Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 76 ]
|
2009-01-06 |
Korea (Republic of)
|
Evolution and Service consideration for Ubiquitous Services
|
Q14/13
|
|
[ 75 ]
|
2009-01-06 |
Korea (Rep. of)
|
Revised text on the chapter.7 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13
|
Q14/13
|
|
[ 74 ]
|
2009-01-06 |
Korea (Rep. of)
|
Proposed new text on the chapter.6 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13
|
Q14/13
|
|
[ 73 ]
|
2009-01-06 |
ETRI
|
Proposal for new draft Recommendation on architectural realizations for content delivery and storage in NGN
|
Q5/13
|
|
[ 72 ]
|
2009-01-06 |
ZTE; China Telecom
|
A proposal to add new clause 8 titled by "Functional Requirements" for Y.NGN-MCC
|
Q3/13
|
|
[ 71 ]
|
2009-01-06 |
ETRI
|
Proposal for obtaining location information of TLM-FE in Y.NACF Rev.1
|
Q5/13
|
|
[ 70 ]
|
2009-01-06 |
ETRI
|
Proposal for adding new information 'mobility protocol type' to TLM-FE in Y.NACF Rev.1
|
Q5/13
|
|
[ 69 ]
|
2009-01-06 |
ETRI
|
Proposal for minor changes in Y.NACF Rev.1
|
Q5/13
|
|
[ 68 ]
|
2009-01-06 |
ETRI
|
Clarification of Home TLM-FE in Y.NACF Rev.1
|
Q5/13
|
|
[ 67 ]
|
2009-01-06 |
ETRI
|
Proposal for new draft recommendation of OSE Functional Architecture for NGN
|
Q5/13
|
|
[ 66 ]
|
2009-01-06 |
KT
|
Initial Input for Discussion on Economic Incentives for Future Network (FN)
|
Q21/13
|
|
[ 65 ]
|
2009-01-06 |
Korea Telecom
,
ETRI
,
Samsung
|
Initial Input for Discussion on Mobility Aspect of Future Network (FN)
|
Q21/13
|
|
[ 64 ]
|
2009-01-06 |
Ministry of Communications & IT, INDIA
|
Draft Y.phy_arch_ngn - New work item on architectural realizations and open interfaces in NGN
|
Q5/13
|
|
[ 63 ]
|
2009-01-06 |
ETRI
|
Discussion on relationship between OSE and USN middleware
|
Q3/13
|
|
[ 62 ]
|
2009-01-06 |
Korea Telecom
|
Proxy Mobile IP based IP mobility scenario for interworking between WiMAX and UMTS
|
Q8/13
|
|
[ 61 ]
|
2009-01-06 |
China Telecom
|
Revision to Q19/13 to include a new study item on Service Traffic Control and Optimization
|
Q19/13
|
|
[ 60 ]
|
2009-01-06 |
China Telecom
,
ZTE
|
Proposed modification to the figure in clause 6 of Y.NGN-MCC
|
Q3/13
|
|
[ 59 ]
|
2009-01-06 |
China Telecom
,
ZTE
|
Proposed modification to clause 7 as "Service Requirements" of Y.NGN-MCC
|
Q3/13
|
|
[ 58 ]
|
2009-01-06 |
China Telecom
,
ZTE
|
Proposed modification to clause 5 of Y.NGN-MCC
|
Q3/13
|
|
[ 57 ]
|
2009-01-06 |
China Telecom
,
ZTE
|
Proposed revision for Y.NGN-R2-Reqts. to support Multimedia Communication Centre (MCC) service
|
Q3/13
|
|
[ 56 ]
|
2009-01-06 |
China Telecom
|
A proposal to add CAVE AKA authentication method in section 9.3 of draft Y.FMC-IMS
|
Q11/13
|
|
[ 55 ]
|
2009-01-06 |
CATR
|
Proposal for some clarification and modification to Y.USN-reqts
|
Q3/13
|
|
[ 54 ]
|
2009-01-06 |
CATR
|
Proposal for adding P2P mechanism between servers into section 7.2.3 of Y.iptv-netcontrol-fw
|
Q3/13
|
|
[ 53 ]
|
2009-01-06 |
MII, China
|
Functional requirements and architecture of the Deep Packet Inspection release 1
|
Q17/13
|
|
[ 52 ]
|
2009-01-06 |
CATR, MII, P.R. China
|
Proposal of supplementary description of Control and Management function in network layer
|
Q20/13
|
Results:176 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):