International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2012-06-11 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-PLEN (2012-06-11) 

ITU-T SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting  from 2012-06-11 to 2012-06-15

held in Switzerland [Geneva]

Other Meetings : [ 2012-06-11 ]  2012-02-17  2011-10-17  2011-05-20  2011-05-13  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-09-02  2009-05-21  2009-01-19 

Results:45 total items.
Result page:  Previous -  1 - 2
Temporary Documents  (PLEN)   Documents / Contributions
 
Number 
Received Source Title Questions
[ 155-PLEN ]  
 
2012-06-13 Editor   Consent - Draft new Recommendation Q.MMtesting     Q10/11  
[ 154-PLEN ]  
 
2012-06-13 Editor   A.5 justification information for draft new Q.MMtesting     Q10/11  
[ 153-PLEN ]  
(Rev.1) 
2012-06-13 Editor   Consent - Draft new Recommendation ITU-T Q.3930 "Performance Testing of Distributed Systems; Concepts and Terminology     Q11/11  
[ 152-PLEN ]  
(Rev.1) 
2012-06-13 Editor   Consent - Output of Q.3303.1 v2: Resource control protocol no.3- Protocol at the interface between a Policy Decision Physical Entity (PD-PE) and a Policy Enforcement Physical Entity (PE-PE): COPS Profile version 2     Q5/11  
[ 151-PLEN ]  
 
2012-06-13 Editor   A.5 justification information for draft revised Q.3303.1 v2 (ex Q.3323.1 (Q.RwCOPS v2))     Q5/11  
[ 150-PLEN ]  
 
2012-06-13 Editors   Consent - Draft Recommendation ITU-T Q.3230(formerly Q.nacp.M13) "Signalling Requirements and Protocol at the M13 interface between TLM-PE and NID-PE"     Q7/11  
[ 149-PLEN ]  
 
2012-06-13 Editors, Q.3230   A.5 justification information for draft new Q.3230 (ex Q.nacp.M13)     Q7/11  
[ 148-PLEN ]  
 
2012-06-13 Editor   Consent - Draft Recommendation Q.3050 (formerly Q.NGN-SigProt)     Q1/11  
[ 147-PLEN ]  
 
2012-06-13 Editor   A.5 justification information for draft new Q.3050 (formerly Q.NGN-SigProt)     Q1/11  
[ 146-PLEN ]  
(Rev.1) 
2012-06-12 TSB   Final List of Participants     QALL/11  
[ 145-PLEN ]  
 
2012-06-08 TSB   Debriefing of TSAG meeting 10-13 January 2012     QALL/11  
[ 144-PLEN ]  
 
2012-06-07 TSB   List of incoming liaison statements to SG11 meeting     QALL/11  
[ 143-PLEN ]  
 
2012-06-07 TSB   Newcomer welcome pack     QALL/11  
[ 142-PLEN ]  
 
2012-06-07 TSB   Summary results of action taken at and since last SG11 meeting (17-21 October 2011)     QALL/11  
[ 141-PLEN ]  
 
2012-06-07 TSB   SG11 meeting facilities and useful information     QALL/11  
[ 140-PLEN ]  
(Rev.1) 
2012-06-07 TSB   List of SG11 meeting documents (Contributions, TD-PLEN and TD-GEN)     QALL/11  
[ 139-PLEN ]  
(Rev.1-3) 
2012-06-07 TSB   SG11 meeting work plan     QALL/11  
[ 138-PLEN ]  
(Rev.1-2) 
2012-06-07 TSB   Draft Agenda: Study Group 11 Plenary meetings (Geneva, 11-15 June 2012)     QALL/11  
[ 137-PLEN ]  
(Rev.1-4) 
2012-06-06 Chairman SG11   Considering updating SG 11 portion of Resolution 2 text     QALL/11  
[ 136-PLEN ]  
 
2012-06-06 TSB   ITU's conformity assessment program and ITU interop events and their relevance to ITU-T SG11     QALL/11  
Results:45 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-20