International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:420 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1638 ]  
(Rev.1) 
Polarization dependence of MPI measurements     OFS Fitel, LLC   Q5/15   2011-11-21
[ 1637 ]  
(Rev.1) 
OFS Comments on splice loss determination in MPI measurements     OFS Fitel, LLC   Q5/15   2011-11-21
[ 1636 ]  
(Rev.1) 
Inclusion of Free Spectral Range measurement in MPI G.650.1 appendix     OFS Fitel, LLC   Q5/15   2011-11-21
[ 1635 ]  
(Rev.1) 
OFS Comments on possible changes in G.654     OFS Fitel, LLC   Q5/15   2011-11-21
[ 1634 ]  
(Rev.1) 
G.fast: Review of G.fast Simulation Data Relative to Shared Access     Ikanos Communications   Q4/15   2011-11-21
[ 1633 ]  
(Rev.1) 
A shared mesh protection protocol based on hop-by-hop activation     Tellabs Oy   Q9/15   2011-11-21
[ 1632 ]  
(Rev.1) 
A mechanism for active coordination of nested recovery actions     Tellabs Oy   Q9/15   2011-11-21
[ 1631 ]  
(Rev.1) 
G.inp, G.vector, VDSL2: Proposed Updated Framework for Extended Memory Operation     Broadcom Corporation , Ikanos Communications , Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2011-11-21
[ 1630 ]  
(Rev.1) 
Proposed clarification to clause 7.2.4.1.1 in G.873.2     Tellabs Oy   Q9/15   2011-11-21
[ 1629 ]  
(Rev.1) 
Editorial updates to draft G.873.2     Tellabs Oy   Q9/15   2011-11-21
[ 1628 ]  
(Rev.1) 
Criteria for estimation of high MPI     SOFTBANK TELECOM Corp.   Q5/15   2011-11-21
[ 1627 ]  
(Rev.1) 
Clarifying OTN maintenance signal interactions in G.798.1     Tellabs Oy   Q9/15   2011-11-21
[ 1626 ]  
(Rev.1) 
Proposal on draft text of Appendix I of L.dwpg     Nippon Telegraph and Telephone Corporation (NTT)   Q18/15   2011-11-21
[ 1625 ]  
(Rev.1) 
Proposal on draft text of Appendix I of L.dmosp     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2011-11-21
[ 1624 ]  
(Rev.1) 
A Proposal of the draft new Recommendation G.mecp     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2011-11-21
[ 1623 ]  
 
Elaboration on G.8110.1 AAP Comment Regarding Uniform Model Text     Cisco Systems, Inc. , Ericsson, Inc. , Extreme Networks   Q9/15, Q12/15   2011-11-20
[ 1622 ]  
 
Approving G.8113.1 establishes a bad precedent for ITU-T SG 15     Cisco Systems, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   QALL/15   2011-11-20
[ 1621 ]  
(Rev.1) 
Providing experience and information for ITU-T new recommendation L.xxx     China , FiberHome Technologies Group   Q16/15   2011-11-20
[ 1620 ]  
(Rev.1) 
Proposal on the 1588v2 over OTN by OSC     FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1619 ]  
(Rev.1) 
The proposal on Sub-Wavelength Cross Connect (SWXC) Type II in G798.1     China Mobile Communications Corporation , FiberHome Technologies Group   Q9/15   2011-11-19
[ 1618 ]  
(Rev.1) 
Modification on equipment type figures in G798.1     China Mobile Communications Corporation , FiberHome Technologies Group   Q9/15   2011-11-19
[ 1617 ]  
 
Withdrawn: Duplicate of C-1620  
Withdrawn
 
FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1616 ]  
(Rev.1-2) 
Concern with EOTN and MOTN     Fiberhome Technologies Group   Q9/15   2011-11-19
[ 1615 ]  
(Rev.1) 
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)     Ciena Corporation   Q9/15, Q11/15   2011-11-19
[ 1614 ]  
(Rev.1) 
Protection switching at the E-NNI for multi-stage multiplexed OTN     Ciena Corporation   Q9/15   2011-11-19
[ 1613 ]  
(Rev.1) 
Proposal to include 1+1 and 1:n bidirectional cases for the SNC/N protection subclass in Rec. G.873.1     Ciena Corporation   Q9/15   2011-11-19
[ 1612 ]  
(Rev.1) 
G.873.1 Addition of CL-SNCG/S Protection     Ciena Corporation   Q9/15   2011-11-19
[ 1611 ]  
(Rev.1) 
Proposed Corrections to Table 7-1 of G.873.1     Ciena Corporation   Q9/15   2011-11-19
[ 1610 ]  
(Rev.1) 
Management of G.872 v2 (aon)     Ciena Corporation   Q14/15, Q12/15   2011-11-19
[ 1609 ]  
(Rev.1) 
Clarification of OTN Maintenance Signalling in G.798.1     Ciena Corporation   Q9/15   2011-11-19
[ 1608 ]  
(Rev.1) 
Considerations for ODU5     Alcatel-Lucent USA Inc.   Q6/15, Q11/15   2011-11-19
[ 1607 ]  
(Rev.1) 
Study of maximum absolute time error accumulation in a chain of Boundary Clocks with time filtering and with Physical Layer frequency assist     Anue Systems   Q13/15   2011-11-18
[ 1606 ]  
(Rev.1) 
Simulation results regarding spectrum of time-stamping granularity error     Anue Systems   Q13/15   2011-11-18
[ 1605 ]  
(Rev.1) 
Reduction of impact of time-stamping granularity noise on time transfer error     Anue Systems   Q13/15   2011-11-18
[ 1604 ]  
(Rev.1) 
Sliding versus jumping windows     Anue Systems   Q13/15   2011-11-18
[ 1603 ]  
(Rev.1) 
Floor Packet Population PDV limit for two-way methods     Anue Systems   Q13/15   2011-11-18
[ 1602 ]  
(Rev.1) 
Test Case for 150us cluster and 200s window     Anue Systems   Q13/15   2011-11-18
[ 1601 ]  
(Rev.1) 
Observations on the framework of Floor Population Metrics for PDV Limits     Anue Systems   Q13/15   2011-11-18
[ 1600 ]  
(Rev.1) 
Developing a graphical understanding of floor population PDV metrics     Anue Systems   Q13/15   2011-11-18
[ 1599 ]  
(Rev.1) 
Names and formulae for floor population metrics     Anue Systems   Q13/15   2011-11-18
[ 1598 ]  
(Rev.1) 
Draft Recommendation G.smp.signalling     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2011-11-18
[ 1597 ]  
 
Observations regarding floor population percentage measurements     Anue Systems   Q13/15   2011-11-18
[ 1596 ]  
(Rev.1) 
PDV network limit in G.8261.1     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1595 ]  
(Rev.1-2) 
Intra-site Time Sync Requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1594 ]  
(Rev.1) 
Progress on G.8021.1     Ciena Corporation   Q9/15, Q12/15   2011-11-18
[ 1593 ]  
(Rev.1) 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-11-18
[ 1592 ]  
(Rev.1) 
E-OTN work overlap among Questions     Ciena Corporation   Q9/15, Q12/15, Q10/15   2011-11-18
[ 1591 ]  
(Rev.1-3) 
EEC with enhanced Holdover     Telefon AB - LM Ericsson   Q13/15   2011-11-18
[ 1590 ]  
(Rev.1) 
New Appendix B for G.8021.1     Ciena Corporation   Q9/15   2011-11-18
[ 1589 ]  
(Rev.1) 
Noise Generation in G.8263     Telefon AB - LM Ericsson   Q13/15   2011-11-18
Results:420 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25