International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2010-11-23 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG05  TD (2010-11-23) 

ITU-T SG05

ICT and climate change

Study Period 2009

Meeting  from 2010-11-23 to 2010-12-01

held in Switzerland [Geneva]

Other Meetings : 2012-10-08  2012-04-11  2011-09-20  2011-04-27  [ 2010-11-23 ]  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 582-GEN ]  
 
Status of Question 12/5     Rapporteur Q12/5   Q12/5   2010-11-23
[ 581-GEN ]  
 
Agenda: Question 12/5     Rapporteur Q12/5   Q12/5   2010-11-23
[ 580-GEN ]  
 
Update CEN/CENELEC/ETSI coordination group on mandate M/462     Rapporteur Q17/5 & ETSI EE liaison officer   Q21/5, Q20/5, Q19/5, Q18/5, Q17/5   2010-11-23
[ 579-GEN ]  
 
Incoming LS: Work on electromagnetic compatibility disturbances within a single device     ITU-R SG5   Q16/5   2010-11-22
[ 578-GEN ]  
 
Incoming LS: Collaboration between IEC TC 111 and ITU-T SG5     IEC TC111   QALL/5   2010-11-22
[ 577-GEN ]  
 
Incoming LS: Continuation of Joint Coordination Activity on Management (JCA-Mgt)     ITU-T SG2   QALL/5   2010-11-22
[ 576-GEN ]  
 
Incoming LS: Prioritization in Network Management Standardization     ITU-T SG2   QALL/5   2010-11-22
[ 575-GEN ]  
 
Incoming LS: SG2 Report and Request in its role as Lead SG on Telecommunication Management     ITU-T SG2   QALL/5   2010-11-22
[ 574-GEN ]  
 
Draft Recommendation on L.lca - The use of Life Cycle Analysis in outside plant     Rapporteur Q21/5   Q21/5   2010-11-22
[ 573-GEN ]  
 
L.2 - "Preservation of wooden poles carrying overhead telecommunication lines"     Rapporteur Q21/5   Q21/5   2010-11-22
[ 572-GEN ]  
 
Energy Gain assessment excel tool for L.adapter Phase 2 drafting in Question 21/5     Rapporteur Q21/5   Q21/5   2010-11-22
[ 571-GEN ]  
 
UCPS configurations drawing for L.adapter Phase 2 understanding and drafting in Question 21/5     Rapporteur Q21/5   Q21/5   2010-11-22
[ 570-GEN ]  
 
Recycling rare metals from ICT wastes - Urban mining     Vice Chair WP3/5 , JCA ICT&CC Co-chairman   Q21/5, Q20/5, Q19/5, Q18/5, Q17/5   2010-11-22
[ 569-GEN ]  
 
Summary of HNSG     Chairman WP1/5   Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5   2010-11-22
[ 568-GEN ]  
 
Status of Question 6/5     Rapporteur Q6/5   Q6/5   2010-11-22
[ 567-GEN ]  
 
Question 16/5 Agenda     Rapporteur Q16/5   Q16/5   2010-11-22
[ 566-GEN ]  
(Rev.1-2) 
Proposal to achieve lightning protection and safety without earthing     Rapporteur Q15/5   Q4/5, Q11/5   2010-11-19
[ 565-GEN ]  
 
Revised draft Recommendation K.im_bb     Rapporteur Q8/5   Q8/5   2010-11-19
[ 564-GEN ]  
 
Proposal to investigate improvement of radiated RF immunity test signal     Rapporteur Q15/5   Q8/5, Q16/5, Q12/5   2010-11-19
[ 563-GEN ]  
 
Proposal to retain the IBN configurations in next version of K.27     Rapporteur Q15/5   Q6/5   2010-11-19
[ 562-GEN ]  
 
Evaluation of lightning overvoltage at internal telecommunication ports for various system earthings     Rapporteur Q15/5   Q4/5   2010-11-19
[ 561-GEN ]  
(Rev.1) 
Simulation results of overcurrents in house model     Rapporteur Q15/5   Q4/5   2010-11-19
[ 560-GEN ]  
 
Overvoltage measured in experimental house model     Rapporteur Q15/5   Q4/5   2010-11-19
[ 559-GEN ]  
(Rev.1) 
An example of lightning damage of telecommunication equipment in customer premises     Rapporteur Q15/5   Q4/5   2010-11-19
[ 558-GEN ]  
(Rev.1-3) 
Agenda: Question 3/5     Rapporteur Q3/5   Q3/5   2010-11-19
[ 557-GEN ]  
 
Incoming LS: Liaison to ITU-T Study Group 5 WP3 on Universal Common Power Supply     GeSI   Q21/5   2010-11-18
[ 556-GEN ]  
(Rev.1-7) 
Draft work plan and room allocation     TSB   QALL/5   2010-11-18
[ 555-GEN ]  
 
External coaxial cable port test proposal     Rapporteur Q4/5   Q4/5   2010-11-18
[ 554-GEN ]  
 
Response to contribution COM5-C 154 : (Measurement and analysis of electromagnetic disturbance from in-house BPL - 2 Measurement of electromagnetic disturbance)     Chairman SG5   Q8/5   2010-11-18
[ 553-GEN ]  
 
Progress Report on Question 16/5     Rapporteur Q16/5   Q16/5   2010-11-18
[ 552-GEN ]  
 
A report on IEEE TC-5 meeting and establishment of new subcommittee for electromagnetic information leakage under TC-5     Rapporteur Q15/5   Q15/5   2010-11-18
[ 551-GEN ]  
 
Announcement on Asia-Pacific EMC Symposium (IEMI and HPEM special sessions)     Rapporteur Q15/5   Q15/5   2010-11-18
[ 550-GEN ]  
 
A report on IEEE EMC 2010 in Fort Lauderdale, USA     Rapporteur Q15/5   Q15/5   2010-11-18
[ 549-GEN ]  
 
Information on new work items proposed in IEC SC77C related to IEMI topics     Rapporteur Q15/5   Q15/5   2010-11-18
[ 548-GEN ]  
(Rev.1) 
Proposal to amend K.65     Editor K.65   Q13/5   2010-11-18
[ 547-GEN ]  
(Rev.1) 
Additional proposal for K.44     Rapporteur Q4/5   Q4/5   2010-11-18
[ 546-GEN ]  
(Rev.1) 
Second draft :Recommendation K.NGN on the EMC requirement for the Next Generation Network equipment     Rapporteur Q12/5   Q12/5   2010-11-18
[ 545-GEN ]  
 
Difficulty about optimizing the performance criteria for the Next Generation Network equipment in TD 253     Rapporteur Q12/5   Q12/5   2010-11-18
[ 544-GEN ]  
 
Incoming LS: Proposed new Question in ITU-T Study Group 9     ITU-R WP6A   QALL/5   2010-11-18
[ 543-GEN ]  
(Rev.1) 
Summary and Review of Question 11/5     Rapporteur Q11/5   Q11/5   2010-11-16
[ 542-GEN ]  
(Rev.1) 
Summary of Question 4/5 discussions     Rapporteur Q4/5   Q4/5   2010-11-16
[ 541-GEN ]  
(Rev.1) 
Proposal to amend K.44     Rapporteur Q4/5   Q4/5   2010-11-16
[ 540-GEN ]  
(Rev.1) 
Proposal to amend K.20, K.21 and K.45     Rapporteur Q4/5   Q4/5   2010-11-16
[ 539-GEN ]  
 
Incoming LS: ITU-R WP 5C comments relating to PLT systems     ITU-R WP 5C   Q2/5   2010-11-16
[ 538-GEN ]  
 
EMF related Resolution adopted in PP-10 (Guadalajara, October 2010)     TSB   Q3/5   2010-11-15
[ 537-GEN ]  
 
ICT&CC related Resolution adopted in PP-10 (Guadalajara, 2010)     TSB   Q21/5, Q20/5, Q19/5, Q18/5, Q17/5   2010-11-15
[ 536-GEN ]  
(Rev.1-3) 
List of incoming liaison statements     TSB   QALL/5   2010-11-15
[ 535-GEN ]  
 
Proposed new chapter for K.Guide - Compliance of nearfield wireless devices     Liaison Rapporteur   Q3/5   2010-11-12
[ 534-GEN ]  
 
Internal port test proposals     Rapporteur Q13/5   Q4/5   2010-11-11
[ 533-GEN ]  
 
Draft text of K.injury     Rapporteur Q11/5   Q11/5   2010-11-11
Results:181 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-02-04