International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 101 ]  
 
New work item for Distributed Services Networking     ETRI   Q19/13   2009-01-06
[ 100 ]  
 
Proposal of new document structure for draft Recommendation Y.NGN-R2-Reqts "Requirements and capabilities for ITU-T NGN release 2"     NEC Corporation   Q3/13   2009-01-06
[ 99 ]  
 
Proposal of editorial corrections for Y.2720     NEC Corporation   Q16/13   2009-01-06
[ 98 ]  
 
Initial Input for Discussion on Infrastructure Virtualization for Future Network(FN)     Korea Telecom   Q21/13   2009-01-06
[ 97 ]  
 
Proposal for discussion on resource data management in Future Network     KT   Q21/13   2009-01-06
[ 96 ]  
 
Updated text of draft Recommendation Y.NGN-Cap2     Korea (Republic of)   Q1/13   2009-01-06
[ 95 ]  
 
Proposal for update texts to design principle of Y.FAid-loc-split     Korea(Republic of)   Q5/13   2009-01-06
[ 94 ]  
 
Heterogeneous device adaptation service scenario over NGN     Korea (Republic of)   Q14/13   2009-01-06
[ 93 ]  
 
IT Service Risk analysis service scenario over NGN     Korea (Republic of)   Q8/13   2009-01-06
[ 92 ]  
 
Revised text for draft recommendation Q.MM-VPN     Korea (Republic of)   Q8/13   2009-01-06
[ 91 ]  
 
Interface between the Local TLM-FEs in Y.NACF Rev.1     ETRI, Korea (Republic of)   Q5/13   2009-01-06
[ 90 ]  
 
IP Mobility Selection Principle in Y.MMCF     Korea (Republic of)   Q5/13   2009-01-06
[ 89 ]  
 
Mobility QoS issue in NGN     Korea (Republic of)   Q5/13   2009-01-06
[ 88 ]  
 
Clarification of sub-functions of HCF in Y.MMCF     Korea (Republic of)   Q5/13   2009-01-06
[ 87 ]  
 
Proposed to add the text for Time-Shifted TV to Y.2111     Korea(Republic of)   Q4/13   2009-01-06
[ 86 ]  
 
The updated texts on Y.ngn-mcastfa (Functional Architecture of NGN Multicast)     Korea (Rep. of)   Q5/13   2009-01-06
[ 85 ]  
 
Proposal of New Work Item on Mobility Management for Interworking between WLAN and WiMAX (Q.MM-WAW)     Korea (Rep. of)   Q8/13   2009-01-07
[ 84 ]  
 
Proposal for multicast functions in transport stratum.     Korea (Rep. of)   Q5/13   2009-01-06
[ 83 ]  
 
Recommendation Y.2113 (Y.enet) -AAP Last Call comments resolution: Edited text     Korea(Republic of)   Q4/13   2009-01-06
[ 82 ]  
 
Initiation on Identification Framework for IPTV services     Korea (Rep. Of)   Q3/13   2009-01-06
[ 81 ]  
 
User-created scenarios for NGN Services     Korea (Republic of)   Q14/13   2009-01-06
[ 80 ]  
 
Revised draft Recommendation Y.NGN-UbiNet (Overview and principles for ubiquitous networking in NGN)     Korea (Republic of)   Q5/13   2009-01-06
[ 79 ]  
 
Revised draft Recommendation Y.ipv6-object (Framework of object mapping using IPv6 in NGN)     Korea (Republic of)   Q7/13   2009-01-06
[ 78 ]  
 
Proposal for a new draft recommendation Y.IPTV-IDF "IPTV service information delivery framework"     Korea (Rep. Of)   Q5/13   2009-01-06
[ 77 ]  
 
A necessity of service information delivery framework for IPTV     Korea (Rep. Of)   Q5/13   2009-01-06
[ 76 ]  
 
Evolution and Service consideration for Ubiquitous Services     Korea (Republic of)   Q14/13   2009-01-06
[ 75 ]  
 
Revised text on the chapter.7 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Korea (Rep. of)   Q14/13   2009-01-06
[ 74 ]  
 
Proposed new text on the chapter.6 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Korea (Rep. of)   Q14/13   2009-01-06
[ 73 ]  
 
Proposal for new draft Recommendation on architectural realizations for content delivery and storage in NGN     ETRI   Q5/13   2009-01-06
[ 72 ]  
 
A proposal to add new clause 8 titled by "Functional Requirements" for Y.NGN-MCC     ZTE; China Telecom   Q3/13   2009-01-06
[ 71 ]  
 
Proposal for obtaining location information of TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 70 ]  
 
Proposal for adding new information 'mobility protocol type' to TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 69 ]  
 
Proposal for minor changes in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 68 ]  
 
Clarification of Home TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 67 ]  
 
Proposal for new draft recommendation of OSE Functional Architecture for NGN     ETRI   Q5/13   2009-01-06
[ 66 ]  
 
Initial Input for Discussion on Economic Incentives for Future Network (FN)     KT   Q21/13   2009-01-06
[ 65 ]  
 
Initial Input for Discussion on Mobility Aspect of Future Network (FN)     Korea Telecom , ETRI , Samsung   Q21/13   2009-01-06
[ 64 ]  
 
Draft Y.phy_arch_ngn - New work item on architectural realizations and open interfaces in NGN     Ministry of Communications & IT, INDIA   Q5/13   2009-01-06
[ 63 ]  
 
Discussion on relationship between OSE and USN middleware     ETRI   Q3/13   2009-01-06
[ 62 ]  
 
Proxy Mobile IP based IP mobility scenario for interworking between WiMAX and UMTS     Korea Telecom   Q8/13   2009-01-06
[ 61 ]  
 
Revision to Q19/13 to include a new study item on Service Traffic Control and Optimization     China Telecom   Q19/13   2009-01-06
[ 60 ]  
 
Proposed modification to the figure in clause 6 of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 59 ]  
 
Proposed modification to clause 7 as "Service Requirements" of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 58 ]  
 
Proposed modification to clause 5 of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 57 ]  
 
Proposed revision for Y.NGN-R2-Reqts. to support Multimedia Communication Centre (MCC) service     China Telecom , ZTE   Q3/13   2009-01-06
[ 56 ]  
 
A proposal to add CAVE AKA authentication method in section 9.3 of draft Y.FMC-IMS     China Telecom   Q11/13   2009-01-06
[ 55 ]  
 
Proposal for some clarification and modification to Y.USN-reqts     CATR   Q3/13   2009-01-06
[ 54 ]  
 
Proposal for adding P2P mechanism between servers into section 7.2.3 of Y.iptv-netcontrol-fw     CATR   Q3/13   2009-01-06
[ 53 ]  
 
Functional requirements and architecture of the Deep Packet Inspection release 1     MII, China   Q17/13   2009-01-06
[ 52 ]  
 
Proposal of supplementary description of Control and Management function in network layer     CATR, MII, P.R. China   Q20/13   2009-01-06
Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25