International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:196 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 96 ]  
 
2013-09-30 WP 4C   Liaison statement to Working Party 1B - WRC-15 agenda item 9.1, issue 9.1.6     N/A  
[ 95 ]  
 
2013-09-30 WP 4C   Liaison statement to Working Party 1B - Working Document towards a preliminary draft new Report ITU-R SM. [WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     N/A  
[ 94 ]  
 
2013-09-10 Chairman, CPM-15   Information on the preparation of texts for the draft CPM Report to WRC-15     N/A  
[ 93 ]  
 
2013-07-17 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     N/A  
[ 92 ]  
+Ann.1-14 
2013-06-11 Chairman, WP 1B   Report on the meeting of Working Party 1B (Geneva, 4-11 June 2013)     N/A  
[ 91 ]  
 
2013-06-11 Director, BR   Final list of participants - Working Party 1B (Geneva, 4-11 June 2013)     N/A  
[ 90 ]  
(Rev.1) 
2013-06-10 Chairman, WP 1A   Note from the Chairman of Working Party 1A to the Chairman of Working Party 1B on Correspondence Group (CG-WPT) on developing content for possible preliminary draft new Report and Recommendation on WPT     N/A  
[ 89 ]  
(Rev.1) 
2013-06-06 Chairman, WP 1A   Note from the Chairman of Working Party 1A to the Chairman of Working Party 1C - On Cognitive Radio Systems - Scope of spectrum engineering aspects to be included in a future ITU-R Report     N/A  
[ 88 ]  
 
2013-06-04 Chairman, SG 1   Conclusions from the Joint meeting of Working Parties 1A, 1B AND 1C (Tuesday, 4 June 2013)     N/A  
[ 87 ]  
 
2013-06-03 BR Study Groups Department   List of documents issued (Documents 1B/42 - 1B/87)     N/A  
[ 86 ]  
 
2013-06-03 WP 5A   Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     N/A  
[ 85 ]  
 
2013-05-30 Chairman, SG 1   Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)     N/A  
[ 84 ]  
 
2013-05-28 Canada   Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management"     N/A  
[ 83 ]  
 
2013-05-28 Canada   WRC-15 Agenda item 9.2 - Working document on issues for consideration under the Director's Report     N/A  
[ 82 ]  
 
2013-05-28 Canada   Proposed working document towards a preliminary draft new Report ITU-R SM.[WHITE SPACE] - Spectrum management principles and techniques for the use of white spaces by radio systems employing cognitive capabilities     N/A  
[ 81 ]  
 
2013-05-28 Ukraine   Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events     N/A  
[ 80 ]  
 
2013-05-28 European Communications Office   EFIS presentation     N/A  
[ 79 ]  
 
2013-05-28 United Kingdom of Great Britain and Northern Ireland   Preliminary draft revision of Recommendation ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD)     N/A  
[ 78 ]  
 
2013-05-28 China (People's Republic of)   Draft revision to the content of the preliminary draft new Report ITU-R SM.[RES. 957] on enhancing the international regulatory framework in relation to Resolution 951 (Rev.WRC-07) which may be relevant to studies on WRC-15 Agenda item 9.1.6 - Studies towards review of the definitions of fixed service, fixed station and mobile station     N/A  
[ 77 ]  
 
2013-05-28 China (People's Republic of)   Preliminary draft revision of Report ITU-R SM.2012-3 (2010) 'Economic aspects of spectrum management'     N/A  
[ 76 ]  
 
2013-05-28 Korea (Republic of)   Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 1 (Spectrum Management Fundamentals) and Annex 1 (Spectrum Management Training)"     N/A  
[ 75 ]  
 
2013-05-28 Korea (Republic of)   Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 6 (Spectrum Economics)"     N/A  
[ 74 ]  
 
2013-05-28 Korea (Republic of)   Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 5 (Spectrum Engineering Practices)"     N/A  
[ 73 ]  
 
2013-05-28 Rapp. RG WP 1B rev. ITU H'book on "N.S.M."   Report of the activities of the Rapporteur Group     N/A  
[ 72 ]  
(Rev.1) 
2013-05-27 Colombia (Republic of)   Presentation of the Spectrum Management Handbook developed by the Administration of Colombia     N/A  
Results:196 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-11