Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1290 ]
|
2011-02-01 |
Cisco
,
AT&T
|
Reporting of results for pro-active measurement using SLM
|
Q9/15
|
|
[ 1289 ]
|
2011-02-01 |
Korea
|
Draft of new ITU-T Recommendation "Disaster managements for outside plant facilities" L.dmosp
|
Q17/15
|
|
[ 1288 ]
|
2011-01-31 |
Nokia Siemens Networks GmbH & Co. KG, Germany
|
Extension of Rec. G.694.1 by a new clause to address flexible frequency grids
|
Q6/15
|
|
[ 1287 ]
|
2011-01-31 |
Adtran
,
Calix
,
PMC-Sierra
|
G.987.3: Draft Text for Transparent Clock Mechanism
|
Q2/15, Q13/15
|
|
[ 1286 ]
|
2011-01-31 |
Adtran
,
Calix
,
PMC-Sierra
|
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model
|
Q2/15, Q13/15
|
|
[ 1285 ]
|
2011-01-31 |
WIND
|
Associated Channel Type for G.tpoam
|
Q12/15
|
|
[ 1284 ]
|
2011-01-31 |
NTT
|
Proposal of subjects to be discussed regarding flexible grids
|
Q6/15
|
|
[ 1283 ]
|
2011-01-31 |
Draka Communications
|
G.657 Bend insensitive fibre splice compatibility
|
Q5/15
|
|
[ 1282 ]
|
2011-01-31 |
Draka Communications
|
Multi Path Interference (MPI), background and experimental results
|
Q5/15
|
|
[ 1281 ]
|
2011-01-31 |
ZTE
|
Proposed texts for G.smp
|
Q9/15
|
|
[ 1280 ]
|
2011-01-31 |
ZTE
|
Automatic Protection Switching (APS) protocol for Shared Mesh Protection
|
Q9/15
|
|
[ 1279 ]
|
2011-01-31 |
ZTE
|
Consideration on TS sequence in HAO
|
Q14/15, Q12/15, Q11/15
|
|
[ 1278 ]
|
2011-01-31 |
Swisscom
|
G.vdsl: Support for text proposal for Attainable Net Data rate
|
Q4/15
|
|
[ 1277 ]
|
2011-01-31 |
ZTE
|
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO
|
Q11/15
|
|
[ 1276 ]
|
2011-01-31 |
Swisscom
|
G.vdsl: Support for text proposal for Short Interruption Monitoring
|
Q4/15
|
|
[ 1275 ]
|
2011-01-31 |
Telecom Italia
|
Main characteristics of a Reconfigurable Multi-degree Optical Node
|
Q7/15
|
|
[ 1274 ]
|
2011-01-31 |
Swisscom
|
G.vdsl: Support for Alternative Electrical Length Estimation Method
|
Q4/15
|
|
[ 1273 ]
|
2011-01-31 |
Alcatel-Lucent Germany
|
Issues with TCM section monitoring and CA
|
Q9/15
|
|
[ 1272 ]
|
2011-01-31 |
Semtech
|
Relevant Clauses for J.211
|
Q13/15
|
|
[ 1271 ]
|
2011-01-31 |
Alcatel-Lucent Germany
|
Correction of mistakes in ODU connection function processes in G.798
|
Q9/15
|
|
[ 1270 ]
|
2011-01-31 |
Mitsubishi
,
Ericsson
,
Hitachi
,
NTT
|
Proposal for OMCI in EPON
|
Q2/15
|
|
[ 1269 ]
|
2011-01-31 |
Huawei
|
Proposed text for inclusion in Y.1731 for Frame Loss Measurement
|
Q9/15, Q10/15
|
|
[ 1268 ]
|
2011-01-31 |
CIAJ
|
Jitter evaluation methods for burst signal at XG-PON interfaces
|
Q15/15
|
|
[ 1267 ]
|
2011-01-31 |
Deutsche Telekom
|
G.8272 PRTC type approval process proposal
|
Q13/15
|
|
[ 1266 ]
|
2011-01-31 |
Deutsche Telekom
|
G.8272 PRTC Options: Temperature
|
Q13/15
|
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58 -
59 -
60 -
61 -
62 -
63 -
64 -
65 -
66 -
67 -
68 -
69 -
70 -
71 -
72 -
73 -
74 -
75 -
76 -
77 -
78 -
79 -
80 -
81 -
82 -
83 -
84 -
85 -
86 -
87 -
88 -
89 -
90 -
91 -
92 -
93 -
94 -
95 -
96
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):