International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2012-09-10 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2012-09-10) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:59 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: Huawei Technologies Co. Ltd ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2380 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: Minimum Duration of Transmission Opportunity     Q4A/15  
[ 2343 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   The TVL of Signaling message     Q13/15  
[ 2341 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   The effect of MAC control pause operation for PTP synchronization     Q13/15  
[ 2340 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   Test error of PRTC     Q13/15  
[ 2339 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   PHY and intra-node noise error     Q13/15  
[ 2338 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis about SyncE rearrangement for different message delays of G.781     Q13/15  
[ 2322 ]  
(Rev.1) 
2012-08-28 France Télécom Orange , Huawei Technologies Co. Ltd. , Portugal Telecom, SGPS, S.A. , Swisscom SA , Telecom Italia S.p.A. , Telefónica, S.A. , Telstra Corporation Ltd. , Verizon Communication Corporation , ZTE Corporation   Terminology for Sub-Lambda Photonically Switched Network (SLPSN)     Q3/15, Q12/15  
[ 2309 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: On Net Coding Gain     Q4A/15  
[ 2302 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.fast: First DMT Symbol After Inactivity Period     Q4A/15  
[ 2301 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   G.vector: Extending maximum duration of O-P-VECTOR 1 signal     Q4A/15  
[ 2268 ]  
 
2012-08-28 Huawei Technologies Co. Ltd.   Proposed text and figures for Appendix II/G.8012.1     Q10/15  
[ 2246 ]  
+Corr.1 
2012-08-28 FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Serial data acquisition by XGPON     Q2/15  
[ 2245 ]  
 
2012-08-28 Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   DVB_ASI Jitter Accumulation over OTN Islands     Q9/15, Q13/15  
[ 2244 ]  
 
2012-08-28 Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   Criterion for Minimum Detectable Floor Delay Step using minMATIE     Q13/15  
[ 2243 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Effect of Turnaround on Time Transport Performance using PTP     Q13/15  
[ 2242 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport     Q13/15  
[ 2241 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support     Q13/15  
[ 2240 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     Q13/15  
[ 2239 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     Q13/15  
[ 2238 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     Q13/15  
[ 2237 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     Q13/15  
[ 2235 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     Q13/15  
[ 2214 ]  
 
2012-08-28 Huawei Technologies Co. Ltd. , Infinera Corporation   Comparison of ODU SMP Activation protocols     Q9/15  
[ 2196 ]  
 
2012-08-27 Huawei Technologies Co. Ltd.   Proposal for adaptive bandwidth in Ethernet ring     Q9/15  
[ 2193 ]  
 
2012-08-27 Huawei Technologies Co. Ltd.   Clarification on adaptive bandwidth for G.808.1     Q9/15  
Results:59 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-8-27