International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2012-09-10 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2012-09-10) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:67 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ Source: China ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 2351 ]  
 
2012-08-28 British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT)   Scope of Q2, as applies to access vs. OTN     Q6/15, Q2/15, Q12/15  
[ 2339 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   PHY and intra-node noise error     Q13/15  
[ 2338 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis about SyncE rearrangement for different message delays of G.781     Q13/15  
[ 2281 ]  
 
2012-08-28 China Telecommunications Corporation   The considerations about beyond 100G OTN requirements     Q6/15, Q12/15, Q11/15  
[ 2280 ]  
(Rev.1) 
2012-08-28 China Unicom   Proposal for modification of G.697 for high bitrates DWDM System     Q6/15  
[ 2279 ]  
(Rev.1-2) 
2012-08-28 China Unicom   Next Generation Metro WDM     Q6/15  
[ 2278 ]  
(Rev.1) 
2012-08-28 China Unicom   Low cost metro systems: proposed scope for a new Recommendation     Q6/15  
[ 2277 ]  
(Rev.1) 
2012-08-28 China Unicom   Clarification for the concerns on Next Generation Metro WDM     Q6/15  
[ 2276 ]  
 
2012-08-28 China Unicom   Concerns regarding the packet selection methods for the PEC     Q13/15  
[ 2275 ]  
 
2012-08-28 China Unicom   Proposals for specifying relative aspects of T-BC recommended in G.8273.2     Q13/15  
[ 2274 ]  
 
2012-08-28 China Unicom   G.8273.3: Proposals about the functions of T-TC devices based on experimental results     Q13/15  
[ 2273 ]  
(Rev.1) 
2012-08-28 China Unicom   Consideration on protection interworking between SMP and other protection techniques     Q9/15  
[ 2270 ]  
(Rev.1) 
2012-08-28 China Unicom   ITU-T study item discussion on transport network with backhaul traffic optimization     Q12/15  
[ 2267 ]  
(Rev.1) 
2012-08-28 China Unicom   Some requirements for performance measurement methods in 100G DWDM system     Q6/15  
[ 2266 ]  
(Rev.1) 
2012-08-28 China Unicom   Scenario suggestion on protection interworking between MSTP and packet transport network     Q9/15  
[ 2265 ]  
(Rev.1-2) 
2012-08-28 China Unicom   Application Scenario for ODU SMP Deployment in telecom operator's network     Q9/15  
[ 2264 ]  
 
2012-08-28 China Unicom   Consideration on ODU SMP Protection Characteristics     Q9/15  
[ 2261 ]  
(Rev.1) 
2012-08-28 China Unicom   Some requirements of noise classification in 100G DWDM system     Q6/15  
[ 2260 ]  
 
2012-08-28 China Unicom   Proposal for adding Nyquist WDM in to section 7 7 in G sup39     Q6/15  
[ 2259 ]  
(Rev.1) 
2012-08-28 China , China Unicom , ZTE Corporation   Proposal for defining a parameter about I- and Q- imbalance     Q6/15  
[ 2243 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Effect of Turnaround on Time Transport Performance using PTP     Q13/15  
[ 2242 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport     Q13/15  
[ 2241 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support     Q13/15  
[ 2240 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     Q13/15  
[ 2239 ]  
 
2012-08-28 China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     Q13/15  
Results:67 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-24