International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:119 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  [ Questions: Q9/15 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 1518 ]  
 
2011-02-11 Telefónica Investigación y Desarrollo   Structuring of MPLS-TP Recommendations     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1507 ]  
 
2011-02-02 Huawei , Telefonica Investigacion y Desarrollo   Proposed text for protection path status update in G.smp     Q9/15  
[ 1506 ]  
 
2011-02-02 Huawei , Telefonica Investigacion y Desarrollo   Proposed text for gsmp     Q9/15  
[ 1505 ]  
(Rev.1) 
2011-02-02 Huawei , Telefonica Investigacion y Desarrollo   Proposed functional model for g.smp     Q9/15  
[ 1504 ]  
 
2011-02-02 Huawei , Telefonica Investigacion y Desarrollo   Proposal of ODU Shared Mesh Protection     Q9/15  
[ 1500 ]  
 
2011-02-02 Huawei   Proposal on ACL-SNCG/I for adaptive bandwidth in G.808.1     Q9/15  
[ 1499 ]  
 
2011-02-02 Huawei   Requirement summary for adaptive bandwidth in packet network     Q9/15, Q10/15  
[ 1498 ]  
 
2011-02-02 Huawei   Equipment models to support IEEE 1588     Q9/15  
[ 1492 ]  
 
2011-02-02 Ciena Corporation   G.8032 ( Encoding Ring Identifier in R-APS Message DA to Improve Network Scaling     Q9/15  
[ 1461 ]  
 
2011-02-02 NSN   Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1451 ]  
 
2011-02-02 France Telecom   Analysis of phase/time distribution over OTN networks     Q9/15, Q13/15, Q11/15  
[ 1447 ]  
 
2011-02-02 NTT   Proposal for additional delay measurement functions in MPLS-TP OAM     Q9/15, Q14/15, Q10/15  
[ 1445 ]  
 
2011-02-02 ISOC   Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1441 ]  
 
2011-02-02 BT   Withdrawn: MPLS-TP Standards     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1440 ]  
 
2011-02-02 Huawei   Second generation ETH MEP and MIP functions     Q9/15  
[ 1439 ]  
 
2011-02-02 NSN   Comments on differentiation of MPLS-TP environments     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1420 ]  
 
2011-02-01 Huawei   Functional model of HAO     Q9/15, Q11/15  
[ 1416 ]  
 
2011-02-01 ETRI   Modifications for draft G.798.1 (TD 379/P)     Q9/15  
[ 1415 ]  
 
2011-02-01 ETRI   Proposed modification on OTM-0.mvn in G.798     Q9/15  
[ 1401 ]  
 
2011-02-01 NTT   Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)     Q9/15, Q11/15  
[ 1392 ]  
 
2011-02-01 Deutsche Telekom   BBER objectives in Recommendation G.8201     Q9/15  
[ 1389 ]  
 
2011-02-01 Huawei   Proposal to extend the text in clause 5 of G.806     Q9/15  
[ 1384 ]  
 
2011-02-01 Telecom Italia   Structure and content of the MPLS-TP Recommendations     Q9/15, Q14/15, Q12/15, Q10/15  
[ 1382 ]  
 
2011-02-01 Ericsson   G.8032 Appendix XI     Q9/15  
[ 1378 ]  
 
2011-02-01 Alcatel-Lucent   ODUflex(GFP) Recommended Bit Rates     Q9/15, Q11/15  
Results:119 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-6-19