International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2008-01-14 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG13  TD-WP2 (2008-01-14) 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Meeting  from 2008-01-14 to 2008-01-25

held in Switzerland [Geneva]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  [ 2008-01-14 ]  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:103 total items.
Result page:  Previous -  1 - 2 - 3
Temporary Documents  (WP2)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 358-WP2 ]  
 
Liaison statement on Identity Management (27 N 5889)     ISO/IEC JTC 1/SC 27   Q15/13   2007-06-26
[ 357-WP2 ]  
 
Liaison statement on performance Recommendations administered by ITU-R Working Party 4B     ITU-R WP 4B   Q10/13   2007-06-21
[ 356-WP2 ]  
 
Liaison statement on ITU-T Rec. X.cap "Common alerting protocol (CAP 1.1)" and ITU-T Rec. X.cap2 "ASN.1 specification for the Common alerting protocol (CAP 1.1)"     WP 2/17   Q3/13   2007-06-04
Results:103 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26