International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestrial Broadcasting Delivery

Results:562 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 187 ]  
 
2013-02-06 ITU-T SG 16   Reply liaison statement to ITU-R Working Party 5A on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range     N/A  
[ 186 ]  
 
2013-01-09 ITU-T FG-DR&NRR   Reply liaison statement on the IRDR project     N/A  
[ 185 ]  
 
2012-12-06 JTG 4-5-6-7   Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     N/A  
[ 184 ]  
 
2012-11-30 JTG 4-5-6-7   Liaison statement to Working Party 6A - SAB/SAP parameters for sharing studies under WRC-15 Agenda item 1.2     N/A  
[ 183 ]  
 
2012-11-30 JTG 4-5-6-7   Liaison statement to Working Party 6A - Spectrum requirements for the broadcasting service under WRC-15 Agenda item 1.2     N/A  
[ 182 ]  
 
2012-11-30 JTG 4-5-6-7   Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2     N/A  
[ 181 ]  
 
2012-11-30 JTG 4-5-6-7   Liaison statement to Working Party 3K (copy to Working Parties 3M, 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable     N/A  
[ 180 ]  
 
2012-11-21 Chairman, SG 6   Liaison statement from ITU-D Study Group 1 on the elaboration of a working definition of the term "ICT"     N/A  
[ 179 ]  
 
2012-11-20 WP 5A   Laison statement to Working Party 6A on cognitive radio systems (CRS)     N/A  
[ 178 ]  
 
2012-11-16 WP 5B   Liaison statement to ITU-R Working Party 6A - Studies of potential for interference from broadcasting systems into unmanned aircraft systems in the 12.2 to 12.5 GHz frequency band     N/A  
[ 177 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     N/A  
[ 176 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     N/A  
[ 175 ]  
(Rev.1) 
2012-11-16 WPs 5A, 5B and 5C   Liaison statement to ITU-R Working Parties 1A, 4C, 5D, 6A, 7C and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5, 9 and 15 for information and/or action if any)     N/A  
[ 174 ]  
 
2012-11-15 WP 5A   Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     N/A  
[ 173 ]  
 
2012-11-14 WP 5B   Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     N/A  
[ 172 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     N/A  
[ 171 ]  
 
2012-11-14 WP 5C   Liaison statement to ITU-R Working Parties 3L, 3B and 6A - Future revision of Recommendation ITU-R P.842     N/A  
[ 170 ]  
+Ann.1-15 
2012-10-31 Chairman, WP 6A   Report of the meeting of Working Party 6A (Geneva, 17-29 October 2012)     N/A  
[ 169 ]  
 
2012-10-29 Director, BR   Final list of participants - Geneva, 17-29 October 2012     N/A  
[ 168 ]  
 
2012-10-16 BR Study Groups Department   List of documents issued (Documents 6A/73 - 6A/168)     N/A  
[ 167 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 6A) - Studies on spectrum requirements for WRC-15 Agenda item 1.2     N/A  
[ 166 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2     N/A  
[ 165 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A)     N/A  
[ 164 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     N/A  
[ 163 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     N/A  
Results:562 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-02-24