International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum Engineering Techniques

Results:190 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 115 ]  
 
2013-10-11 International Special Committee on Radio Interference   Reply to Working Party 1A liaison statement on study on Question ITU-R 210-3/1 "Wireless power transmission"     N/A  
[ 114 ]  
 
2013-10-10 WP 4A   Liaison statement to Working Party 5D (copy to Joint Task Group 4-5-6-7 and Working Party 1A) - Start of work towards two preliminary draft new Recommendations ITU-R M.[IMT.OOBE.X] on generic unwanted emission characteristics of base stations and mobile stations using the terrestrial radio interfaces of IMT-Advanced     N/A  
[ 113 ]  
 
2013-10-09 Director, BR   CISPR letter on the use of the band 8.3-9 KHz     N/A  
[ 112 ]  
 
2013-10-03 ITU-T JCA-AHF   Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110)     N/A  
[ 111 ]  
 
2013-10-03 ITU-T JCA-AHF   Liaison statement on draft revision of Recommendation ITU-R M.1076     N/A  
[ 110 ]  
 
2013-09-30 WP 7D   Liaison statement to Working Party 1A - Coexistence of wired telecommunication (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T     N/A  
[ 109 ]  
 
2013-08-05 JTG 4-5-6-7   Liaison statement to Working Party 5D (copy for information to WPs 1A and 6A) - Adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 agenda item 1.2     N/A  
[ 108 ]  
 
2013-07-24 ITU-T SG 15   Liaison statement on determination of the ITU-T G.fast PSD specification     N/A  
[ 107 ]  
 
2013-07-17 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     N/A  
[ 106 ]  
 
2013-07-01 WP 3L   Liaison statement to Working Party 1A - Noise characteristics of PLT devices     N/A  
[ 105 ]  
+Ann.1-17 
2013-06-11 Chairman, WP 1A   Report on the meeting of Working Party 1A (Geneva, 4-11 June 2013)     N/A  
[ 104 ]  
 
2013-06-11 Director, BR   Final list of participants - Working Party 1A (Geneva, 4-11 June 2013)     N/A  
[ 103 ]  
 
2013-06-04 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1     N/A  
[ 102 ]  
 
2013-06-04 Chairman, SG 1   Information from CISPR on Question ITU-R 210-3/1     N/A  
[ 101 ]  
 
2013-06-03 BR Study Groups Department   List of documents issued (Documents 1A/39 - 1A/101)     N/A  
[ 100 ]  
 
2013-06-03 WP 5A   Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     N/A  
[ 99 ]  
 
2013-05-31 WPs 5A, 5B and 5C   Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5 & 9 (copy to ITU-R Working Parties 1C and 5D for information) - Coexistence of wired and wireless communications systems - Revision of Recommendation ITU-T K.60     N/A  
[ 98 ]  
 
2013-05-31 WPs 5A, 5B and 5C   Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems     N/A  
[ 97 ]  
 
2013-05-31 WPs 5A, 5B and 5C   Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST     N/A  
[ 96 ]  
 
2013-05-30 Chairman, SG 1   Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)     N/A  
[ 95 ]  
 
2013-05-28 European Broadcasting Union   Comments on ITU-T Recommendations K.60 and K.MHN as a response to the liaison statement from ITU-T SG5 in Document 1A/67 and its Addendum 1     N/A  
[ 94 ]  
 
2013-05-28 European Broadcasting Union   Comments on Annex 3 to Document 1A/39 (Working document towards a PDN Report ITU-R SM.[SMART_GRID])     N/A  
[ 93 ]  
 
2013-05-28 China (People's Republic of)   Information paper - Wireless power transmission     210-3/1  
[ 92 ]  
 
2013-05-28 IEEE   Working document towards a PDN Report ITU-R SM.[SMART_GRID] - Smart grid power management systems     236/1  
[ 91 ]  
 
2013-05-28 Korea (Republic of)   Improvement on working document towards a preliminary draft new Report ITU-R SM.[PLT RAD-PSD] - Methodologies for relating the radiation from PLT installations to PLT modem output     N/A  
Results:190 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-17