International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Results:564 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 64 ]  
 
2007-04-05 ETRI   Proposed Editorial Changes for Y.enet     Q4/13  
[ 63 ]  
 
2007-04-05 ETRI   Proposal for splitting Y.ipv6transit     Q9/13  
[ 62 ]  
 
2007-04-05 Japan   Proposal for the work plan and study period of FG-IPTV     QALL/13  
[ 61 ]  
 
2007-04-05 NEC Corporation   Proposed modifications to Y.ngn-openenv  
Withdrawn - please see Contribution 135
 
Q2/13  
[ 60 ]  
 
2007-04-05 ETRI   Proposed New Draft Recommendation Y.NGN-DSL     Q3/13  
[ 59 ]  
 
2007-04-05 ETRI   Codec vision including mobility and requirements of NGN R2     Q2/13  
[ 58 ]  
 
2007-04-05 RAD Data Communications   Y.gca - Specific Client Services     Q7/13  
[ 57 ]  
 
2007-04-05 RAD Data Communications   Y.gca - Specific Server Networks     Q7/13  
[ 56 ]  
 
2007-04-05 RAD Data Communications   Y.gca - Functional group considerations     Q7/13  
[ 55 ]  
 
2007-04-05 RAD Data Communications   Y.gca - General Requirements     Q7/13  
[ 54 ]  
 
2007-04-05 RDA Data Communications   Y.gca - Clause 6 (Generic Client Adaptation)     Q5/13, Q7/13  
[ 53 ]  
 
2007-04-05 RAD Data Communications   Y.gca - Definitions and Conventions     Q7/13  
[ 52 ]  
 
2007-04-05 RAD Data Communications   Y.gca and Multisegment Transport Interworking     Q7/13  
[ 51 ]  
 
2007-04-05 Fujitsu   Proposed modification on draft Y.1731     Q5/13  
[ 50 ]  
 
2007-04-05 Fujitsu   Comments and proposed modification on draft Y.17tor     Q5/13  
[ 49 ]  
 
2007-04-05 Fujitsu   Comments and proposed modification on draft Y.17tom     Q5/13  
[ 48 ]  
 
2007-04-05 Juniper Networks , Cisco Systems   Proposed changes to OAM requirements for T-MPLS - Draft Recommendation Y.17tor     Q5/13  
[ 47 ]  
 
2007-04-05 Juniper Networks , Cisco Systems   Security aspects of OAM for T-MPLS     Q5/13  
[ 46 ]  
 
2007-04-04 BT Group   Proposed new subsection E1.3 combining FSA control at the flow level and the aggregate flow level     Q4/13  
[ 45 ]  
 
2007-04-04 BT Group   Y.flowreq baseline input document     Q4/13  
[ 44 ]  
 
2007-04-04 BT Group   Security Considerations and Requirements in draft Y.flowreq     Q4/13  
[ 43 ]  
 
2007-04-04 Polycom Inc.   Modification proposals for Y.ngn-et-tech for accessibility     Q3/13  
[ 42 ]  
 
2007-04-04 Polycom Inc.   Modification proposals for Y.ngn.rtconv for accessibility     Q2/13  
[ 41 ]  
 
2007-04-04 Polycom Inc.   Additions to Y.2201 for accessibility for people with disabilities     Q2/13  
[ 40 ]  
 
2007-04-04 ETRI   Mobility management related definitions for NGN R2     Q11/13, Q1/13  
Results:564 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-01-17