International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:35 total items.
Contributions  [ AI/Question: Q14/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1937 ]  
 
Mapping of G.798 atomic functions to G.874.1 object classes     Deutsche Telekom AG   Q14/15   2011-11-23
[ 1912 ]  
 
Maintaining the common OTN functional model in draft revised G.872     Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation   Q9/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1901 ]  
(Rev.1) 
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1897 ]  
(Rev.1) 
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1853 ]  
(Rev.1) 
Alignment on dUNP between Y.1731 and G.8021     Alcatel-Lucent Italia S.p.A.   Q9/15, Q14/15, Q10/15   2011-11-22
[ 1847 ]  
 
China Propose to make progress on MPLS-TP OAM Standardization     China   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1844 ]  
 
Requirements for L0/L1/L2 Multi-layer Convergence Network     China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1843 ]  
 
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results     China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1838 ]  
 
G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3     Alcatel-Lucent Bell N.V.   Q9/15, Q14/15   2011-11-22
[ 1837 ]  
 
Withdrawn - Duplicate of C-1838  
Forthcoming
 
Alcatel-Lucent Bell N.V.   Q9/15, Q14/15   2011-11-22
[ 1822 ]  
(Rev.1) 
Considerations about PTN and PSN applications for MPLS-TP     Italy   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1821 ]  
(Rev.2) 
Considerations about collaboration between ITU-T and IETF on MPLS-TP     Italy   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1818 ]  
(Rev.1) 
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Huawei Technologies Co. Ltd.   Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1763 ]  
(Rev.1) 
Consideration on the use of a new Ethertype for MPLS-TP     Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1756 ]  
(Rev.1) 
MPLS-TP OAM Recommendations - Proposed way forward     Japan   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1754 ]  
(Rev.1) 
Proposal of new recommendation on multi layer converged transport network (G.mlctn)     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1753 ]  
(Rev.1) 
Draft of multi layer converged network informative document     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1744 ]  
(Rev.1) 
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON     ZTE Corporation   Q14/15, Q12/15   2011-11-22
[ 1694 ]  
 
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results  
Withdrawn
 
China , China Mobile Communications Corporation   Q9/15, Q14/15, Q12/15, Q10/15   2011-11-21
[ 1690 ]  
(Rev.1) 
Proposal to study the convergence of PON and transport network in the next study period     ZTE Corporation   Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-21
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1688 ]  
(Rev.1) 
Proposal for joint discussion about flexible grid network     ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-21
[ 1610 ]  
(Rev.1) 
Management of G.872 v2 (aon)     Ciena Corporation   Q14/15, Q12/15   2011-11-19
[ 1576 ]  
(Rev.1) 
ODUflex related extensions to information model in G.874.1     Infinera Corporation   Q14/15   2011-11-18
[ 1575 ]  
(Rev.1) 
Mapping between G.798 atomic functions and G.874.1 managed objects     Infinera Corporation   Q14/15   2011-11-18
[ 1568 ]  
 
Proposal and Comments on MPLS-TP     Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-18
[ 1562 ]  
(Rev.1-2) 
Proposed OAM management added to the new draft recommendation G.8152     ZTE Corporation   Q14/15   2011-11-18
[ 1559 ]  
(Rev.1) 
Proposed text about alarm management added to the new draft recommendation G.8152     ZTE Corporation   Q14/15   2011-11-18
[ 1558 ]  
(Rev.1) 
Proposed text about performance management added to the new draft recommendation G.8152     ZTE Corporation   Q14/15   2011-11-18
[ 1557 ]  
(Rev.1) 
Proposed text about the pseudo-wire(PW) added to the new draft recommendation G8152     ZTE Corporation   Q14/15   2011-11-18
[ 1555 ]  
(Rev.1) 
Proposal about use cases for MPLS-TP OAM management in G.8152     FiberHome Technologies Group   Q14/15   2011-11-18
[ 1554 ]  
(Rev.1) 
Proposals about OTN failure and probable cause mapping for G.7710     FiberHome Technologies Group   Q14/15   2011-11-18
[ 1553 ]  
(Rev.1) 
Comments on the DCN Management for G.7710     FiberHome Technologies Group   Q14/15   2011-11-18
[ 1542 ]  
(Rev.1) 
G.8080 - SP10 - Call Routing Discussion     Ciena Canada   Q14/15, Q12/15   2011-11-17
[ 1541 ]  
(Rev.1) 
G.7044 impact on G.7713     Ciena Canada   Q14/15, Q11/15   2011-11-17
Results:35 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25