International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A-AR  C 

ITU-R WP4A-AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:456 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 131 ]  
 
2013-04-25 Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3     N/A  
[ 130 ]  
 
2013-04-25 North American Broadcasters Association (NABA)   US broadcasters'submission in response to the FCC's notice of proposed rule making concerning the amendment of the Commission's rules with regard to commercial operations in the 3 550-3 650 MHz band     N/A  
[ 129 ]  
 
2013-04-24 Canada   Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7     N/A  
[ 128 ]  
 
2013-04-24 Canada   Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)     N/A  
[ 127 ]  
 
2013-04-24 Canada   Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7     N/A  
[ 126 ]  
 
2013-04-24 United States of America   Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     N/A  
[ 125 ]  
 
2013-04-25 United States of America   Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     N/A  
[ 124 ]  
 
2013-04-25 United States of America   Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz     N/A  
[ 123 ]  
 
2013-04-25 United States of America   Working document - Technical and operational studies towrads the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satelliote orbit fixed-satellite service     N/A  
[ 122 ]  
 
2013-04-25 United States of America   Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz     N/A  
[ 121 ]  
 
2013-04-24 France   Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range     N/A  
[ 120 ]  
 
2013-04-24 France   Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz     N/A  
[ 119 ]  
 
2013-04-24 France   Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     N/A  
[ 118 ]  
 
2013-04-24 France   Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     N/A  
[ 117 ]  
 
2013-04-24 France   Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz     N/A  
[ 116 ]  
 
2013-04-24 United States of America   Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations     N/A  
[ 115 ]  
 
2013-04-24 United States of America   Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7     N/A  
[ 114 ]  
 
2013-04-24 United States of America   Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics     N/A  
[ 113 ]  
 
2013-04-24 United States of America   Modifications to Recommendation ITU-R S.1503-1     N/A  
[ 112 ]  
 
2013-04-24 United States of America   Draft liaison statement to Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     N/A  
[ 111 ]  
 
2013-04-24 United States of America   Working document towards a preliminary draft new Recommendation on a possible methodology for frequency sharing between fixed-satellite service networks comprising ubiquitously deployed earth stations and terrestrial services in adjacent areas     N/A  
[ 110 ]  
 
2013-04-24 United States of America   Working document towards a Preliminary Draft New Recommendation ITU-R S.[Non-GSO MSS Feeder Links 19.3-19.7 GHz/29.1-29.5 GHz] - Protection of non-GSO MSS Feeder Link in the Bands 19.3-19.7 GHz and 29.1-29.5 GHz from FSS geostationary satellite orbit networks using earth stations on mobile platforms (ESOMPS)     N/A  
[ 109 ]  
 
2013-04-24 United States of America   Further discussions on the Working Document towards a Preliminary Draft New Recommendation ITU-R S.[ALT.RAD.PTTRN]     N/A  
[ 108 ]  
 
2013-04-24 United States of America   Working document - Draft CPM text related to Agenda item 9.1.2 -Size of the coordination arc for triggering coordination under RR No.9.7 between geostationary-satellite networks     N/A  
[ 107 ]  
 
2013-04-24 United States of America   Working Document addressing consequences for late notification under RR No.11.49     N/A  
[ 106 ]  
 
2013-04-24 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     N/A  
[ 105 ]  
 
2013-04-24 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz range for the GSO fixed-satellite service in Region 1     N/A  
[ 104 ]  
 
2013-04-24 United States of America   Working document on a framework for a Preliminary Draft New Recommendation for control and non-payload communication (CNPC) links of unmanned aircraft systems (UAS) in non segregated airspace     N/A  
[ 103 ]  
 
2013-04-24 United States of America   Liaison statement to Working Party 5B - Clarification of BR comment on FSS assignments - WRC-15 Agenda item 1.5     N/A  
[ 102 ]  
 
2013-04-24 United States of America   Proposed updates to working deocument towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     N/A  
[ 101 ]  
 
2013-04-24 United States of America   Agenda Item 1.6 FSS deployment model     N/A  
[ 100 ]  
 
2013-04-22 Russian Federation   WRC-15 Agenda item 1.6.1 - Estimation of probability of harmful interference to FS terrestrial stations from geostationary FSS satellites, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1     N/A  
[ 99 ]  
 
2013-04-22 Russian Federation   WRC-15 Agenda item 1.6.1 - Estimation of interference to receiving FSS earth stations from emissions of a single transmitting FS terrestrial station, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1     N/A  
[ 98 ]  
 
2013-04-22 Russian Federation   Draft liaison statement to ITU-R Working Party of the Special Committee - WRC-15 Agenda item 7     N/A  
[ 97 ]  
 
2013-04-22 Russian Federation   Working document - Proposal to draft liaison statement to Working Party 5C - WRC-15 Agenda item 1.8 - To review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with Reslution 909 (WRC-12)     N/A  
[ 96 ]  
 
2013-04-22 Russian Federation   Draft new Report "Assessment of the orbital-frequency resource occupied by a geostationary satellite communication system"     N/A  
[ 95 ]  
 
2013-04-22 Russian Federation   Workind document - On the revision of the ITU-R Recommendations establishing the value of the criterion of the permissible interference between GSO satellite systems     N/A  
[ 94 ]  
 
2013-04-22 Russian Federation   Working Document - Criterion for coordination necessity between FSS and BSS GSO networks sharing frequency bands 4/6, 11/12/13/14 and 20/30/40GHz     N/A  
[ 93 ]  
 
2013-04-22 Russian Federation   WRC-15 Agenda item 1.6.1 - Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary FSS under additional primary allocation to FSS (space-to-Earth) in frequency band 10.0-10.68 GHz in Region 1     N/A  
[ 92 ]  
 
2013-04-22 Russian Federation   Working Document - Revision of the ITU-R Recommendation S.1432     N/A  
[ 91 ]  
 
2013-04-22 Russian Federation   Proposals for modification of working document towards preliminary draft new Report ITU-R [FSS 7/8 GHz COMPATIBILITY]     N/A  
[ 90 ]  
 
2013-04-22 Russian Federation   Feasibility estimation for sharing between fixed satellite service (space-to-Earth) and fixed service in the frequency band 14.5-15.35 GHz     N/A  
[ 89 ]  
 
2013-04-22 Russian Federation   Assessment of sharing feasibility of the fixed satellite service (space-to-Earth) in the frequency band 10.0-10.6 GHz with the radio astronomy service in the frequency range 10.6-10.7 GHz     N/A  
[ 88 ]  
 
2013-04-22 Russian Federation   Assesment of sharing feasibility of the fixed satellite service (space-to-Earth) with the mobile service in the frequency band 14.5-15.35 GHz     N/A  
[ 87 ]  
 
2013-04-22 Russian Federation   Working Document - Proposal to the revision fo the Document (Annex 11 to Doc. 4A/125) "Some elements of a working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations"     N/A  
[ 86 ]  
 
2013-04-22 Iran (Islamic Republic of)   Liaison statement to JTG 4-5-6-7 on Agenda item 1.1     N/A  
[ 85 ]  
 
2013-04-22 Iran (Islamic Republic of)   Simplification of Radio Regulation Regime on Space Services - WRC-15 Agenda item 7     N/A  
[ 84 ]  
 
2013-04-22 Iran (Islamic Republic of)   Comments on Annex 11 to Working Party 4A Chairman's Report (Document 4A/125) - WRC-15 Agenda item 1.8 - Earth Stations on Board Vessels (ESVS)     N/A  
[ 83 ]  
 
2013-04-22 Iran (Islamic Republic of)   Working document on preliminary outline for draft CPM text on WRC-15 Agenda item 1.8     N/A  
[ 82 ]  
 
2013-04-18 Japan   Draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     N/A  
Results:456 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-06-11