International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:176 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 151 ]  
 
2009-01-07 China Telecom, ZTE Corporation   Proposed to add an information component in Rh reference point     Q4/13  
[ 150 ]  
 
2009-01-07 ZTE Corporation   Proposal to do add new definition, References and Abbreviations and acronyms of Y.FAid-loc-split     Q5/13  
[ 149 ]  
 
2009-01-07 ZTE Corporation   Proposal for the information flow of the Y.FAid-loc-split     Q5/13  
[ 148 ]  
 
2009-01-07 ZTE Corporation   Proposal for the id-loc-split-based multihoming of the Y.FAid-loc-split     Q5/13  
[ 147 ]  
 
2009-01-07 ZTE Corporation   Proposal for the id-loc-split-based mobility of the Y.FAid-loc-split     Q5/13  
[ 146 ]  
 
2009-01-07 ZTE Corporation   Proposal for the architecture model of Y.FAid-loc-split     Q5/13  
[ 145 ]  
 
2009-01-07 ZTE Corporation   Proposal for add the contents of the appendix to the body of Y.FAid-loc-split     Q5/13  
[ 144 ]  
 
2009-01-07 AT&T and Telcordia   Proposed Initial Text for ITU-T Supplement "Evaluation of Existing Signaling Protocol Extensions to Support Y.2171 Admission Control Priority Levels"     Q4/13  
[ 143 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed changes to sub-clause 9.3.2 of Y.iptv-control-fw     Q3/13  
[ 142 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposal to initiate a work item to study DSN requirements     Q19/13  
[ 141 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposed replacement for sub-clauses 7.2.1 and 7.2.2 of draft Y.PTDN     Q20/13  
[ 140 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposed text of draft recommendation for iSCP scenarios     Q20/13  
[ 139 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposed baseline text of draft recommendation for iSCP requirements     Q20/13  
[ 138 ]  
 
2009-01-07 China Mobile, Huawei Technologies Co. Ltd   Proposal for additional text on routing optimization consideration for handover     Q5/13  
[ 137 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposal for adding VPN identifier and VPN numbering fields in the header of the network layer user packet     Q20/13  
[ 136 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposal to extend fields of the network layer data packet header.     Q20/13  
[ 135 ]  
 
2009-01-07 Huawei Technologies Co., Ltd   Proposal for adding multicast identifier field in the header of the network layer data packet     Q20/13  
[ 134 ]  
 
2009-01-07 Korea (Republic of)   The authentication architecture and requirements to provide mobility in NGN     Q16/13  
[ 133 ]  
 
2009-01-07 China Mobile, Huawei Technologies Co., Ltd.   Some modifications to the scenarios and flows of Y.MMCF     Q5/13  
[ 132 ]  
 
2009-01-07 Huawei Technologies CO., LTD.   Proposed text for Draft Recommendation on IPv6 Evolvement in NGN     Q7/13  
[ 131 ]  
 
2009-01-07 Huawei Technologies Co., LTD.   Proposed Draft Recommendation on prefix and address management for network access in IPv6-based NGN     Q7/13  
[ 130 ]  
 
2009-01-07 Huawei Technologies Co., LTD.   Proposal to initiate a work item for IPv6 evolvement in NGN     Q7/13  
[ 129 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed text for sub-clauses 8.4.1 and 8.4.2 of draft Recommendation Y.ngnIdMreq     Q16/13  
[ 128 ]  
 
2009-01-07 Huawei Technologies Co.,Ltd.   Proposed text for Authentication and Pseudonym Management clauses of draft Y.idmMechanisms     Q16/13  
[ 127 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed draft text for DSN requirements     Q19/13  
[ 126 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed changes to sub-clause 9.4.2 of Y.iptv-control-fw     Q3/13  
[ 125 ]  
 
2009-01-07 China Mobile, Huawei Technologies Co., Ltd.   Clarifications of the role of the Proxy Mobility Location Management Function (P-MLMF) in Y.MMCF     Q5/13  
[ 124 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   More Information on IPTV Overlay Network     Q3/13  
[ 123 ]  
 
2009-01-07 China Mobile, Huawei Technologies Co., Ltd.   Location of mobility service profile in Y.MMCF     Q5/13  
[ 122 ]  
 
2009-01-07 CATR, Huawei Technologies Co., Ltd.   Layer 2 handover in Y.MMCF     Q5/13  
[ 121 ]  
 
2009-01-07 Huawei Technologies Co.,Ltd   Proposed comments to draft Y.CMR     Q14/13  
[ 120 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed content for sub-clause 7.2 of draft Y.ipv6-object     Q7/13  
[ 119 ]  
 
2009-01-07 CATR, Huawei Technologies Co., Ltd.   Integrated versus split mode in Y.MMCF     Q5/13  
[ 118 ]  
 
2009-01-07 China Mobile, CATR, Huawei Technologies Co., Ltd.   Clarification of the role of the HDF in Y.MMCF     Q5/13  
[ 117 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed text of unicast and multicast resource reuse     Q4/13  
[ 116 ]  
 
2009-01-07 Huawei Technologies Co., Ltd.   Proposed text of resource control for QoS downgrading     Q4/13  
[ 115 ]  
 
2009-01-06 Huawei, China Mobile   Proposal of New Work Item on the Scenario of Multi-connection Architecture (Q.SCEN-MCA)     Q9/13  
[ 114 ]  
 
2009-01-06 Huawei Technologies Co., Ltd.   Proposed work item for scenarios of DSN     Q19/13  
[ 113 ]  
 
2009-01-06 China Mobile   Proposed work item for Requirements and capabilities of ITU-T DSN     Q19/13  
[ 112 ]  
 
2009-01-06 China Mobile   Proposed work item for requirement of multi-connection     Q9/13  
[ 111 ]  
 
2009-01-06 China Mobile   Proposed work item for architecture of multi-connection     Q9/13  
[ 110 ]  
 
2009-01-06 China Mobile   Proposed Study Roadmap for Q9 (Multi-Connection Question)     Q9/13  
[ 109 ]  
 
2009-01-06 China Mobile   Proposed Study Roadmap for Q19 (DSN)     Q19/13  
[ 108 ]  
 
2009-01-06 China Mobile   Proposed Scope of Multi-connection Question     Q9/13  
[ 107 ]  
 
2009-01-06 China Mobile   Proposed scope of DSN     Q19/13  
[ 106 ]  
 
2009-01-06 China Mobile, Huawei   Proposal for information flow for IMS based handover control     Q8/13  
[ 105 ]  
 
2009-01-06 Telcordia Technologies and AT&T   Proposed Addition to Y.secMechanisms     Q16/13  
[ 104 ]  
 
2009-01-06 Telcordia Technologies and AT&T   Proposed Addition to Y.ngnIdMuse     Q16/13  
[ 103 ]  
 
2009-01-06 Telcordia Technologies and AT&T   Proposed Changes and Addition to Draft Y.ngnIdMreq     Q16/13  
[ 102 ]  
 
2009-01-06 Telcordia Technologies and AT&T   Proposed Addition to Y.secMechanisms     Q16/13  
Results:176 total items.
Result page:   -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-5-26