International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:418 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1493 ]  
 
G.hao impact on G.7713     Ciena Corporation   Q14/15, Q11/15   2011-02-02
[ 1492 ]  
 
G.8032 ( Encoding Ring Identifier in R-APS Message DA to Improve Network Scaling     Ciena Corporation   Q9/15   2011-02-02
[ 1491 ]  
 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-02-02
[ 1490 ]  
 
Considerations on ODUflex and ODUflex resizing     Ciena Corporation   Q11/15   2011-02-02
[ 1489 ]  
 
G.vector, G.vdsl, G.hn: Performance Study on Using Linear Precoding (Vectoring) for High Frequency DSL     LM Ericsson AB   Q4/15   2011-02-02
[ 1488 ]  
 
G.hnem: Proposal for CES format     Lantiq AEG   Q4/15   2011-02-02
[ 1487 ]  
 
G.hnem: Proposal for CES format     Lantiq AEG   Q4/15   2011-02-02
[ 1486 ]  
 
G.hnem: Proposal for update of the text for sections 7.4.5 -7.4.7, 7.5     Lantiq AEG   Q4/15   2011-02-02
[ 1485 ]  
 
G.hnem: Proposal for the number of symbols for PFH transmission     Lantiq AEG   Q4/15   2011-02-02
[ 1484 ]  
 
G.hn: Proposal for AKM procedure update for multicast     Lantiq   Q4/15   2011-02-02
[ 1483 ]  
 
G.hn: Proposal for using CTMG frame for all short management messages     Lantiq   Q4/15   2011-02-02
[ 1482 ]  
 
G.hn: Proposal for channel estimation protocol update     Lantiq   Q4/15   2011-02-02
[ 1481 ]  
 
G.hn: Miscellaneous G.9961 corrigendum issues     Lantiq   Q4/15   2011-02-02
[ 1480 ]  
 
G.hn: Miscellaneous G.9960 corrigendum issues     Lantiq   Q4/15   2011-02-02
[ 1479 ]  
 
G.hn: Miscellaneous G.9960 amendment issues     Lantiq   Q4/15   2011-02-02
[ 1478 ]  
 
G.hnem: Proposal for the text update for section 7.8 (PMI)     Lantiq AEG   Q4/15   2011-02-02
[ 1477 ]  
 
G.hnem: Proposal for updates in the text of section 7.7.3     Lantiq AEG   Q4/15   2011-02-02
[ 1476 ]  
 
G.hnem: Proposal for update of the text for section 7.4.1-7.4.4     Lantiq AEG   Q4/15   2011-02-02
[ 1475 ]  
 
Updates to §7.2.3.1 on PFH     Yitran Communications   Q4/15   2011-02-02
[ 1474 ]  
 
Interleaver Design     Yitran Communications   Q4/15   2011-02-02
[ 1473 ]  
 
G.hnem: Proposal for update of the text for section 7.3     Lantiq AEG   Q4/15   2011-02-02
[ 1472 ]  
 
Discussion on Channel Estimation Symbols     Yitran Communications   Q4/15   2011-02-02
[ 1471 ]  
 
G.vdsl, G.hn: BT's FTTdp Vision     BT   Q4/15   2011-02-02
[ 1470 ]  
 
Comments to G3     Yitran Communications   Q4/15   2011-02-02
[ 1469 ]  
 
G.hnem: Proposal for update of the text for sections 7.1, 7.2     Lantiq AEG   Q4/15   2011-02-02
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1467 ]  
(Rev.1) 
Allocation and assignment of experimental and non-standard code points     United States of America   Q10/15   2011-02-02
[ 1466 ]  
 
G.hnem: Proposal for the text update of Annex C     Lantiq AEG   Q4/15   2011-02-02
[ 1465 ]  
(Rev.1) 
USA on Consent of Draft Recommendation G.tpoam     United States of America   Q10/15   2011-02-02
[ 1464 ]  
 
G.hnem: Informative Appendix to describe use cases and installation examples     Lantiq AEG   Q4/15   2011-02-02
[ 1463 ]  
 
Wavelength conversion in reconfigurable multi-degree optical nodes     Deutsche Telekom   Q7/15   2011-02-02
[ 1462 ]  
 
Considerations on transverse compatibility for systems according to G.698.2     Deutsche Telekom   Q6/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1460 ]  
 
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution     CopperGate Communications   Q4/15   2011-02-02
[ 1459 ]  
 
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)     France Telecom , Tellabs   Q13/15   2011-02-02
[ 1458 ]  
 
Network PDV accumulation study with "end-to-end" data traffic model     France Telecom   Q13/15   2011-02-02
[ 1457 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Telecom   Q13/15   2011-02-02
[ 1456 ]  
 
G.8272: comments on PRTC limits proposal     France Telecom   Q13/15   2011-02-02
[ 1455 ]  
 
G.8263: testing methodology for the PDV tolerance of a packet slave clock     France Telecom   Q13/15   2011-02-02
[ 1454 ]  
 
G.8261.1: Hypothetical Reference Models proposal     France Telecom   Q13/15   2011-02-02
[ 1453 ]  
 
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1     France Telecom   Q13/15   2011-02-02
[ 1452 ]  
 
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks     France Telecom   Q13/15   2011-02-02
[ 1451 ]  
 
Analysis of phase/time distribution over OTN networks     France Telecom   Q9/15, Q13/15, Q11/15   2011-02-02
[ 1450 ]  
 
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization     France Telecom   Q13/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1447 ]  
 
Proposal for additional delay measurement functions in MPLS-TP OAM     NTT   Q9/15, Q14/15, Q10/15   2011-02-02
[ 1446 ]  
 
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP     NTT   Q3/15, Q13/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1444 ]  
 
G.hn: corrections to Tunnel termination for a corrigendum to G.9961     CopperGate Communications   Q4/15   2011-02-02
Results:418 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25