International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Results:236 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  [ Questions: Q19/13 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 322 ]  
 
2009-08-25 ZTE Corporation   Proposal for adding the scenario of multi-overlay to Y.dsnscen     Q19/13  
[ 321 ]  
 
2009-08-25 ZTE Corporation   Proposal for adding the requirement of topology information service to Y.dsnreq     Q19/13  
[ 281 ]  
 
2009-08-24 China Telecom   Proposed modification to the clause 7 in Y.dsnscen     Q19/13  
[ 280 ]  
 
2009-08-24 China Telecom   Proposed modification to the clause 3 in Y.dsnscen     Q19/13  
[ 279 ]  
 
2009-08-24 China Telecom   Proposed some editorial modification to Y.dsnscen     Q19/13  
[ 276 ]  
 
2009-08-24 China Telecom   Proposal for Transfer Optimization Function (TOF) in NGN framework     Q5/13, Q19/13  
[ 259 ]  
 
2009-08-24 ETRI   Proposed modification of draft supplement Y.dsnscen "Supplement on DSN scenarios"     Q19/13  
[ 258 ]  
 
2009-08-24 ETRI   Proposal of additional requirements for Y.dsnreq     Q19/13  
[ 257 ]  
 
2009-08-24 ETRI   Proposed modification of Y.dsnreq     Q19/13  
[ 256 ]  
 
2009-08-24 LM Ericsson   Modifications to access network requirements     Q19/13  
[ 255 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clause 6.1.11     Q19/13  
[ 254 ]  
 
2009-08-24 LM Ericsson   Requirement on user autheitication and authorization in Y.dsnreq     Q19/13  
[ 253 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clause 6.2.12     Q19/13  
[ 252 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clauses 6.2.6 & 6.2.7     Q19/13  
[ 251 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clauses 6.2.1 & 6.2.2     Q19/13  
[ 250 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clause 6.1.9     Q19/13  
[ 249 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clauses 6.1.3 thru 6.1.6     Q19/13  
[ 248 ]  
 
2009-08-24 LM Ericsson   Modifications to Y.dsnreq clause 6 and 6.1.1     Q19/13  
[ 247 ]  
 
2009-08-24 LM Ericsson   Purpose of Y.dsnreq     Q19/13  
[ 244 ]  
 
2009-08-24 Korea (Republic of)   Proposed framework for Y.dsnarch "Architecture of DSN"     Q19/13  
[ 239 ]  
 
2009-08-24 Softbank BB Corp.   Proposed modifications for clause 6.1 of Y.dsnscen     Q19/13  
[ 225 ]  
 
2009-08-21 CATR,MII P.R. China   Proposed text of the sub-clause 6.1.5 "Mobility" in Y.Dsnreq     Q19/13  
[ 224 ]  
 
2009-08-21 CATR,MIIT, People's Republic of China   Proposed modifications of security requirement and sub-clause 6.2.5 in Y.dsnreq     Q19/13  
[ 223 ]  
 
2009-08-21 CATR,MII P.R. China   Proposed modification of the sub-clause 7.2 of Y.dsnarh     Q19/13  
[ 200 ]  
 
2009-08-21 Alcatel-Lucent Shanghai Bell, Co, Ltd   Proposed clarifications on the terms of DSN nodes in Y.dsn-scen     Q19/13  
Results:236 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-9-19