International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG01  C 

ITU-R SG01

Spectrum Management

Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 151 ]  
(Rev.1) 
2015-06-09 WP 1B   Draft modification of Report ITU-R SM.2153-4 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     N/A  
[ 150 ]  
(Rev.1) 
2015-06-09 WP 1A   Editorial modifications of Recommendation ITU-R SM.326-7 - Determination and measurement of the power of amplitude-modulated radio transmitters     N/A  
[ 149 ]  
(Rev.1) 
2015-06-09 WP 1A   Editorial modifications of Recommendation ITU-R SM.331-4 - Noise and sensitivity of receivers     N/A  
[ 148 ]  
(Rev.1) 
2015-06-09 WP 1A   Draft modification of Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain     N/A  
[ 147 ]  
(Rev.1) 
2015-06-09 WP 1A   Report ITU-R SM.2352-0 - Technology trends of active services in the frequency range 275-3 000 GHz     N/A  
[ 146 ]  
(Rev.1) 
2015-06-09 WP 1A   Report ITU-R SM.2351-0 - Smart grid utility management systems     N/A  
[ 145 ]  
(Rev.1) 
2015-06-09 WP 1C   Draft modification of Recommendation ITU-R SM.1600-1 - Technical identification of digital signals     N/A  
[ 144 ]  
(Rev.1) 
2015-06-09 WP 1C   Draft modification of Recommendation ITU-R SM.1880-0 - Spectrum occupancy measurement     N/A  
[ 143 ]  
(Rev.1) 
2015-06-09 WP 1C   Modification of Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events     N/A  
[ 142 ]  
(Rev.2) 
2015-06-03 WP 1B   Draft actions proposed to RA-15 on the ITU-R Resolutions of concern to Study Group 1     N/A  
[ 141 ]  
(Rev.1) 
2015-06-03 Chairman, SG 1   Preliminary draft of the Study Group 1 Chairman's Report to RA-15 - Spectrum management     N/A  
[ 140 ]  
 
2015-05-21 Israel (State of)   RF Human hazards - ITU Intersectoral activities     N/A  
[ 139 ]  
 
2015-05-14 ITU-D SG 1   Liaison statement on case studies for utilization of TV white space (TVWS) - ITU-D Study Group 1 - Joint ITU-D/ITU-R Group on Resolution 9: Participation of countries, particularly developing countries, in spectrum management     N/A  
[ 138 ]  
 
2015-04-14 ITU-T SG 3   Liaison statement on Economic Aspects of Spectrum Management     N/A  
[ 137 ]  
 
2015-03-17 SG 5   Recommendation ITU-R M.2070 - Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-Advanced     N/A  
[ 136 ]  
 
2015-03-17 SG 5   Recommendation ITU-R M.2071 - Generic unwanted emission characteristics of mobile stations using the terrestrial radio interfaces of IMT-Advanced     N/A  
[ 135 ]  
 
2015-03-16 WP 6A   Liaison statement to ITU-D / ITU-R Joint Group for Resolution 9 (copy to ITU-R Study Group 1) - Dynamic spectrum access     N/A  
[ 134 ]  
 
2015-03-12 Director, BR   Liaison statement on ITU-R Study Groups of interest to ITU-T Study Groups     N/A  
[ 133 ]  
 
2015-03-03 WP 6A   Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     N/A  
[ 132 ]  
(Rev.1) 
2015-02-25 SG 6   Liaison statement to Study Group 1 - Copy to Study Groups 5 and 7, ITU-D Study Group 2 and ITU-T Study Group 15     N/A  
[ 131 ]  
 
2015-02-11 ITU-T SG 5   Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"     N/A  
[ 130 ]  
 
2015-02-10 ITU-T SG 5   Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)     N/A  
[ 129 ]  
 
2015-02-06 Chairman, SG 1   Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)     N/A  
[ 128 ]  
 
2015-01-08 ITU-D SG 1   Liaison statement from ITU-D Study Group 1 Question 8/1 to ITU R SG 1 WP 1B, ITU-R SG 5 WP 5D, ITU-R SG 6 WP 6A, ITU-T SG 9, ITU-T SG 16 on ITU-D work on transition from analogue to digital broadcasting 2014-1017     N/A  
[ 127 ]  
 
2015-01-08 ITU-D SG 1   Liaison statement from ITU-D/ITU-R Joint Group for Resolution 9 to ITU-R SG 1, ITU-R SG 5, ITU-R SG 6 and their relevant Working Parties on work items during the 2014-2017 study period     N/A  
Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-06-26