Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 681 ]
|
Question ITU-R 1-6/5 - Interference protection ratios and minimum field strengths required in the land mobile services
|
SG 5
|
|
2015-10-23 |
|
[ 680 ]
|
Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain
|
SG 1
|
|
2015-10-12 |
|
[ 679 ]
|
Recommendation ITU-R F.758-6 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
|
SG 5
|
|
2015-10-12 |
|
[ 678 ]
|
Liaison statement on real-time transmission of flight data in the context of global flight tracking
|
Chairman, ITU-T (FG AC)
|
|
2015-09-02 |
|
[ 677 ]
|
Liaison statement to Working Party 4A (copied for information Working Parties 5C and 5D) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]
|
WP 5A
|
|
2015-08-26 |
|
[ 676 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]
|
WP 5A
|
|
2015-08-26 |
|
[ 675 ]
|
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732
|
WP 5A
|
|
2015-08-26 |
|
[ 674 ]
|
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy for information to ETSI ATTM TM4, CEPT ECC PT SE19) - Development of draft revision of Recommendation ITU-R F.758-5 and a draft new Recommendation ITU-R F.[FS DEPLOY] - Recommendations on sharing or compatibility studies between the fixed service and systems in other services
|
WP 5C
|
|
2015-08-25 |
|
[ 673 ]
|
Reply liaison statement to Working Party 4A - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERFERF.AREA]
|
WP 5C
|
|
2015-08-25 |
|
[ 672 ]
|
Reply liaison statement to ITU-T Focus Group on aviation applications of cloud computing for flight data monitoring (copy to Working Party 4A, 4C ITU Inter-Sector Coordination Team)
|
WP 5B
|
|
2015-07-23 |
|
[ 671 ]
|
Reply liaison statement to Working Party 4A, Study Group 4 and Study Group 5 - WRC-15 agenda item 1.8
|
WP 5C
|
|
2015-07-16 |
|
[ 670 ]
|
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5C
|
|
2015-07-16 |
|
[ 669 ]
+Ann.1-16 |
Report on the meeting of Working Party 4A - (Geneva, 17 - 25 June 2015)
|
Chairman, WP 4A
|
|
2015-06-25 |
|
[ 668 ]
|
Final list of participants - Working Party 4A (Geneva, 17-25 June 2015)
|
Director, BR
|
|
2015-06-25 |
|
[ 667 ]
|
Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
|
WP 4C
|
|
2015-06-23 |
|
[ 666 ]
|
Liaison statement to Working Party 4A - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
|
WP 5D
|
|
2015-06-19 |
|
[ 665 ]
|
Liaison statement to ITU-R Working Party 4A - Preliminary draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
|
WP 4B
|
|
2015-06-19 |
|
[ 664 ]
|
List of documents issued (Documents 4A/591 - 4A/664)
|
BR Study Groups Department
|
|
2015-06-16 |
|
[ 663 ]
|
Liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C, 7C and 7D) - Technology trends of active services in the band above 275 GHz
|
WP 1A
|
|
2015-06-15 |
|
[ 662 ]
|
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7B and 7D - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities
|
WP 1B
|
|
2015-06-11 |
|
[ 661 ]
|
WRC-15 agenda item 1.8 - working document towards a preliminary draft new Report ITU-R S.[ESV] - Interference effect of transmissions from earth stations on board vessels operating in the FSS networks on terrestrial co-frequency stations
|
United Kingdom of Great Britain and Northern Ireland
|
|
2015-06-10 |
|
[ 660 ]
|
Proposed revisions to the working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S 29.5-30.0/19.7-20.2 GHz] - Technical and operational guidelines for earth stations on moving platforms communicating with geostationary space stations in the fixed-satellite service in the frequency bands 19.7-20.2 GHz and 29.5-30.0 GHz
|
France
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
|
|
2015-06-10 |
|
[ 659 ]
|
Clarification note on FSS sharing with MS-AMS (CPM15-2 Report, Section 4.1/1.6.1/4.6.3)
|
Italy
|
|
2015-06-10 |
|
[ 658 ]
|
Proposal for modification to the preliminary draft new Report ITU-R S.[R1.FSS] - WRC-15 agenda item 1.6
|
Italy
|
|
2015-06-10 |
|
[ 657 ]
|
Considerations on scenario to be use in the studies - WRC-15 agenda item 1.8
|
France
|
|
2015-06-10 |
Results:681 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):