International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 256 ]  
 
2013-07-17 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments      
[ 255 ]  
 
2013-07-05 WP 3K   Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528     233/3  
[ 254 ]  
 
2013-06-21 WP 1B   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities      
[ 253 ]  
 
2013-06-21 WP 1B   Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station      
[ 252 ]  
 
2013-06-12 WP 5B   Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 agenda item 1.10      
[ 251 ]  
 
2013-06-12 WP 5B   Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6      
[ 250 ]  
 
2013-06-05 WP 5C   Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.8      
[ 249 ]  
 
2013-06-05 WP 5C   Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1      
[ 248 ]  
 
2013-06-05 WP 5C   Liaison statement to Working Party 4A - WRC-15 agenda item 1.6      
[ 247 ]  
 
2013-06-05 WP 5C   Liaisons statement to Working Party 4A - Proposed suppression of certain SF-series Recommendations      
[ 246 ]  
 
2013-06-05 WP 5A   Liaison statement to Working Party 4A - WRC-15 agenda item 1.6      
[ 245 ]  
 
2013-06-04 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1      
[ 244 ]  
 
2013-05-23 ITU-T JCA-AHF   Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]      
[ 243 ]  
 
2013-05-14 ITU-T JCA-AHF   Liaison statement on nomination of JCA-AHF representatives      
[ 242 ]  
+Ann.1-36 
2013-05-10 Chairman, WP 4A   Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)      
[ 241 ]  
 
2013-05-10 Director, BR   Final list of participants - Working Party 4A (Geneva, 2-10 May 2013)      
[ 240 ]  
 
2013-05-06 Director, BR   Clarification to the survey of status of FSS assignments in the MIFR in the 10.95-30.0 GHz bands (WRC-15 Agenda item 1.5)      
[ 239 ]  
 
2013-05-03 WP 4B   Liaison Statement to Working Party 4A - [Preliminary] draft new Report ITU-R S.[VSAT]      
[ 238 ]  
 
2013-05-03 WP 4B   Reply liaison statement to Working Party 5B (copy for information to Working Party 4A) - WRC-15 Agenda item 1.5      
[ 237 ]  
 
2013-05-01 Br Study Groups Department   List of documents issued (Documents 4A/125 - 4A/237)      
[ 236 ]  
 
2013-04-25 Luxembourg   Working document - Examination under § 2.2 of Annex 4 of Appendix 30B      
[ 235 ]  
 
2013-04-25 Luxembourg   Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)      
[ 234 ]  
 
2013-04-25 Intelsat, LLC   WRC-15 Agenda item 1.6.1/1.6.2: Consideration of the band 14.5 - 14.8 GHz      
[ 233 ]  
 
2013-04-24 North American Broadcasters Association (NABA)   US broadcasters'submission in response to the FCC's notice of proposed rule making concerning the amendment of the Commission's rules with regard to commercial operations in the 3 550-3 650 MHz band      
[ 232 ]  
 
2013-04-25 Telenor ASA   Technical criteria used in application of RR No.9.41 in respect of coordination under RR No.9.7      
[ 231 ]  
 
2013-04-25 United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Norway   Initial evaluation of the 8 degree coordination arc between geostationary fixed-satellite service networks in 17.7-20.2 GHz and 27.5-30 GHz      
[ 230 ]  
 
2013-04-25 United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway   Working document towards a preliminary draft new Recommendation ITU-R S.[GSO E/S IN 29.5-30.0//19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7 - 20.2 GHz and 29.5 - 30.0 GHz      
[ 229 ]  
 
2013-04-25 United Kingdom of Great Britain and Northern Ireland   Proposed changes to draft revision of Recommendation ITU-R S.1503-1      
[ 228 ]  
 
2013-04-25 International Civil Aviation Organization   Working document towards draft CPM text on WRC-15 Agenda item 9.1.5      
[ 227 ]  
 
2013-04-25 Germany (Federal Republic of)   Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of typical satellite communication links for potential use by UA Control and non-payload communication (CNPC) Agenda Item 1.5 (WRC15)      
[ 226 ]  
 
2013-04-25 Germany (Federal Republic of)   Protection criterion for FSS in sharing studies related to Agenda item 1.5      
[ 225 ]  
 
2013-04-25 Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   Proposal for liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Suitable frequency ranges for IMT above 6 GHz      
[ 224 ]  
 
2013-04-25 Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   Proposal for liaison statement to ITU-R Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments      
[ 223 ]  
 
2013-04-25 Asia Satellite Telecommunications Co. Ltd. (AsiaSat)   Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3      
[ 222 ]  
 
2013-04-25 United States of America   Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services      
[ 221 ]  
 
2013-04-25 United States of America   Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services      
[ 220 ]  
 
2013-04-25 United States of America   Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz      
[ 219 ]  
 
2013-04-25 United States of America   Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service      
[ 218 ]  
 
2013-04-25 United States of America   Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz      
[ 217 ]  
 
2013-04-24 Canada   Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7      
[ 216 ]  
 
2013-04-24 Canada   Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)      
[ 215 ]  
 
2013-04-24 Canada   Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7      
[ 214 ]  
 
2013-04-24 France   Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz      
[ 213 ]  
 
2013-04-24 France   Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range      
[ 212 ]  
 
2013-04-24 France   Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range      
[ 211 ]  
 
2013-04-24 France   Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range      
[ 210 ]  
 
2013-04-24 France   Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz      
[ 209 ]  
 
2013-04-24 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3      
[ 208 ]  
 
2013-04-24 United States of America   Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7      
[ 207 ]  
 
2013-04-24 United States of America   Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics      
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16