International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2010-05-31 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2010-05-31) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:352 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 924 ]  
 
Consideration on progressing ETH-SLM/SLR/1SL     Fujitsu   Q9/15, Q10/15   2010-05-18
[ 923 ]  
 
Proposal for a new Supplement regarding optical interface specifications for overclocked signals     Deutsche Telekom , NTT   Q6/15, Q11/15   2010-05-18
[ 922 ]  
 
Proposal to initiate a new recommendation "Configuration Management for IP home network" based on G.9971     NTT   Q4/15, Q1/15   2010-05-18
[ 921 ]  
 
Outline of a proposed new recommendation, Configuration Management for IP home network     NTT   Q4/15, Q1/15   2010-05-18
[ 920 ]  
 
Information of optical fibre identification technology in Japan for appendix of L.ofid     NTT   Q17/15   2010-05-18
[ 919 ]  
 
Proposal on draft text of Appendix II of L.pon     NTT   Q18/15   2010-05-18
[ 918 ]  
 
Proposal on draft text of modified Appendix I of G.657     NTT , CPLAJ   Q5/15, Q16/15   2010-05-18
[ 917 ]  
 
Information on failure characteristics under ultra-small bending     NTT   Q5/15, Q16/15   2010-05-18
[ 916 ]  
 
Additional information on uniformity measurement, and proposed draft text of Appendix II of G.650.1     NTT   Q5/15   2010-05-18
[ 915 ]  
 
Comments on the proposed revisions for G.650.1     NTT , CLPAJ   Q5/15   2010-05-18
[ 914 ]  
 
A shared mesh protection switching mechanism     ETRI   Q9/15   2010-05-18
[ 913 ]  
 
A proposal of a shared mesh protection architecture in G.gsmp     ETRI   Q9/15   2010-05-18
[ 912 ]  
 
Comments on the G.808.1     ETRI   Q9/15   2010-05-18
[ 911 ]  
 
Addition of examples of APS protocol operation on multiple failures in the next version of G.808.1     ETRI   Q9/15   2010-05-18
[ 910 ]  
 
Support for G.sdapp     KT , ETRI   Q6/15   2010-05-18
[ 909 ]  
(Rev.1) 
Seed signal power in seeded DWDM applications     ETRI   Q6/15   2010-05-18
[ 908 ]  
 
Proposed Frequency Grid Specification for G.sdapp     LG-Nortel   Q6/15   2010-05-18
[ 907 ]  
 
Proposed Seed Source Power Spectral Density Specification for G.sdapp     LG-Nortel   Q6/15   2010-05-18
[ 906 ]  
 
Proposed Baseline Text for G.sdapp     LG-Nortel   Q6/15   2010-05-18
[ 905 ]  
 
Telecom Slave - State Machine Operations     Huawei   Q13/15   2010-05-18
[ 904 ]  
 
G.827x Recommendations - High-Level Objectives     Huawei , CATR , MII   Q13/15   2010-05-18
[ 903 ]  
 
Pulse-Per-Second Interface     Huawei , CATR , China Mobile Communications Corporation , MII   Q13/15   2010-05-18
[ 902 ]  
 
PTP Profile Data Set Members     Huawei   Q13/15   2010-05-18
[ 901 ]  
 
G.8264 ESMC Processing for G.8011.x Ethernet Services Types     Huawei   Q13/15, Q10/15   2010-05-18
[ 900 ]  
 
Comments and Editorial Remarks for G.8265.1     Huawei   Q13/15, Q10/15   2010-05-18
[ 899 ]  
 
Updated Telecom Slave Model     Huawei , France Télécom   Q13/15   2010-05-18
[ 898 ]  
 
Flag Fields     Huawei   Q13/15   2010-05-18
[ 897 ]  
 
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks     Huawei , China Mobile Communications Corporation   Q13/15   2010-05-18
[ 896 ]  
 
The use of SyncE and IEEE1588v2 for Time Distribution     Huawei , China Mobile Communications Corporation   Q13/15   2010-05-18
[ 895 ]  
 
ESMC Transport over GPON     Huawei , BT   Q2/15, Q13/15   2010-05-18
[ 894 ]  
 
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context     Huawei , France Télécom   Q13/15   2010-05-18
[ 893 ]  
 
Usage of PTP domain number for the time-profile     Huawei   Q13/15   2010-05-18
[ 892 ]  
 
Proposed text modifications to the delay measurement process in G.8021     NEC Corporation   Q9/15   2010-05-18
[ 891 ]  
 
Proposed text for ETH group functions in G.8021     NEC Corporation   Q9/15   2010-05-18
[ 890 ]  
 
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 889 ]  
 
Consideration of the enhancement of performance monitoring in G.8021/Y.1731     NEC Corporation   Q9/15, Q14/15, Q10/15   2010-05-18
[ 888 ]  
 
Proposal for OMCI transport in Ethernet PON     Mitsubishi , Ericsson , HItachi , NTT   Q2/15   2010-05-18
[ 887 ]  
 
Black-hole problem due to address mis-learning in G.8032     Korea (Republic of)   Q9/15   2010-05-18
[ 886 ]  
 
Proposal to modify failure of protocol conditions in G.8031 and G.873.1     Korea (Republic of)   Q9/15   2010-05-18
[ 885 ]  
 
MS-W (Manual Switch to Working) in revertive operation in G.8031     Korea (Republic of)   Q9/15   2010-05-18
[ 884 ]  
 
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems     NTT   Q6/15   2010-05-18
[ 883 ]  
 
Applications of G.9960, G.9961 Transceivers for Smart Grid applications: Advanced Metering infrastructure, Energy Management in the home, and Electric Vehicles     Lantiq Beteiligungs , DS2   Q4/15   2010-05-18
[ 882 ]  
 
Consideration of jitter performance measurement method for XG-PON optical interfaces     CIAJ   Q2/15, Q15/15   2010-05-18
[ 881 ]  
 
Proposal for definition of COTDR     CIAJ   Q8/15, Q15/15   2010-05-18
[ 880 ]  
 
Proposal for correction of table1 parameters in O.174     CIAJ   Q15/15   2010-05-18
[ 879 ]  
 
Proposal for addition of jitter test parameters and text in O.174     CIAJ   Q15/15   2010-05-18
[ 878 ]  
 
Proposal for Title, Summary and Scope of O.xgponjitter     CIAJ   Q2/15, Q15/15   2010-05-18
[ 877 ]  
 
Comments on the protocol specifications in Y.1731     NEC Corporation   Q10/15   2010-05-18
[ 876 ]  
 
Issues with the Transparent Clock concept of PTPv2 in a telecom environment     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 875 ]  
 
Architecture for phase and time distribution     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
Results:352 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19