International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:724 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 649 ]  
 
2015-01-08 ITU-D SG 1   Liaison statement from ITU-D/ITU-R Joint Group for Resolution 9 to ITU-R SG 1, ITU-R SG 5, ITU-R SG 6 and their relevant Working Parties on work items during the 2014-2017 study period     N/A  
[ 648 ]  
 
2015-01-07 ITU-T SG 15   Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan     N/A  
[ 647 ]  
 
2015-01-07 ITU-T SG 15   Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan     N/A  
[ 646 ]  
 
2014-12-12 ITU-T SG 15   Liaison statement on consented revised Recommendation ITU-T G.9959     N/A  
[ 645 ]  
 
2014-12-12 ITU-T SG 15   Liaison statement on treatment about FG-DR&NRR deliverables (reply to ITU-T SG2-LS056)     N/A  
[ 644 ]  
 
2014-12-10 Organizaiton Meteorological Organization   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C as responsible Groups for WRC-15 agenda item 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1 (Issues 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8), 10 (copy to Working Party 5D)     N/A  
[ 643 ]  
 
2014-12-01 WP 6A   Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz     N/A  
[ 642 ]  
 
2014-11-28 WP 5C   Reply liaison statement to ITU-T Study Group 15, ITU-R Working Party 5D, MEF (copy to ITU-R Working Party 5A, 3GPP, BBF for information) - Work on draft new Report ITU-R F.[FS.IMT/BB]     N/A  
[ 641 ]  
 
2014-11-28 WP 5C   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future     N/A  
[ 640 ]  
 
2014-11-11 WP 5B   Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     N/A  
[ 639 ]  
 
2014-11-10 WP 5B   Liaison statement to ITU-T Study Groups 5, 9 & 15 and ITU-R Working Parties 1A & 3M (copy to for information ITU-R Working Parties 5A, 5C, 6A & 7D) - Co-existence between Radiocommunication systems and new wired telecommunications standards     N/A  
[ 638 ]  
 
2014-11-10 WP 5B   Liaison statement to Working Party 1B (copied for information to Working Parties 5A, 5C & 5D) - Liaison statement on the development of a working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]     N/A  
[ 637 ]  
 
2014-11-10 WP 5C   Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference     N/A  
[ 636 ]  
+Ann.1-14 
2014-11-06 Chairman, WP 5A   Report on the fourteenth meeting of Working Party 5A (Geneva, 27 October - 6 November 2014)     N/A  
[ 635 ]  
 
2014-06-11 Director, BR   Final list of participants - Working Party 5A (Geneva, 27 October - 6 November 2014)     N/A  
[ 634 ]  
 
2014-11-05 Liaison Rapporteur   Report on relevant activities in certain countries in Region 2     N/A  
[ 633 ]  
 
2014-10-27 WWRF Liaison Rapporteur   Report on the recent activities of Wireless World Research Forum (WWRF)     N/A  
[ 632 ]  
 
2014-10-27 Liaison Rapporteur   Report on relevant activities in certain countries in Region 3     N/A  
[ 631 ]  
(Rev.1) 
2014-10-27 BR Study Groups Department   List of documents issued (Documents 5A/543 - 5A/635)     N/A  
[ 630 ]  
 
2014-10-24 Disaster Relief Liaison Rapporteur   Report on disaster relief     N/A  
[ 629 ]  
 
2014-10-23 WP 5D   Liaison statement to Working Party 5C (copy to Working Party 5A) - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     N/A  
[ 628 ]  
 
2014-10-23 WP 5D   Liaison statement to ITU-T Study Group 13 (copy for information to ITU-D Study Groups 1 and 2, ITU-T Study Group 15, ITU-R Study Group 5, and ITU-T Working Party 5A) - Roadmap on IMT and new areas for study under IMT     N/A  
[ 627 ]  
 
2014-10-23 WP 5D   Liaison statement to Working Party 5A on revision of Recommendation ITU-R M.2009     N/A  
[ 626 ]  
 
2014-10-23 WP 5D   Liaison statement to Working Parties 5A and 6A - Interactive unicast and multicast audio-visual capabilities and applications provided over terrestrial International Mobile Telecommunication (IMT) systems     N/A  
[ 625 ]  
 
2014-10-20 Orange , Telecom Italia S.p.A.   Proposed modifications to the preliminary draft new Report ITU-R [LMS.CRS2]     N/A  
Results:724 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-06-30