Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 472 ]
|
Requirement of Embedded Latency Measurement in OTN Networks
|
China Telecom
,
CATR
,
China Unicom
,
CMCC
|
Q11/15
|
2009-09-16 |
|
[ 471 ]
|
CPRI over OTN requirement
|
China Telecom
,
Huawei
|
Q11/15
|
2009-09-16 |
|
[ 470 ]
|
Time Sync Master definition in G.8266
|
Ericsson
|
Q13/15
|
2009-09-16 |
|
[ 469 ]
|
G.vector: Proposed Working Text for the crosstalk channel model optimized for Japanese environment in G.vector Appendix
|
NTT
,
NEC
,
OKI
,
SEI
|
Q4/15
|
2009-09-16 |
|
[ 468 ]
|
IPR: IPR Declaration of Ericsson AB with respect to G.996.2
|
Ericsson AB
|
Q4/15
|
2009-09-16 |
|
[ 467 ]
|
Proposal to introduce multi-granularity in photonic cross-connect switching in AON/WSON
|
NTT
|
Q12/15
|
2009-09-16 |
|
[ 466 ]
|
Proposal to promote discussions on optical components for advanced modulation/demodulation schemes used for high-speed large-capacity WDM transmission
|
NTT
|
Q7/15
|
2009-09-16 |
|
[ 465 ]
|
Comments on Draft revised G.709 (TD95/Plen)
|
Fujitsu
|
Q11/15
|
2009-09-16 |
|
[ 464 ]
|
Proposed further clarification on Draft revised G.709 (TD95/Plen)
|
Fujitsu
|
Q11/15
|
2009-09-16 |
|
[ 463 ]
|
Proposed removal of Appendix I from Y.1731
|
Fujitsu
|
Q10/15
|
2009-09-16 |
|
[ 462 ]
|
Consideration on progressing G.873.1
|
Fujitsu
|
Q9/15, Q3/15
|
2009-09-16 |
|
[ 461 ]
|
Comments on draft revised G.798 (TD98/Plen)
|
Fujitsu
|
Q9/15
|
2009-09-16 |
|
[ 460 ]
|
Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client
|
Fujitsu
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2009-09-16 |
|
[ 459 ]
|
Proposed restructuring of G.806
|
Fujitsu
|
Q9/15
|
2009-09-16 |
|
[ 458 ]
|
Proposed agreement on ETH-LT progress
|
Fujitsu
|
Q9/15, Q10/15
|
2009-09-16 |
|
[ 457 ]
|
Directory listing capability, file transfer controller in G.984.4 am 2
|
Ericsson
|
Q2/15
|
2009-09-16 |
|
[ 456 ]
|
Document withdrawn
|
Ericsson
|
Q2/15
|
2009-09-16 |
|
[ 455 ]
|
Additional VoIP attributes in G.984.4 am 2
|
Ericsson
|
Q2/15
|
2009-09-16 |
|
[ 454 ]
|
Proposal to study Shared Mesh Protection
|
Huawei Technologies
,
CATR
,
MII
|
Q9/15
|
2009-09-16 |
|
[ 453 ]
|
Considerations on the description of the ODU layer network in G.872 and G.8080
|
Huawei Technologies
|
Q14/15, Q12/15
|
2009-09-16 |
|
[ 452 ]
|
Transfer delay for FC over OTN
|
Huawei Technologies
|
Q11/15
|
2009-09-16 |
|
[ 451 ]
|
Summary of correspondence activity on new supplement G.Sup.gafc
|
NTT
|
Q5/15
|
2009-09-16 |
|
[ 450 ]
|
Proposal on modification of Appendix I of Rec. G.971
|
NTT
|
Q8/15
|
2009-09-16 |
|
[ 449 ]
|
Proposed draft text for new appendix of Rec. G.976
|
NTT
|
Q8/15
|
2009-09-16 |
|
[ 448 ]
|
Proposal on modification of Appendix II of Rec. G.650.1
|
NTT
|
Q5/15
|
2009-09-16 |
|
[ 447 ]
|
Proposed texts for clause 11.2.1 of G.8031
|
Mitsubishi Electric Corporation
|
Q9/15
|
2009-09-16 |
|
[ 446 ]
|
Document withdrawn
|
N/A
|
|
2009-09-16 |
|
[ 445 ]
|
Management of high capacity connections in the OTN
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 444 ]
|
Document withdrawn
|
N/A
|
Q14/15
|
2009-09-16 |
|
[ 443 ]
|
Text proposal to align clause 9/G.872 with draft revised G.709
|
Huawei Technologies
|
Q12/15
|
2009-09-16 |
|
[ 442 ]
|
Document withdrawn
|
N/A
|
|
2009-09-16 |
|
[ 441 ]
|
GPON over OTN mapping
|
Huawei Technologies
,
China Mobile Communications Corporation
,
PMC-Sierra
|
Q2/15, Q11/15
|
2009-09-16 |
|
[ 440 ]
|
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 439 ]
|
Text proposal for clause 8/G.798.1
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 438 ]
|
Proposal to specify OCh/OTUkV_A with OTUk_CP
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 437 ]
|
Multi-vendor demarcation in the OTN
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 436 ]
|
LO and HO ODU view points and NNIs
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 435 ]
|
Document withdrawn
See C533
|
N/A
|
|
2009-09-16 |
|
[ 434 ]
|
First models of OTN equipment proposal
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 433 ]
|
Multi-lane STM-256
|
AT&T
|
Q11/15
|
2009-09-16 |
|
[ 432 ]
|
Optical Monitoring
|
AT&T
|
Q7/15, Q6/15
|
2009-09-16 |
|
[ 431 ]
|
G.709 "Black Link" OTM-1r.m Interface as IrDI
|
AT&T
|
Q6/15, Q12/15, Q11/15
|
2009-09-16 |
|
[ 430 ]
|
G.709 OTN domains
|
AT&T
|
Q11/15
|
2009-09-16 |
|
[ 429 ]
|
G.8032 (Comments on Draft)
|
Nortel Networks (Canada)
|
Q9/15
|
2009-09-16 |
|
[ 428 ]
|
Additional requirements for G.7718
|
Alcatel-Lucent
,
NTT
|
Q14/15
|
2009-09-16 |
|
[ 427 ]
|
G.8032 (Access Protection)
|
Nortel Networks (Canada)
|
Q9/15
|
2009-09-16 |
|
[ 426 ]
|
Eye Mask for 10G G.695
|
Nortel Networks (Canada)
|
Q6/15
|
2009-09-16 |
|
[ 425 ]
|
Support for the approval of G.9960 and consent of G.hn Recommendations
|
Portugal Telecom
|
Q4/15
|
2009-09-15 |
|
[ 424 ]
|
Proposal of fibre macrobending identification method
|
SoftBank Telecom
|
Q5/15
|
2009-09-15 |
|
[ 423 ]
|
Considerations of Y.1731 Performance Monitoring
|
NEC Corporation
|
Q10/15
|
2009-09-15 |
Results:399 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):