International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : JTG4567 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R JTG4567  C 

ITU-R JTG4567

Joint Task Group 4-5-6-7

Results:715 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 590 ]  
 
Reply liaison statement to ITU-R Joint Task Group 4-5-6-7 (copy for information to Working Party 5A) - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency bands 5 350-5 470 and/or 5 725-5 850 MHz bay WAS/RLANS     WP 5B   2014-05-30
[ 589 ]  
 
Guidance for the preparation of concise draft CPM texts for WRC-15 agenda item 1.1 and 1.2     Chairman, JTG 4-5-6-7   2014-05-22
[ 588 ]  
 
Arrangements for the final meeting of Joint Task Group 4-5-6-7     Chairman, JTG 4-5-6-7   2014-05-21
[ 587 ]  
 
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2     United Kingdom of Great Britain and Northern Ireland   2014-05-16
[ 586 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy Working Party 5A) - Reply to the Joint Task Group 4-5-6-7 liaison statement on potential mitigation techniques for RLAN interference to EESS (active) in the band 5 350-5 470 MHz     WP 7C   2014-05-15
[ 585 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World Meteorological Organization   2014-04-28
[ 584 ]  
+Ann.1-12 
Report on the meeting of Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)     Chairman, JTG 4-5-6-7   2014-03-07
[ 583 ]  
 
Final list of participants - Joint Task Group 4-5-6-7 (Geneva, 20-28 February 2014)     Director, BR   2014-02-28
[ 582 ]  
 
List of documents issued (Documents 4-5-6-7/393 - 4-5-6-7/582)     BR Study Groups Department   2014-02-19
[ 581 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational parameters of BSS (sound) systems in the 1 452-1 492 MHz frequency band to be taken into account for compatibility studies under WRC-15 agenda item 1.1     WP 4A   2014-02-17
[ 580 ]  
 
Progress Report to Joint Task Group 4-5-6-7     Chairman, RG to develop solutions for SAB/SAP   2014-02-17
[ 579 ]  
 
Further calculations related to IMT UE OOB emission limits required to protect DTTB reception     European Broadcasting Union   2014-02-13
[ 578 ]  
 
Critical assessment of and comments on a study provided in Document 4-5-6-7/416     Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen   2014-02-13
[ 577 ]  
 
Reduced ACLR of LTE UE - The side effect of high efficiency UE power amplifiers     Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen   2014-02-13
[ 576 ]  
 
Revision of the working document (agenda item 1.2) - Integration of the postprocessing into IP calculations     Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen   2014-02-13
[ 575 ]  
 
Proposed revision to Annex 5 to Joint Task Group 4-5-6-7 Chairman's Report     European Broadcasting Union   2014-02-13
[ 574 ]  
 
Preliminary draft new Report ITU-R M./BT.[IMTDTTBLOWERUHF] "Sharing and compatibility studies between digital terrestrial television broadcasting and IMT in the frequency band 470-694/698 MHz"     European Broadcasting Union   2014-02-13
[ 573 ]  
 
Review of spectrum requirements for IMT     ASTRIUM SAS , European Space Agency , Eutelsat S.A. , HISPASAT, S.A. , Inmarsat Plc. , Intelsat , LS telcom AG , SES WORLD SKIES , THALES Communications   2014-02-13
[ 572 ]  
 
Study on the impact of the aggregate interference originating from IMT stations into FSS space station receivers in the band 5 925-6 425 MHz     Inmarsat Plc.   2014-02-17
[ 571 ]  
 
Proposed revisions to draft CPM text on WRC-15 agenda item 1.1 - Proposed revisions to the draft CPM text, as contained in Attachment 5 of Annex 7 to Document 4-5-6-7/393 are shown below     Inmarsat Plc.   2014-02-17
[ 570 ]  
 
Proposed revisions to framework for a working document towards a preliminary draft new Report ITU-R [C-BAND DOWNLINK]     Inmarsat Plc.   2014-02-13
[ 569 ]  
 
Proposals on working document towards preliminary draft CPM text for WRC-15 agenda item 1.2     Egypt (Arab Republic of) , United Arab Emirates   2014-02-13
[ 568 ]  
 
IARU position on WRC-15 agenda item 1.1     International Amateur Radio Union   2014-02-12
[ 567 ]  
 
Some aspects and implications of adding further time elements to the Mont Carlo simulation methodology     Motorola Solutions Inc.   2014-02-13
[ 566 ]  
 
Observations on the results on 5 GHz RLAN characteristics debate with some results of simulations     United Kingdom of Great Britain and Northern Ireland   2014-02-13
[ 565 ]  
 
Determination of 700 MHz band UE OOBE limit for the protection of DTT fixed roof-top reception     Orange   2014-02-17
[ 564 ]  
 
A method for deriving IMT UE OOB emissions, required to protect DTTB reception, based on IMT network changes (events)     Broadcast Networks Europe   2014-02-13
[ 563 ]  
 
IMT UE OOB emissions required to protect DTTB reception     Broadcast Networks Europe   2014-02-13
[ 562 ]  
 
Comparison of average power and number of UE operating at maximum power     Broadcast Networks Europe   2014-02-13
[ 561 ]  
 
The effect of not including building entry standard deviation on interference probability     Broadcast Networks Europe   2014-02-13
[ 560 ]  
 
Confidence in Monte Carlo simulations     Broadcast Networks Europe   2014-02-13
[ 559 ]  
 
Determining power control settings for use in Monte Carlo simulations     Broadcast Networks Europe   2014-02-13
[ 558 ]  
 
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.2     Angola (Republic of) , Benin (Republic of) , Botswana (Republic of) , Burkina Faso , Burundi (Republic of) , Cameroon (Republic of) , Comoros (Union of the) , Côte d'Ivoire (Republic of) , Djibouti (Republic of)   2014-02-13
[ 557 ]  
 
Modelling of potential interference from IMT uplink to fixed rooftop digital terrestrial receivers     Angola (Republic of) , Benin (Republic of) , Botswana (Republic of) , Burkina Faso , Burundi (Republic of) , Cameroon (Republic of) , Comoros (Union of the) , Côte d'Ivoire (Republic of) , Djibouti (Republic of)   2014-02-13
[ 556 ]  
 
Sharing between IMT systems and radars in the 2 700-2 900 MHz band     Sweden   2014-02-13
[ 555 ]  
 
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, frequency range 5 350-5 470 MHz and 5 725-5 850 MHz     Sweden   2014-02-13
[ 554 ]  
 
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, Section 1/1.1/3.2.1 frequency range 470 to 694 MHz     Sweden   2014-02-13
[ 553 ]  
 
Proposed modifications to working document towards preliminary draft CPM text for WRC-15 agenda item 1.1, general consideration regarding allocation and use     Sweden   2014-02-13
[ 552 ]  
 
Candidate frequency bands for IMT     Italy   2014-02-13
[ 551 ]  
 
Compatibility study between MS and ARNS in 694-790 MHz     Finland , France , Germany (Federal Republic of) , Latvia (Republic of) , Lithuania (Republic of) , Norway , Poland (Republic of) , Sweden   2014-02-13
[ 550 ]  
 
Study of rain fade depth on FSS frequency bands     GSM Association   2014-02-13
[ 549 ]  
 
Proposed modification to working document towards preliminary draft CPM text on satellite issues     GSM Association   2014-02-13
[ 548 ]  
 
Proposed amendments to draft CPM text associated with the frequency ranges 1 300-1 400 MHz; 2 025-2 110 MHz and 2 200-2 290 MHz; 2 700-2 900 MHz; and 2 900-3 100 MHz     Telstra Corporation Ltd.   2014-02-13
[ 547 ]  
 
DTT receivers at TV coverage edge     GSM Association   2014-02-13
[ 546 ]  
 
Consideration of proposed method for post-processing of Monte Carlo modelling results and modelling assumptions     GSM Association   2014-02-13
[ 545 ]  
 
Modelling of adjacent band compatibility between IMT and DTT     GSM Association   2014-02-13
[ 544 ]  
 
Co-channel coexistence between IMT and DTT in 470 - 694/698 MHz     GSM Association   2014-02-13
[ 543 ]  
 
Analysis of required mitigation for IMT systems and radars to share the 1 300-1 400 MHz band     GSM Association   2014-02-13
[ 542 ]  
 
Sharing between IMT systems and radars in the 1 300-1 400 MHz band     GSM Association   2014-02-13
[ 541 ]  
 
Analysis of required mitigation for IMT systems and radars to share the 2 700-2 900 MHz band     GSM Association   2014-02-13
Results:715 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17