International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 195 ]  
 
2010-11-12 ANATEL, Brazil   Selecting Measurement Points in Base Stations Evaluations     Q3/5  
[ 194 ]  
 
2010-11-12 CIP, United States   Additional information for phase 2 of L.1000     Q21/5  
[ 193 ]  
 
2010-11-12 CIP, United States   Proposal on future of draft Recommendation ITU-T K.deg     Q16/5  
[ 192 ]  
 
2010-11-12 N/A    
Document withdrawn
 
 
[ 191 ]  
 
2010-11-12 N/A    
Document withdrawn
 
 
[ 190 ]  
 
2010-11-12 Nokia Siemens Networks   Contribution to L.methodology: Evaluation of the environmental impacts of ICT in countries     Q18/5  
[ 189 ]  
 
2010-11-12 Korea (Republic of)   Action items consideration to develop guidance for the assessment of GHG emission in the ICT sector     Q18/5  
[ 188 ]  
 
2010-11-12 Korea (Republic of)   Observed characteristics of GHG inventories of ICT organizations     Q18/5  
[ 187 ]  
 
2010-11-12 Korea (Republic of)   Clarification between L.methodology_ICT_projects and UNFCCC CDM methodologies     Q18/5  
[ 186 ]  
 
2010-11-12 Korea (Republic of)   Modification of Working document toward draft new Recommendation K.guide     Q3/5  
[ 185 ]  
 
2010-11-12 Korea (Republic of) , Alcatel Lucent   Proposal for update of the draft ITU-T Recommendation of L.methodology_ICT in organizations, "Methodology for environmental impact assessment of ICT in organizations"     Q18/5  
[ 184 ]  
 
2010-11-12 Korea (Republic of)   Suggestion of heterogeneous induction source consideration by experimental example     Q9/5  
[ 183 ]  
 
2010-11-12 Korea (Republic of)   Comparing the IEC MOV requirements with those from ITU-T K.77     Q11/5  
[ 182 ]  
 
2010-11-12 Korea (Republic of)   Proposal for K.guide: EMF levels by various transmitters     Q3/5  
[ 181 ]  
 
2010-11-12 Korea (Republic of)   Proposal for K.guide and K.61: Reduction of measurement time     Q3/5  
[ 180 ]  
 
2010-11-12 Korea (Republic of)   Proposal for K.guide: Requirements for the measurement equipment     Q3/5  
[ 179 ]  
 
2010-11-12 Korea (Republic of)   Proposal for K.guide: EMF levels around CDMA base stations     Q3/5  
[ 178 ]  
 
2010-11-11 Alcatel Lucent   Draft Recommendation ITU-T L.methodology_ICT goods, networks and services : Text for paragraph 7.2.2.3 and 7.2.2.4     Q18/5  
[ 177 ]  
 
2010-11-11 Vihaan Networks Ltd.   Proposed new study Question: Rural communications [Setting up a low cost sustainable telecommunication infrastructure in rural areas of developing nations]     QALL/5  
[ 176 ]  
 
2010-11-11 Japan   Proposal of interface specifications for Recommendation L.spec HVDC     Q19/5  
[ 175 ]  
 
2010-11-11 Japan   Proposal of Safety Standard Harmonization on DC Fuse issue and Connector     Q19/5  
[ 174 ]  
 
2010-11-11 Japan   Proposal on the detailed discussion about system boundary and life cycle phases of ICT goods     Q18/5  
[ 173 ]  
 
2010-11-11 Japan   Proposal of the case study on evaluated environmental impact of home office space in the United States of America     Q18/5  
[ 172 ]  
(Rev.1) 
2010-11-11 NTT , NICT   Draft text of ITU-T Recommendation K.leakage "Test method and requirements against information leak through unintentional EM emission", for consent     Q15/5  
[ 171 ]  
 
2010-11-11 China   Appendix IV for L.adapterPhase2 draft     Q21/5  
[ 170 ]  
 
2010-11-11 China   EMC and Safety study and proposal for L.adapterPhase2 draft     Q21/5  
[ 169 ]  
 
2010-11-11 China   Proposal on output power range classification for L.adapterPhase2 draft     Q21/5  
[ 168 ]  
 
2010-11-11 China   Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device     Q21/5  
[ 167 ]  
 
2010-11-11 China   Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)     Q17/5  
[ 166 ]  
 
2010-11-11 China   Propose a new Recommendation on telecommunication terminal equipment EMC     Q16/5  
[ 165 ]  
 
2010-11-11 China   Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices     Q16/5  
[ 164 ]  
 
2010-11-11 ETRI   Proposal for update of Clause 8.2.5 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 163 ]  
 
2010-11-11 ETRI   Discussion and proposal for Clause 9, "ICT project validating," of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 162 ]  
 
2010-11-11 ETRI   Proposal for update of Clause 8 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Q18/5  
[ 161 ]  
 
2010-11-11 Telecom Italia , Huawei   Draft skeleton of new Recommendation L.DC     Q17/5  
[ 160 ]  
 
2010-11-11 Telecom Italia , Huawei   First Draft of new Recommendation L. metrics     Q17/5  
[ 159 ]  
 
2010-11-09 NICT   Effect of RBWs on measured electromagnetic fields from mobile phone base station     Q3/5  
[ 158 ]  
 
2010-11-09 NTT DoCoMo, Inc.   Method for evaluating electromagnetic field in general public environment with wide frequency radio spectrum     Q3/5  
[ 157 ]  
 
2010-11-09 Huawei Technologies   System boundaries for ICT Goods (7.2.2.2)     Q18/5  
[ 156 ]  
 
2010-11-08 Telekomunikacja Polska   Updated version of the software EMF-estimator (v 1.4.0)     Q3/5  
[ 155 ]  
 
2010-11-04 Alcatel-Lucent   Re-allocation of deliverables currently under Q17/5     Q20/5, Q18/5, Q17/5  
[ 154 ]  
 
2010-11-04 China Telecom Corp.   Measurement and analysis of electromagnetic disturbance from in-house BPL     Q8/5  
[ 153 ]  
 
2010-11-04 Ministry PTT Dem. Rep. Congo   Environment and climate change     Q17/5  
[ 152 ]  
 
2010-10-26 Telekomunikacja Polska, Poland   Preliminary Draft New Recommendation K.monitor     Q3/5  
[ 151 ]  
 
2010-10-25 N/A   Document withdrawn  
Pls see TD 517 (GEN/5)
 
 
[ 150 ]  
 
2010-10-25 N/A   Document withdrawn  
Pls see TD 518 (GEN/5)
 
 
[ 149 ]  
 
2010-09-23 Tyco Electronics , EPCOS AG   New chapter for draft new Recommendation ITU-T K.appl     Q13/5  
[ 148 ]  
 
2010-09-14 UK   Proposal for a new Work Item Methodology to evaluate the GHG Impact of ICT in Cities     Q18/5  
[ 147 ]  
 
2010-07-22 Tyco Electronics   A discussion of external coaxial cable port shield leakage     Q4/5  
[ 146 ]  
 
2010-07-02 Tyco Electronics   Proposal for the Polymeric PTC section of K.appl     Q13/5  
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-27