Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1913 ]
(Rev.1) |
[G.vdsl] Proposal to develop a VDSL2bis recommendation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1911 ]
(Rev.1) |
G.8263 holdover requirement/squelch
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1910 ]
(Rev.1) |
G.VDSL2: Accuracy Requirements for KL0
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1909 ]
(Rev.1-2) |
PDV tolerance masks for HRM-1 and HRM-2
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1908 ]
|
Alignment of G.7044 and G.798
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1907 ]
(Rev.1) |
G.wnb: proposed updates to the G.wnb Recommendation
|
CopperGate Communications
|
Q4/15
|
2011-11-22 |
|
[ 1906 ]
(Rev.1) |
G.8113.1 - Going Forward
|
Israel
|
Q10/15
|
2011-11-22 |
|
[ 1905 ]
|
Withdrawn - Duplicate of C-1906
Withdrawn
|
Israel
|
Q10/15
|
2011-11-22 |
|
[ 1904 ]
|
Withdrawn - Duplicate of C-1906
Withdrawn
|
Israel
|
Q10/15
|
2011-11-22 |
|
[ 1903 ]
(Rev.1) +Add.1 |
Differences between APS and PSC for MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1902 ]
(Rev.1) |
Draft "multi-layer converged transport networks" and some discussion points
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q12/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1900 ]
|
Proposal for maintaining Optical Duo Binary as modulation format for 40G applications in G.698.2
|
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1899 ]
(Rev.1) |
[G.fast] BT requirements for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1898 ]
(Rev.1) |
G.fast: Mechanism for managing TDD and S-TDMA framing parameters
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1896 ]
(Rev.1) |
G.hn: Update proposal for G.hn management parameters
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1895 ]
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1894 ]
|
G.8271: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1893 ]
|
G.8263: Section 9 - PEC-S-F holdover
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1892 ]
|
G.8263: Section 6 - PEC-S-F slave clock noise generation
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1891 ]
|
G.8263: New Appendix discussing time constant values
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1890 ]
|
G.8261.1: Notes on network equipments producing excessive PDV
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1889 ]
|
G.8261.1: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1888 ]
|
G.8260: Request for clarification about the MAFE corner point
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1887 ]
|
G.8260: Comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1886 ]
|
Transport of CPRI interface over OTN
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1885 ]
|
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1884 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
Calnex Solutions Limited
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1883 ]
|
Y.1731 extension for Throughput Measurement
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1882 ]
|
Model for Ethernet Remote Customer Service Interfaces
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1881 ]
|
Transport Entity Role Examples
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1880 ]
|
The proposal about service frame delivery in G.8011.4 and G.8011.2
|
China Telecommunications Corporation
|
Q10/15
|
2011-11-22 |
|
[ 1879 ]
|
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset
|
China Telecommunications Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1878 ]
(Rev.1) |
Further Consideration of the Enhancement of LMM/LMR to support proactive LM
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1877 ]
(Rev.1) |
Another EOTN Equipment Type in G.798.1
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1876 ]
(Rev.1) |
Correction of ODUkP_TT and ODUkT_TT function in G.798
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1875 ]
|
G.fast: On the Synchronous TDMA framing structure
|
ADTRAN
|
Q4/15
|
2011-11-22 |
|
[ 1874 ]
(Rev.1) |
G.vector: Initialization for Simultaneous Joining Lines
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1873 ]
(Rev.1) |
G.fast: Proposal to create an annex for mobile backhaul application
|
Telefon AB - LM Ericsson
|
Q4/15
|
2011-11-22 |
|
[ 1872 ]
(Rev.1) |
G.fast: TDD Frame Structure and Timing Overhead
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1871 ]
|
Comments on draft revised G.872
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1870 ]
|
Hazard influence in telecommunications by VDSL2 technology
|
Brazil
|
Q4/15
|
2011-11-22 |
|
[ 1869 ]
(Rev.1) |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
|
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
|
Q6/15, Q2/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1868 ]
(Rev.1) |
G.fast: Point-to-Point Distribution is the Right Choice for G.fast
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1867 ]
(Rev.1) |
Ciena's views on Progressing work on Recs. G.8113.1 and G.8113.2
|
Ciena Corporation
|
Q12/15
|
2011-11-22 |
|
[ 1866 ]
(Rev.1) |
G.hnem: proposal of transmission parameters for extremely robust mode (ERM)
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1865 ]
(Rev.1) |
[G.fast] Clarification of BT requirement for SELT
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1864 ]
(Rev.1) |
G.fast: Equal-Length FEXT Measurements on PE05 Cable
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
Results:420 total items. Result page:
-
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):