International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:459 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 109 ]  
 
2012-10-01 WP 4B   Liaison statement to ITU-R Working Party 5A and ITU-T Focus Group on disaster relief systems, network resilience and recovery - Information about the use of FSS systems in disaster response and relief     N/A  
[ 108 ]  
 
2012-09-25 Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T, Inc. , Hitachi, Ltd. , Huawei Technologies Co. Ltd. , Intel Corporation , Motorola Mobility LLC , NEC Corporation , Samsung Electronics Co., Ltd. , Telecom Italia S.p.A. , Telefon AB - LM Ericsson , Telefónica, S.A. , ZTE Corporation   Response to ITU-R WP 5A (copy to ITU-R WP 5D) Review of the working document towards the revision of Recommendation ITU-R M.2009     N/A  
[ 107 ]  
 
2012-09-25 Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T, Inc. , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Hitachi, Ltd. , Huawei Technologies Co. Ltd. , Intel Corporation , Motorola Mobility LCC , NEC Corporation , Samsung Electronics Co., Ltd. , Telecom Italia S.p.A. , Telefon AB - LM Ericsson , Telefónica, S.A. , ZTE Corporation   Response to ITU-R Working Party 5A (copy to ITU-R Working Party 5D) - Revision work on Recommendation ITU-R M.1801 and Report ITU-R M.2116     N/A  
[ 106 ]  
 
2012-09-24 Chairman, SG 5   Progress of the studies in response to ITU-R Resolutions     N/A  
[ 105 ]  
 
2012-09-24 WP 4A   Liaison statement to Working Parties 3M, 5A, 5C, 7B - WRC-15 Agenda item 1.9.1     N/A  
[ 104 ]  
 
2012-09-19 WP 4C   Liaison statement to Working Parties 5A, 5C and 5D - Working document towards a preliminary draft new Report ITU-R M.[RDSS & MSS COORD]     N/A  
[ 103 ]  
 
2012-09-19 WP 4C   Liaison statement to Working Party 5A - WRC-15 Agenda item 9.1.1     N/A  
[ 102 ]  
 
2012-09-18 WP 4C   Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D     N/A  
[ 101 ]  
 
2012-09-14 WP 4C   Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2     N/A  
[ 100 ]  
 
2012-09-12 ETSI   Reply liaison statement regarding the proposed draft revision of Recommendation ITU-R M.1801 - Radio interface standards for broadband wireless access systems, including mobile and nomadic applications, in the mobile service operating below 6 GHz     N/A  
[ 99 ]  
 
2012-08-29 Russian Federation   Proposal on the arrangement of ITU-R Recommendations of the "M"-series     N/A  
[ 98 ]  
 
2012-08-16 ITU-D SG 1   Liaison statement on ITU-D Q. 23/1     N/A  
[ 97 ]  
 
2012-08-06 Alliance for Telecommunications Industry Solutions   Proposed revision of Recommendation ITU-R M.2009     N/A  
[ 96 ]  
 
2012-07-23 WP 5D   Liaison statement to Working Party 5A - Preparations for WRC-15 Agenda item 1.3     N/A  
[ 95 ]  
 
2012-07-23 WP 5D   Liaison statement to ITU-T Study Group 15 regarding G.WNB, narrow-band wireless home networking (copy to ITU-R, Working Parties 1B and 5A)     N/A  
[ 94 ]  
 
2012-07-09 Israel (State of)   Channelling arrangements for the band 694-790 MHz and broadband mobile for public protection and disaster relief (PPDR)     N/A  
[ 93 ]  
 
2012-07-03 Chairman, FG-DR&NRR   Liaison statement - Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery     N/A  
[ 92 ]  
 
2012-07-03 Chairman, SG 5   Results of the 19th RAG meeting     N/A  
[ 91 ]  
(Rev.1) 
2012-06-29 WP 3M   Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies     N/A  
[ 90 ]  
 
2012-06-27 WP 1B   Reply liaison statement to ITU-T Study Group 15 regarding narrow-band wireless home networking (copy to ITU-R Working Parties 5A and 5D and ITU-T Study Group 5)     N/A  
[ 89 ]  
 
2012-06-25 WPs 1A and 1B   Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)     N/A  
[ 88 ]  
 
2012-06-22 WP 1B   Liaison statement to Working Parties 5A, 5C and 5D - WRC-15 Agenda item 9.1, issue 9.1.6     N/A  
[ 87 ]  
 
2012-06-22 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     N/A  
[ 86 ]  
 
2012-06-19 WP 4A   Liaison statement to Working Party 5A - WRC-15 Agenda item 1.8     N/A  
[ 85 ]  
 
2012-06-19 WP 1A   Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services     N/A  
Results:459 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-04-17