International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-10-30 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2006-10-30) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-10-30 to 2006-11-10

held in Switzerland [Geneva]

Other Meetings : 2009-09-28  2008-12-01  2008-02-11  2007-06-04  2006-02-06  2005-05-16  2004-11-29 

Results:23 total items.
Contributions  [ Source: Huawei Technologies ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 272 ]  
 
2006-10-20 Alcatel , Huawei Technologies   Proposed text for Draft Amendment 1 to Recommendation G.8110.1     Q12/15  
[ 267 ]  
 
2006-10-20 Huawei Technologies , Alcatel , Tellabs Oy   Proposals for draft Recommendation G.8131 (Protection switching for Transport MPLS (T-MPLS) networks)     Q9/15  
[ 152 ]  
 
2006-10-19 Huawei Technologies   Power Load Management M.E.     Q2/15  
[ 151 ]  
 
2006-10-19 Huawei Technologies   Path Degradation in Packet Transport Network     Q9/15, Q12/15  
[ 150 ]  
 
2006-10-19 Huawei Technologies   Proposal for G.984.4 modelling of SDH over GEM     Q2/15  
[ 149 ]  
 
2006-10-19 MII China , Huawei Technologies   VDSL2: Key issues to emergency rate reduction(SOS)     Q4/15  
[ 148 ]  
 
2006-10-19 Huawei Technologies , Siemens AG , China Telecom   VS Tunnel Multiplexing and Services Discussion     Q12/15  
[ 147 ]  
 
2006-10-19 Huawei Technologies   Proposed text for G.7716 draft     Q14/15  
[ 146 ]  
 
2006-10-19 Huawei Technologies   Proposal for TCM in G.8110.1     Q12/15  
[ 145 ]  
 
2006-10-19 Huawei Technologies   Propose to add RPR/TM adaptation function     Q12/15  
[ 144 ]  
 
2006-10-19 Huawei Technologies   Shared Bandwidth Rate Control     Q12/15, Q9/15  
[ 143 ]  
 
2006-10-19 Huawei Technologies   Proposal for FC over T-MPLS     Q12/15  
[ 142 ]  
 
2006-10-19 Huawei Technologies   Proposal for E-Tree service in G.8011     Q11/15  
[ 141 ]  
 
2006-10-19 Huawei Technologies   Proposed Functional Requirements for Automatic Synchronization Distribution     Q13/15  
[ 140 ]  
 
2006-10-19 Huawei Technologies   Proposal for TCM in G.798     Q11/15, Q9/15  
[ 139 ]  
 
2006-10-19 Huawei Technologies   Corrigendum to G.7043/Y.1343     Q11/15  
[ 138 ]  
 
2006-10-19 Huawei Technologies   Proposals for application code and Physical layer parameters and values for G.dapp2 applications     Q6/15  
[ 137 ]  
 
2006-10-19 Huawei Technologies   Proposal for TCM in G.709     Q9/15, Q11/15  
[ 136 ]  
 
2006-10-19 Huawei Technologies   Proposal for sequencing TCM levels in G.798     Q11/15, Q9/15  
[ 135 ]  
 
2006-10-19 Huawei Technologies   Comments on draft G.dapp2 version 0.31     Q6/15  
[ 134 ]  
 
2006-10-19 Huawei Technologies   Clarification to questions raised to WD23 at Ottawa Q13/15 Meeting that was held June 19 - 23, 2006 in Ottawa, Canada     Q13/15  
[ 133 ]  
 
2006-10-19 Huawei Technologies   Automatic Sync Distribution Technique     Q13/15  
[ 132 ]  
 
2006-10-19 MII China , Huawei Technologies   VDSL2: Work Items on In-Domain FEXT Cancellation     Q4/15  
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2013-5-21