International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2007-06-04 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2007-06-04) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2007-06-04 to 2007-06-15

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Results:76 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 609 ]  
 
Wording for "Reference source selection mechanism" in G.paclock     Semtech   Q13/15   2007-05-25
[ 608 ]  
 
Wording for "Frequency accuracy" in G.paclock     Semtech   Q13/15   2007-05-25
[ 606 ]  
 
Notion of alignment in time, phase, and frequency     Semtech   Q13/15   2007-05-25
[ 605 ]  
 
Min_TDEV Metric     Semtech   Q13/15   2007-05-25
[ 603 ]  
 
Verifying Differential Methods of TDM Clock Recovery     Semtech   Q13/15   2007-05-25
[ 596 ]  
 
Support of PDH over T-MPLS (PW adaptation)     Alcatel-Lucent   Q13/15, Q12/15, Q11/15, Q9/15   2007-05-25
[ 582 ]  
 
Synchronization inputs in G.paclock     Semtech   Q13/15   2007-05-25
[ 581 ]  
 
Scope of G.paclock     Semtech   Q13/15   2007-05-25
[ 580 ]  
 
Wording for "Scope" in G.paclock     Semtech   Q13/15   2007-05-25
[ 579 ]  
 
Proposal to keep SSM transport based upon IEEE802.3ah as an option     Tellabs Oy   Q13/15   2007-05-25
[ 578 ]  
 
Addition of "Through Clock" for Synchronous Ethernet     Tellabs Oy   Q13/15   2007-05-25
[ 577 ]  
 
Two-Way Protocols Test Cases in Appendix VI/G.8261     IL-MOC   Q13/15   2007-05-27
[ 576 ]  
 
A New Appendix for Background Traffic Models Generation Examples     IL-MOC   Q13/15   2007-05-27
[ 575 ]  
 
Modification for Test Case 7 of G.8261     IL-MOC   Q13/15   2007-05-27
[ 571 ]  
 
G.paclock document structure     Zarlink   Q13/15   2007-05-25
[ 570 ]  
 
G.paclock - editorial/clarifications     Zarlink   Q13/15   2007-05-25
[ 569 ]  
 
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1     Zarlink   Q13/15   2007-05-25
[ 568 ]  
 
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions     Zarlink   Q13/15   2007-05-25
[ 567 ]  
 
G.paclock - Figure 14     Zarlink   Q13/15   2007-05-25
[ 566 ]  
 
Synchronous Ethernet - jitter requirements     Zarlink   Q13/15   2007-05-25
[ 565 ]  
 
G.paclock - Clause 5.4.3 Jitter     Zarlink   Q13/15   2007-05-25
[ 564 ]  
 
G.paclock - Clause 5.5.2 Jitter Tolerance     Zarlink   Q13/15   2007-05-25
[ 563 ]  
 
Line timing in Synchronous Ethernet     Zarlink   Q13/15   2007-05-25
[ 558 ]  
 
G.8261 Appendix IX Use Cases Transport Requirements     Nortel Networks (Canada)   Q13/15   2007-05-25
[ 557 ]  
 
G.8261 Appendix IX clarifications     Nortel Networks (Canada)   Q13/15   2007-05-25
[ 517 ]  
 
WITHDRAWN - See C495     N/A   Q13/15   N/A
[ 506 ]  
 
Explanation of G.pacxyz structure for the scope chapter of the recommendations     Deutsche Telekom   Q13/15   2007-05-25
[ 505 ]  
 
Synchronization signal and E-SSM path continuity     Cisco   Q13/15   2007-05-25
[ 504 ]  
 
Option for E-OAM supporting E-SSM transmission     Cisco   Q13/15   2007-05-25
[ 500 ]  
 
Proposals for EEC Network Limits (Clause 7.2.1 in G.8261)     Ericsson   Q13/15   2007-05-24
[ 499 ]  
 
Proposals for EEC Jitter Limits in G.paclock     Ericsson   Q13/15   2007-05-24
[ 498 ]  
 
Proposals for Appendix IX in G.8261     Ericsson   Q13/15   2007-05-24
[ 497 ]  
 
Proposals for Test Cases in appendix VI in G.8261     Ericsson   Q13/15   2007-05-24
[ 496 ]  
 
Proposals for clause 8.1 in G.8261     Ericsson   Q13/15   2007-05-24
[ 495 ]  
 
Proposals for models in Appendix V in G.8261     Ericsson , Cisco   Q13/15   2007-05-24
[ 483 ]  
 
Proposed structure for G.pacmod     Nortel   Q13/15   2007-05-24
[ 482 ]  
 
Clarification to sections in current draft of G.paclock     Nortel   Q13/15   2007-05-24
[ 481 ]  
 
Additional considerations for specification of STM-256 jitter in G.783 and G.825     Nortel   Q13/15   2007-05-24
[ 480 ]  
 
SSM processing time considerations     Nortel   Q13/15   2007-05-24
[ 461 ]  
 
Considerations in Sync Ethernet over OTN     Huawei Technologies Co., Ltd   Q13/15, Q11/15, Q9/15   2007-05-24
[ 460 ]  
 
Consideration about the time requirement     Huawei Technologies Co., Ltd   Q13/15   2007-05-24
[ 450 ]  
 
3GPP contributions addressing the need for a clarification of the synchronization requirement at the input of the base stations (for information)     France Telecom   Q13/15   2007-05-24
[ 449 ]  
 
Proposal of transmission of a phase information using OAM messages     France Telecom   Q13/15   2007-05-24
[ 448 ]  
 
G.Paclock - Split of the recommendation into two documents.     France Telecom   Q13/15   2007-05-24
[ 447 ]  
 
Synchronous Ethernet SSM - list of issues     France Telecom   Q13/15   2007-05-24
[ 446 ]  
 
Corrections in G.8261 latest draft     France Telecom   Q13/15   2007-05-24
[ 437 ]  
 
G.paclock: proposal for jitter tolerance section 5.5.2     Alcatel-Lucent   Q13/15   2007-05-24
[ 436 ]  
 
Influence of the SSM rate on the reconfiguration time     Alcatel-Lucent   Q13/15   2007-05-24
[ 435 ]  
 
Proposal for modification of section 5.1 of G.paclock     Alcatel-Lucent   Q13/15   2007-05-24
[ 434 ]  
 
Notion of skewness     Semtech   Q13/15   2007-05-25
Results:76 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19