International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4B  C 

ITU-R WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:162 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 112 ]  
 
2013-09-23 ITU-T SG 17   Liaison statement - Request to provide security contacts     N/A  
[ 111 ]  
 
2013-09-19 SG 1   Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain     N/A  
[ 110 ]  
 
2013-09-18 Japan   Working Document towards a preliminary draft new Report "Multi-dimensional signal mapping technique for satellite communications"     46-3/4  
[ 109 ]  
 
2013-09-18 Japan   Working Document towards a draft revision of Report ITU-R S.2173 - Multi-carrier based transmission techniques for satellite systems     46-3/4  
[ 108 ]  
 
2013-09-18 Japan   Working Document towards a preliminary draft new Recommendation ITU-R S.[DIGCID] - A carrier identification system for digital-modulation transmissions for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations in the 4-6 GHz and 11-12/13/14 GHz FSS bands to identify harmful interference     271/4  
[ 107 ]  
 
2013-09-18 Japan   Proposed modification to Working Document (for Working Party 4B for information purpose only) - Possible modification of Recommendation ITU-R S.1432-1 and development of long-term and short term interference criteria     N/A  
[ 106 ]  
 
2013-09-17 Korea (Republic of)   Proposed draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced)     N/A  
[ 105 ]  
 
2013-09-13 European Telecommunications Standards Institute   Liaison Statement to ITU-R WP 4B about "Terminology used for networks using both satellite and terrestrial links"     N/A  
[ 104 ]  
 
2013-07-25 WP 3L   Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event     N/A  
[ 103 ]  
 
2013-07-25 ITU-T SG 15   Liaison statements on new versions of the Access Network Transport (ANT) Standardization overview and Work plan     N/A  
[ 102 ]  
 
2013-07-22 WP 5D   Liaison statement to ITU-D Study Group 2 Question 25/2, ITU-T Study Group 13 Question 15/13, ITU-R Working Party 4B - Work progress on development of Handbook on "Global trends in IMT"     N/A  
[ 101 ]  
 
2013-07-05 WP 3K   Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528     233/3  
[ 100 ]  
 
2013-07-01 WP 3M   Liaison statement to Working Parties 4B and 5B on airborne propagation - WRC-15 agenda item 1.5     N/A  
[ 99 ]  
 
2013-06-13 ITU-T FG DR&NRR   Liaison statement to ITU-R Working Party 4B - Information about the use of FSS systems in disaster response and relief     N/A  
[ 98 ]  
 
2013-06-04 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1     N/A  
[ 97 ]  
 
2013-05-23 ITU-T JCA-AHF   Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]     N/A  
[ 96 ]  
 
2013-05-17 WP 3M   Liaison statement to Working Parties 4B and 5B - Guidance on the application of recommendations on radio wave propagation to unmanned aircraft systems (WRC-15 agenda item 1.5)     N/A  
[ 95 ]  
 
2013-05-14 ITU-T JCA-AHF   Liaison statement on nomination of JCA-AHF representatives     N/A  
[ 94 ]  
+Ann.1-11 
2013-05-03 Chairman, WP 4B   Report on the thirty-fourth meeting of Working Party 4B (Geneva, 29 April - 3 May 2013)     N/A  
[ 93 ]  
 
2013-05-03 Director, BR   Final list of participants - Working Party 4B (29 April - 3 May 2013)     N/A  
[ 92 ]  
 
2013-05-01 ITU-D SG 2   Liaison Statement from ITU-D Question 22-1/2 to ITU-T SGs 5 and 15, ITU-T FG on DR&NRR and ITU-R Working Party 4B     N/A  
[ 91 ]  
 
2013-04-26 BR Study Groups Department   List of documents issued (Documents 4B/55 - 4B/91)     N/A  
[ 90 ]  
 
2013-04-19 United States of America   [Draft] new Recommendation ITU-R S.[GENACC] - Access procedures for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations in the 4/6 GHz and 11-12/13/14 GHz FSS bands     N/A  
[ 89 ]  
 
2013-04-19 United States of America   Preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     N/A  
[ 88 ]  
 
2013-04-22 United Kingdom of Great Britain and Northern Ireland   WRC-15 Agenda item 1.5 - Working document on the assessment of the availability achieved by typical FSS links in the 17.3 - 20.2 GHz and 27.5 - 30.0 GHz bands     N/A  
Results:162 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-07-22