International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 101 ]  
 
2009-01-06 ETRI   New work item for Distributed Services Networking     Q19/13  
[ 100 ]  
 
2009-01-06 NEC Corporation   Proposal of new document structure for draft Recommendation Y.NGN-R2-Reqts "Requirements and capabilities for ITU-T NGN release 2"     Q3/13  
[ 99 ]  
 
2009-01-06 NEC Corporation   Proposal of editorial corrections for Y.2720     Q16/13  
[ 98 ]  
 
2009-01-06 Korea Telecom   Initial Input for Discussion on Infrastructure Virtualization for Future Network(FN)     Q21/13  
[ 97 ]  
 
2009-01-06 KT   Proposal for discussion on resource data management in Future Network     Q21/13  
[ 96 ]  
 
2009-01-06 Korea (Republic of)   Updated text of draft Recommendation Y.NGN-Cap2     Q1/13  
[ 95 ]  
 
2009-01-06 Korea(Republic of)   Proposal for update texts to design principle of Y.FAid-loc-split     Q5/13  
[ 94 ]  
 
2009-01-06 Korea (Republic of)   Heterogeneous device adaptation service scenario over NGN     Q14/13  
[ 93 ]  
 
2009-01-06 Korea (Republic of)   IT Service Risk analysis service scenario over NGN     Q8/13  
[ 92 ]  
 
2009-01-06 Korea (Republic of)   Revised text for draft recommendation Q.MM-VPN     Q8/13  
[ 91 ]  
 
2009-01-06 ETRI, Korea (Republic of)   Interface between the Local TLM-FEs in Y.NACF Rev.1     Q5/13  
[ 90 ]  
 
2009-01-06 Korea (Republic of)   IP Mobility Selection Principle in Y.MMCF     Q5/13  
[ 89 ]  
 
2009-01-06 Korea (Republic of)   Mobility QoS issue in NGN     Q5/13  
[ 88 ]  
 
2009-01-06 Korea (Republic of)   Clarification of sub-functions of HCF in Y.MMCF     Q5/13  
[ 87 ]  
 
2009-01-06 Korea(Republic of)   Proposed to add the text for Time-Shifted TV to Y.2111     Q4/13  
[ 86 ]  
 
2009-01-06 Korea (Rep. of)   The updated texts on Y.ngn-mcastfa (Functional Architecture of NGN Multicast)     Q5/13  
[ 85 ]  
 
2009-01-07 Korea (Rep. of)   Proposal of New Work Item on Mobility Management for Interworking between WLAN and WiMAX (Q.MM-WAW)     Q8/13  
[ 84 ]  
 
2009-01-06 Korea (Rep. of)   Proposal for multicast functions in transport stratum.     Q5/13  
[ 83 ]  
 
2009-01-06 Korea(Republic of)   Recommendation Y.2113 (Y.enet) -AAP Last Call comments resolution: Edited text     Q4/13  
[ 82 ]  
 
2009-01-06 Korea (Rep. Of)   Initiation on Identification Framework for IPTV services     Q3/13  
[ 81 ]  
 
2009-01-06 Korea (Republic of)   User-created scenarios for NGN Services     Q14/13  
[ 80 ]  
 
2009-01-06 Korea (Republic of)   Revised draft Recommendation Y.NGN-UbiNet (Overview and principles for ubiquitous networking in NGN)     Q5/13  
[ 79 ]  
 
2009-01-06 Korea (Republic of)   Revised draft Recommendation Y.ipv6-object (Framework of object mapping using IPv6 in NGN)     Q7/13  
[ 78 ]  
 
2009-01-06 Korea (Rep. Of)   Proposal for a new draft recommendation Y.IPTV-IDF "IPTV service information delivery framework"     Q5/13  
[ 77 ]  
 
2009-01-06 Korea (Rep. Of)   A necessity of service information delivery framework for IPTV     Q5/13  
[ 76 ]  
 
2009-01-06 Korea (Republic of)   Evolution and Service consideration for Ubiquitous Services     Q14/13  
[ 75 ]  
 
2009-01-06 Korea (Rep. of)   Revised text on the chapter.7 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Q14/13  
[ 74 ]  
 
2009-01-06 Korea (Rep. of)   Proposed new text on the chapter.6 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Q14/13  
[ 73 ]  
 
2009-01-06 ETRI   Proposal for new draft Recommendation on architectural realizations for content delivery and storage in NGN     Q5/13  
[ 72 ]  
 
2009-01-06 ZTE; China Telecom   A proposal to add new clause 8 titled by "Functional Requirements" for Y.NGN-MCC     Q3/13  
[ 71 ]  
 
2009-01-06 ETRI   Proposal for obtaining location information of TLM-FE in Y.NACF Rev.1     Q5/13  
[ 70 ]  
 
2009-01-06 ETRI   Proposal for adding new information 'mobility protocol type' to TLM-FE in Y.NACF Rev.1     Q5/13  
[ 69 ]  
 
2009-01-06 ETRI   Proposal for minor changes in Y.NACF Rev.1     Q5/13  
[ 68 ]  
 
2009-01-06 ETRI   Clarification of Home TLM-FE in Y.NACF Rev.1     Q5/13  
[ 67 ]  
 
2009-01-06 ETRI   Proposal for new draft recommendation of OSE Functional Architecture for NGN     Q5/13  
[ 66 ]  
 
2009-01-06 KT   Initial Input for Discussion on Economic Incentives for Future Network (FN)     Q21/13  
[ 65 ]  
 
2009-01-06 Korea Telecom , ETRI , Samsung   Initial Input for Discussion on Mobility Aspect of Future Network (FN)     Q21/13  
[ 64 ]  
 
2009-01-06 Ministry of Communications & IT, INDIA   Draft Y.phy_arch_ngn - New work item on architectural realizations and open interfaces in NGN     Q5/13  
[ 63 ]  
 
2009-01-06 ETRI   Discussion on relationship between OSE and USN middleware     Q3/13  
[ 62 ]  
 
2009-01-06 Korea Telecom   Proxy Mobile IP based IP mobility scenario for interworking between WiMAX and UMTS     Q8/13  
[ 61 ]  
 
2009-01-06 China Telecom   Revision to Q19/13 to include a new study item on Service Traffic Control and Optimization     Q19/13  
[ 60 ]  
 
2009-01-06 China Telecom , ZTE   Proposed modification to the figure in clause 6 of Y.NGN-MCC     Q3/13  
[ 59 ]  
 
2009-01-06 China Telecom , ZTE   Proposed modification to clause 7 as "Service Requirements" of Y.NGN-MCC     Q3/13  
[ 58 ]  
 
2009-01-06 China Telecom , ZTE   Proposed modification to clause 5 of Y.NGN-MCC     Q3/13  
[ 57 ]  
 
2009-01-06 China Telecom , ZTE   Proposed revision for Y.NGN-R2-Reqts. to support Multimedia Communication Centre (MCC) service     Q3/13  
[ 56 ]  
 
2009-01-06 China Telecom   A proposal to add CAVE AKA authentication method in section 9.3 of draft Y.FMC-IMS     Q11/13  
[ 55 ]  
 
2009-01-06 CATR   Proposal for some clarification and modification to Y.USN-reqts     Q3/13  
[ 54 ]  
 
2009-01-06 CATR   Proposal for adding P2P mechanism between servers into section 7.2.3 of Y.iptv-netcontrol-fw     Q3/13  
[ 53 ]  
 
2009-01-06 MII, China   Functional requirements and architecture of the Deep Packet Inspection release 1     Q17/13  
[ 52 ]  
 
2009-01-06 CATR, MII, P.R. China   Proposal of supplementary description of Control and Management function in network layer     Q20/13  
Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-29