germany
|
Q13/15
|
2010-05-19 |
|
[ 975 ]
|
ADSL2/ADSl2plus: L2bis mode operator requirements
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 974 ]
|
G.gen: G.vector: G.vdsl: G.hs: Proposal for G.993.2 Annex: G.vector friendly G.993.2 operation
|
Alcatel-Lucent
,
Bell N.V.
|
Q4/15
|
2010-05-19 |
|
[ 973 ]
|
G.LT - Impulsive Noise Measurement
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 972 ]
|
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 971 ]
|
G.hn: Broadcast Radio Protection
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 970 ]
|
Timing Transparency over OTN
|
Alcatel-Lucent Germany
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 969 ]
|
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 968 ]
|
G.LT Transmit PSD and Local Regulation
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 967 ]
|
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 966 ]
|
Proposed jitter tolerance specifications for G.8262
|
JDSU
|
Q13/15
|
2010-05-19 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):