International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:591 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 541 ]  
 
2014-06-23 United States of America   Preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] - Possible methodology for frequency sharing between ubiquitously deployed earth stations of the fixed-satellite service and stations of the terrestrial services in adjacent areas for sharing situations described in Appendix 7 of the Radio Regulations     N/A  
[ 540 ]  
 
2014-06-23 United States of America   Review of the Inter-regional sharing provisions contained in Annex 7 to Appendix 30     N/A  
[ 539 ]  
 
2014-06-23 United States of America   Review of the situation surrounding bringing into use and notification of frequency assignments     N/A  
[ 538 ]  
 
2014-06-23 United States of America   Proposal for modification of draft CPM text for WRC-15 agenda item 9.1.3     N/A  
[ 537 ]  
 
2014-06-23 United States of America   Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHZ COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     N/A  
[ 536 ]  
 
2014-06-23 United States of America   Interference for FSS GSO satellites to SRS spacecraft in the 7 150-7 235 MHz band using a modified E.I.R.P. spectral density mask - WRC-15 agenda item 1.9.1     N/A  
[ 535 ]  
 
2014-06-23 United States of America   Proposed revision of working document - Draft CPM text on WRC-15 agenda item 1.9.1     N/A  
[ 534 ]  
 
2014-06-23 United States of America   Proposed modifications to the working document draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2     N/A  
[ 533 ]  
 
2014-06-23 United States of America   Further considerations of issue [G] - Failure of a [newly launched] satellite during the ninety-day bringing into use period     N/A  
[ 532 ]  
 
2014-06-23 United States of America   Draft CPM text on WRC-15 agenda item 7, issue D - Possible methods to mitigate excessive filings     N/A  
[ 531 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda item 7 - Informing the BR of a suspension under RR No. 11.49 beyond six months (Issue A)     N/A  
[ 530 ]  
 
2014-06-23 United States of America   Draft CPM text on WRC-15 agenda item 1.8     N/A  
[ 529 ]  
 
2014-06-23 United States of America   Working document - Draft CPM text on WRC-15 agenda item 1.7     N/A  
[ 528 ]  
 
2014-06-23 United States of America   Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 2, Region 3     N/A  
[ 527 ]  
 
2014-06-23 United States of America   Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1     N/A  
[ 526 ]  
 
2014-06-23 United States of America   EESS (active), aeronautical navigation and FSS (E-s) sharing study for the 13.25-13.75 GHz band     N/A  
[ 525 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2: 13.25-13.75 GHz     N/A  
[ 524 ]  
 
2014-06-23 United States of America   FSS distribution model     N/A  
[ 523 ]  
 
2014-06-23 United States of America   Working document - Draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2     N/A  
[ 522 ]  
 
2014-06-23 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     N/A  
[ 521 ]  
 
2014-06-23 United States of America   Revision of preliminary draft new Report ITU-R S.[R2R3.FSS]     N/A  
[ 520 ]  
 
2014-06-23 United States of America   Revisions to Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - WRC-15 agenda item 1.6     N/A  
[ 519 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2     N/A  
[ 518 ]  
 
2014-06-23 Director, BR   Use of linear polarization for Article 4 networks in Region 2     N/A  
[ 517 ]  
 
2014-06-23 International Civil Aviation Organization   Proposed modifications to the draft CPM text on WRC-15 agenda item 9.1, issue 9.1.5     N/A  
Results:591 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-08-11