International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4C : Meeting 2014-06-25 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R WP4C  TD (2014-06-25) 

ITU-R WP4C

Efficient Orbit/Spectrum Utilization for MSS and RDSS

Meeting  from 2014-06-25 to 2014-07-01

held in Switzerland [Geneva]

Results:35 total items.
Result page:  Previous -  1 - 2
Temporary Documents  Documents / Contributions
 
Number 
Received Source Title Questions
[ 132 ]  
 
2014-06-30 WP 4C   Reply liaison statement to Working Party 7C - Draft new Report ITU-R M.[RNSS_Multi_EESS] - Consideration of aggregate radio frequency interference (RFI) event potentials from multiple EESS systems on RNSS receivers operating in the 1 215-1 300 MHz frequency band     N/A  
[ 131 ]  
 
2014-06-30 WP 4C   Reply liaison statement to Working Party 7C - RNSS-related comments to preliminary draft new Report ITU-R RS.[MITIG_RNSS-EESS] - Pulsed radio frequency signal impact measurements and possible mitigation techniques between EESS (active) systems and RNSS systems and networks in the band 1 215-1 300 MHz     N/A  
[ 130 ]  
 
2014-06-30 WP 4C   Reply liaison statement to Working Party 7C - RNSS-related comments to preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH] - Evaluation method to determine compatibility between receiving earth stations in the radionavigation-satellite service (space to Earth) and spaceborne sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band     N/A  
[ 129 ]  
 
2014-06-30 WP 4C   Draft new Report ITU-R M.[TNSS_Multi_EESS] - Consideration of aggregate radio frequency interference (RFI) event potentials from multiple EESS systems on RNSS receivers operating in the 1 215-1 300 MHz frequency band     N/A  
[ 128 ]  
 
2014-06-27 WP 4C   Liaison statement to Working Parties 4A and 5C - WRC-15 agenda item 1.8     N/A  
[ 127 ]  
 
2014-06-27 WP 4C   Liaison statement to ITU-T Study Group 15 and ITU-R Working Party 1A - Considerations on the G.9700 power spectral density (PSD) limit mask     N/A  
[ 126 ]  
 
2014-06-27 WP 4C   Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Party 1A) - ITU-R interest in K series Recommendations     N/A  
[ 125 ]  
 
2014-06-27 WP 4C   Liaison statement to Working Party 1A - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     N/A  
[ 124 ]  
 
2014-06-27 WP 4C   Liaison statement to Working Party 1B - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     N/A  
[ 123 ]  
 
2014-06-27 WP 4C   Liaison statement to Working Party 5D (copy for information to Working Party 4B and Study Group 4) - Proposal on the revision of Recommendation ITU-R M.1036-4     N/A  
Results:35 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-09-10