Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 241 ]
|
2013-01-22 |
Telstra Corporation Ltd.
|
Network deployment parameters for use in the estimation of future radio spectrum neds of IMT and IMT-Advanced
|
N/A
|
|
[ 240 ]
|
2013-01-22 |
Iran (Islamic Republic of)
|
Discussion on some candidate bands under Agenda item 1.1
|
N/A
|
|
[ 239 ]
|
2013-01-22 |
United States of America
|
Information document related to WP 5D activity on the development of a preliminary draft new Report IMT.[LOW POWER]
|
N/A
|
|
[ 238 ]
|
2013-01-22 |
Motorola Solutions Inc.
|
Proposed modifications to the working document towards a preliminary draft new Report [BROAD.PPDR] - The use of International Mobile Telecommunications (IMT) for Broadband Public Protection and Disaster Relief (PPDR) applications
|
N/A
|
|
[ 237 ]
|
2013-01-22 |
IEEE
|
Comments on the working document towards a PDNR on the use of IMT for broadband PPDR applications
|
N/A
|
|
[ 236 ]
|
2013-01-22 |
United States of America
|
United States input on working document towards a preliminary draft new Report IMT.[LOW POWER]
|
N/A
|
|
[ 235 ]
|
2013-01-22 |
United States of America
|
Input on working document towards a preliminary draft new Recommendation ITU-R M.IMT.VISION]
|
N/A
|
|
[ 234 ]
|
2013-01-22 |
United States of America
|
Proposed revisions to the working document toward a preliminary draft new Report[BROAD.PPDR], "The use of International Mobile Telecommunications (IMT) for broadband Public Protection and Disaster Relief (PPDR) applications"
|
N/A
|
|
[ 233 ]
|
2013-01-22 |
United States of America
|
Proposed structure and content for draft liaison statement to JTG 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
N/A
|
|
[ 232 ]
|
2013-01-22 |
Telstra Corporation Ltd.
|
Possible extension of the 2 100 MHz band for IMT systems
|
N/A
|
|
[ 231 ]
|
2013-01-22 |
Telstra Corporation Ltd.
|
Spectrum efficiency estimates for IMT-Advanced systems for use in estimating future spectrum requirements
|
N/A
|
|
[ 230 ]
(Rev.1) |
2013-01-21 |
WWRF Liaison Rapporteur
|
Report on the recent activities of Wireless World Research Forum (WWRF)
|
N/A
|
|
[ 229 ]
|
2013-01-21 |
Russian Federation
|
Proposals on deployment-related parameters of IMT systems in the frequency range below 1 GHz proposed to be used in sharing studies on WRC-15 Agenda items 1.1 and 1.2
|
N/A
|
|
[ 228 ]
|
2013-01-21 |
Russian Federation
|
The 5 925-6 425 MHz frequency range suitability description
|
N/A
|
|
[ 227 ]
|
2013-01-21 |
Russian Federation
|
Issues to be considered in developing response to liaison statement from JTG 4-5-6-7 on spectrum requirements related to WRC-15 Agenda item 1.1
|
N/A
|
|
[ 226 ]
|
2013-01-18 |
Australia
|
Input to the development of the working document towards a preliminary draft new Report on the use of IMT for broadband PPDR applications
|
N/A
|
|
[ 225 ]
|
2013-01-18 |
Australia
|
Input to studies towards WRC-15 Agenda item 1.1 - Assessment of the suitability of specific frequency ranges for IMT
|
N/A
|
|
[ 224 ]
|
2013-01-17 |
CITEL Rapporteur
|
Update Report on CITEL PCC.II activities
|
N/A
|
|
[ 223 ]
|
2012-12-11 |
Director, BR
|
Reply liaison statement from Working Party 5D on parameters for LTE-Advanced and WirelessMAN Advanced for use in sharing studies
|
N/A
|
|
[ 222 ]
|
2012-12-11 |
Director, BR
|
Reply liaison statement on parameters for LTE-Advanced and WirelessMAN Advanced for use in sharing studies
|
N/A
|
|
[ 221 ]
|
2012-12-11 |
Ecuador
|
Ecuador approves A5-APT segmentation model for the 700 MHz band
|
N/A
|
|
[ 220 ]
|
2012-12-06 |
JTG 4-5-6-7
|
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics
|
N/A
|
|
[ 219 ]
|
2012-11-30 |
JTG 4-5-6-7
|
Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2
|
N/A
|
|
[ 218 ]
|
2012-11-30 |
JTG 4-5-6-7
|
Liaison statement to Working Party 3K (copy to Working Parties 3M, 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable
|
N/A
|
|
[ 217 ]
|
2012-11-30 |
JTG 4-5-6-7
|
Liaison statement to Working Parties 5A and 5D - Spectrum requirements related to WRC-15 Agenda item 1.1
|
N/A
|
Results:341 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):