International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 112 ]  
+Ann.1-8 
Report on the tenth meeting of Working Party 5C (Geneva, 5 - 14 November 2012)     Chairman, WP 5C     2012-11-14
[ 111 ]  
 
Final List of Participants, ITU-R Working Party 5C, Geneva, 5 - 14 November 2012     Director, BR     2012-11-14
[ 110 ]  
 
Assignment of a document submitted to Study Group 5 - Activities of Correspondence Group 3K3 concerning Recommendation ITU-R P.528-3 and propagation model IF-77     Chairman, SG 5     2012-11-12
[ 109 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 3M, 5C, 7B, 7D) - Information on amateur service systems at 77.5-78 GHz for use in sharing studies for WRC-15 Agenda item 1.18     WP 5A     2012-11-12
[ 108 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 107 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 106 ]  
 
List of documents issued (Documents 5C/47 - 5C/106)     BR Study Groups Department     2012-11-02
[ 105 ]  
 
Liaison statement to Working Party 5A with copy to Working Parties 5C, 5D and 1B on further studies on cognitive radio systems (CRS)     WP 6A     2012-11-02
[ 104 ]  
 
Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals     WP 6A     2012-11-02
[ 103 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] and proposed draft liaison statement to Working Party 5A and Working Party 5B - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and vehicular collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz     Canada     2012-10-29
[ 102 ]  
 
Proposed liaison statement to Working Parties 4A and 4C - Fixed service characteristics, protection criteria for WRC-15 Agenda item 1.9.1, 1.9.2 and 1.10     France , Germany (Federal Republic of) , Ireland , Luxembourg , Netherlands (Kingdom of the) , Norway     2012-10-29
[ 101 ]  
 
Draft revisions of Recommendations ITU-R F.1247-2, ITU-R F.1249-2 and ITU-R F.1509-1     Japan     2012-10-29
[ 100 ]  
 
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     Japan     2012-10-29
[ 99 ]  
 
Applicability of the sectoral antenna reference patterns in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz     Japan   242-1/5   2012-10-29
[ 98 ]  
 
Proposals for draft revision of Recommendations ITU-R F.383-8, ITU-R F.635-6 and ITU-R F.1099-4 and consequential updating of Recommendation ITU-R F.746-10     Japan   247-1/5   2012-10-29
[ 97 ]  
 
Review of certain SF-series Recommendations     Japan     2012-10-29
[ 96 ]  
 
Proposed revision of Recommendation ITU-R F.557-4 and editorial updates of certain F-Series Recommendations     Japan     2012-10-29
[ 95 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth to-space) and the fixed service in the 7-8 GHz range     France , European Space Agency     2012-10-28
[ 94 ]  
 
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     Canada     2012-10-18
[ 93 ]  
 
Preliminary draft new Report ITU-R F.[HF-NETWORK RELIABILITY] - Reliability calculations for adaptive HF fixed service network     Canada     2012-10-18
[ 92 ]  
 
Preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in HF fixed and land mobile radiocommunication systems     Canada     2012-10-18
[ 91 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Parties 4B and 5C - Appointment of Sub-Working Group Handbook Chairman and work progress     WP 5D     2012-10-16
[ 90 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 89 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 88 ]  
 
Liaison statement to Working Parties 5A and 5C - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz     WP 5D     2012-10-16
[ 87 ]  
 
Note to Study Group 5 (copy for information to WPs 5A, 5B and 5C) - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     WP 5D     2012-10-16
[ 86 ]  
 
Liaison statement to Working Party 5B - (copy to WPs 5A and 5C for information) - WRC-15 Agenda item 1.15     WP 5D     2012-10-15
[ 85 ]  
 
Reply liaison statement to Working Party 5C - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz     WP 7C     2012-10-15
[ 84 ]  
 
Progress report of Joint Correspondence Group Activity     Chairman, JCG 5A/5C     2012-10-15
[ 83 ]  
 
US comments on cross-border coordination Handbook (Document 5A-5C/4)     United States of America     2012-10-06
[ 82 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C - Sharing the 7-8 GHz band between proposed EESS (Earth-to-space) under WRC-15 Agenda item 1.11 and existing terrestrial services     WP 7B     2012-10-05
[ 81 ]  
 
Liaison statement to Working Party 5C - Protection criteria and modelling for WRC-15 Agenda item 1.13     WP 7B     2012-10-05
[ 80 ]  
 
Liaison statement to Working Parties 5A and 5C (for action) and Working Parties 4C, 5B, 7A, 7B, 7C and 7D (for information) - WRC-15 Agenda item 1.8     WP 4A     2012-10-05
[ 79 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B, 7C and 7D (copy to Working Parties 3M and 6B for information) - WRC-15 Agenda item 1.6     WP 4A     2012-10-05
[ 78 ]  
 
Liaison statement to Study Group 5 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     SG 4     2012-10-04
[ 77 ]  
 
Liaison statement to Working Party 5C - Fixed service characteristics and criteria in relation with WRC-15 Agenda item 1.9.1     WP 4A     2012-10-03
[ 76 ]  
 
Progress of the studies in response to ITU-R Resolutions     Chairman, SG 5     2012-09-24
[ 75 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1     WP 4A     2012-09-24
[ 74 ]  
 
Liaison statement to Working Parties 5A, 5C and 5D - Working document towards a preliminary draft new Report ITU-R M.[RDSS & MSS COORD]     WP 4C     2012-09-19
[ 73 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 Agenda item 1.10     WP 4C     2012-09-18
[ 72 ]  
 
Liaison statement to Working Party 5C - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda items 1.9.2 and 1.10     WP 4C     2012-09-17
[ 71 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     WP 4C     2012-09-14
[ 70 ]  
 
Proposal on the arrangement of ITU-R Recommendations of the "M"-series     Russian Federation     2012-08-29
[ 69 ]  
 
Draft revision of Recommendation ITU-R F.749-3 - Radio-frequency arrangements for systems of the fixed service operating in sub-bands in the 36-40.5 GHz band     Iran (Islamic Republic of)     2012-08-27
[ 68 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Party 4B and Working Party 5C     WP 5D     2012-07-23
[ 67 ]  
 
Results of the 19th RAG meeting     Chairman, SG 5     2012-07-03
[ 66 ]  
 
Liaison statement to Working Parties 6A and 5C - Future revision of Recommendation ITU-R P.842     WP 3L     2012-07-02
[ 65 ]  
(Rev.1) 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies     WP 3M     2012-06-29
[ 64 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)     WPs 1A and 1B     2012-06-25
[ 63 ]  
 
Liaison statement to Working Parties 5A, 5C and 5D - WRC-15 Agenda item 9.1, issue 9.1.6     WP 1B     2012-06-22
Results:437 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-10-06