International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4C  C 

ITU-R WP4C

Efficient Orbit/Spectrum Utilization for MSS and RDSS

Results:380 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 380 ]  
 
2014-10-31 Director, BR   Global flight tracking for civil aviation     N/A  
[ 379 ]  
 
2014-10-30 WP 5D   Reply liaison statement to Working Party 4C (copy for information to Working Party 4B and Study Groups 4 and 5) - Revision of Recommendation ITU-R M.1036-4 and coexistence issues between the satellite and terrestrial components of IMT     N/A  
[ 378 ]  
 
2014-10-17 WP 7D   Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B 5C, 6A and ITU-T Study Group 15) - Considerations on the G.9700 power spectral densitiy (PSD) limit mask     N/A  
[ 377 ]  
 
2014-10-16 WP 7B   Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)     N/A  
[ 376 ]  
 
2014-10-16 WP 7C   Liaison statement to Working Party 4C regarding mitigation techniques between EESS (active) systems and RNSS systems in the frequency band 1 215-1 300 MHz     234/7  
[ 375 ]  
 
2014-10-15 International Maritime Organization   Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     N/A  
[ 374 ]  
 
2014-10-09 ITU-T SG 9   Liaison statement on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication     N/A  
[ 373 ]  
 
2014-09-30 ITU-T SG 9   Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)     N/A  
[ 372 ]  
 
2014-08-08 ITU-T WP 2/5   Liaison statement/R on current status on draft Recommendation ITU-T K.mhn and issues related to coexistence of wired telecommunications and radio communication (reply to Study Group 9 - LS56)     N/A  
[ 371 ]  
 
2014-08-07 ITU-T WP 2/5   LS/r on need for collaboration between ITU-R Working Party 4C and ITU-T Study Group 5, Working Party 2 (reply to ITU-R Working Party 4C, 4C/TEMP /126 LS5)     N/A  
[ 370 ]  
 
2014-07-07 WP 4B   Liaison statement to Working Party 5D (copy for information to Working Party 4C and Study Group 4) - Work progress on development of Handbook on Global Trends in IMT - ITU-R M.[IMT/HANDBOOK]     N/A  
[ 369 ]  
+Ann.1-18 
2014-07-02 Chairman, WP 4C   Report on the meeting of Working Party 4C (Geneva, 25 June - 1 July 2014)     N/A  
[ 368 ]  
 
2014-07-02 Director, BR   Final list of participants - Working Party 4C (Geneva, 25 June - 1 July 2014)     N/A  
[ 367 ]  
 
2014-06-24 BR Study Group Department   List of documents issued (Documents 4C/289 - 4C/367)     N/A  
[ 366 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems     N/A  
[ 365 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - ITU-R interest in K series Recommendations     N/A  
[ 364 ]  
 
2014-06-20 WP 1A   Liaison statement to the broadband forum (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Specifications and performance of cabling intended for use with G.fast     N/A  
[ 363 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D) - Considerations on the G.9700 power spectral density (PSD) limit mask     N/A  
[ 362 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Groups 5 and 15 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Excessive levels of radio frequency noise in the environment     N/A  
[ 361 ]  
 
2014-06-20 WP 1A   Liaison statement to ITU-T Study Group 15 and CENELEC (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A and 7D) - Ensuring that telecommunication systems that depend on the use of radio frequencies have been properly assessed for compatibility and the avoidance of harmful interference     N/A  
[ 360 ]  
 
2014-06-19 WP 1B   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     N/A  
[ 359 ]  
 
2014-06-19 WP 1A   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     N/A  
[ 358 ]  
 
2014-06-18 France   Annex 11 to Working Party 4C Chairman's Report - Working document - Draft CPM text on WRC-15 agenda item 1.10     N/A  
[ 357 ]  
 
2014-06-18 France   Proposed revision to Annex 9 to Working Party 4C Chairman's Report - Working document - Draft CPM text on WRC-15 agenda item 1.9.2 - Agenda 1.9.2     N/A  
[ 356 ]  
 
2014-06-18 France   Proposed revisions to Annex 5 to Working Party 4C Chairman's Report - Preliminary draft new Report ITU-R M.[AGENDA ITEM 9.1.1] - Protection of the 406-406.1 MHz band     N/A  
Results:380 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-10-31