Contributions
[ Questions: Q9/15 ]  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 1747 ]
(Rev.1) |
2011-11-22 |
ZTE Corporation
|
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2
|
Q9/15
|
|
[ 1740 ]
(Rev.1) |
2011-11-22 |
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Initiation Proposal of Multipoint Ethernet Connection Protection (MECP) study item in Q9/15
|
Q9/15
|
|
[ 1739 ]
(Rev.1) |
2011-11-22 |
Ericsson UK
|
Guidelines for interworking Protection schemes
|
Q9/15
|
|
[ 1722 ]
(Rev.1) |
2011-11-21 |
AT&T, Inc.
|
G.798 PT Interworking Smart?
|
Q9/15
|
|
[ 1717 ]
(Rev.1) |
2011-11-21 |
Alcatel-Lucent USA Inc.
|
Progressing MPLS-TP OAM, Equipment, and Management Recommendations
|
Q9/15, Q12/15, Q10/15
|
|
[ 1716 ]
(Rev.1) |
2011-11-21 |
Nokia Siemens Networks GmbH & Co. KG
|
SMP Protocol Functionality
|
Q9/15
|
|
[ 1714 ]
(Rev.1) |
2011-11-21 |
Nokia Siemens Networks GmbH & Co. KG
|
Development of G.SMP
|
Q9/15
|
|
[ 1712 ]
(Rev.1) |
2011-11-21 |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
G.8131 Single Document
|
Q9/15
|
|
[ 1709 ]
(Rev.1) |
2011-11-21 |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Updated text for G.8131/Y.1382
|
Q9/15
|
|
[ 1704 ]
|
2011-11-21 |
Korea (Rep. of)
|
Considerations for G.8031 corrigendum
|
Q9/15
|
|
[ 1694 ]
|
2011-11-21 |
China
,
China Mobile Communications Corporation
|
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
Withdrawn
|
Q9/15, Q14/15, Q12/15, Q10/15
|
|
[ 1692 ]
(Rev.1) |
2011-11-21 |
Nokia Siemens Networks GmbH & Co. KG
|
Inconsistencies in G.829 following corrigendum 2007
|
Q9/15
|
|
[ 1690 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal to study the convergence of PON and transport network in the next study period
|
Q9/15, Q3/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
|
[ 1689 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal to study the convergence of optical and packet in the next study period
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
|
[ 1688 ]
(Rev.1) |
2011-11-21 |
ZTE Corporation
|
Proposal for joint discussion about flexible grid network
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
|
[ 1687 ]
|
2011-11-21 |
Alcatel-Lucent Bell N.V.
|
Propose update G.8031/G.8032 to support Multipoint Ethernet connection protection
|
Q9/15
|
|
[ 1682 ]
(Rev.1-2) |
2011-11-21 |
Alcatel-Lucent Deutschland AG
|
Proposal of supported functions in the first version of G.873.2
|
Q9/15
|
|
[ 1680 ]
(Rev.1-2) |
2011-11-21 |
Alcatel-Lucent Deutschland AG
|
G.798 proposal for dealing with incoming frame slips (LL Study point 2)
|
Q9/15
|
|
[ 1678 ]
(Rev.1-3) |
2011-11-21 |
ITEK
|
G.798 MSI processing
|
Q9/15
|
|
[ 1677 ]
(Rev.1) |
2011-11-21 |
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Draft contents of new Recommendation G.odusmp
|
Q9/15
|
|
[ 1666 ]
(Rev.1) |
2011-11-21 |
Fujitsu Limited
|
Proposed mechanism and format for 1SL
|
Q9/15, Q10/15
|
|
[ 1665 ]
(Rev.1) |
2011-11-21 |
Fujitsu Limited
|
Proposed input for progressing Distributed Network Protection (DNP) with interworking
|
Q9/15
|
|
[ 1664 ]
(Rev.1) |
2011-11-21 |
Fujitsu Limited
|
Comments and proposal on the clause 8 in draft G.873.2
|
Q9/15
|
|
[ 1663 ]
(Rev.1) |
2011-11-21 |
Fujitsu Limited
|
Proposed the use of PCC for constructing a ringmap
|
Q9/15
|
|
[ 1661 ]
(Rev.1) |
2011-11-21 |
Fujitsu Limited
|
Comments on cd01 G.798 draft Amendment 2 for consent
|
Q9/15
|
Results:123 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):