Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 80 ]
|
On the requirements for IMT-Advanced
|
Alcatel Lucent France
,
Motorola Inc.
,
Nokia Corporation
,
Nokia Siemens Networks
,
NTT DoCoMo
,
Telecom Italia
,
Telefon AB-LM Ericsson
|
|
2008-01-21 |
|
[ 79 ]
|
3GPP TSG RAN structure and working groups terms of reference
|
Alcatel-Lucent France
,
Motorola Inc.
,
Nokia Corporation
,
Nokia Siemens Networks
,
NTT DoCoMo
,
Telecom Italia
,
Telefon AB-LM Ericsson
|
|
2008-01-21 |
|
[ 78 ]
|
Letter of Conveyance with regard to intent on submitted materials to ITU-R in relation to the global core specifications, transposed standards references and Recommendation ITU-R M.1457
|
Director, BR
|
229/8
|
2008-01-21 |
|
[ 77 ]
|
Letter of Conveyance with regard to intent on submitted materials to ITU-R in relation to the global core specifications, transposed standards references and Recommendation ITU-R M.1457
|
Director, BR
|
229/8
|
2008-01-21 |
|
[ 76 ]
|
Letter of Conveyance with regard to intent on submitted materials to ITU-R in relation to the global core specifications, transposed standards references and Recommendation ITU-R M.1457
|
ETSI
|
|
2008-01-21 |
|
[ 75 ]
|
Concluding the revision of Question ITU-R 229-1/8
|
Acting Chairman, WP 5D
,
Chairman, AH Workplan
|
229/8
|
2008-01-21 |
|
[ 74 ]
|
Review of Questions previously assigned jointly to WP 8F and WP 8A
|
Acting Chairman, WP 5D
,
Chairman, AH Workplan
|
|
2008-01-21 |
|
[ 73 ]
|
Method of work to complete draft new Report ITU-R M.[IMT.TECH] and finalized Circular Letter on IMT-Advanced
|
Acting Chairman, WP 5D
,
Chairman, AH Workplan
|
|
2008-01-21 |
|
[ 72 ]
|
Proposed amendments to Annex 1 of draft revision of Recommendation ITU-R M.1457-7
|
Brazil (Federative Republic of)
|
|
2008-01-21 |
|
[ 71 ]
|
Circular Letter for IMT-Advanced - Annex 8
|
Brazil (Federative Republic of)
|
|
2008-01-21 |
|
[ 70 ]
|
Mobile WiMAX 802.16E BS receiver parameters used in the sharing study
|
France Telecom
|
|
2008-01-21 |
|
[ 69 ]
|
Proposal of sectorial survey into a national process of adoption of IMT
|
Colombia (Republic of)
|
|
2008-01-21 |
|
[ 68 ]
|
Channel models for evaluation of air interface proposals for IMT-Advanced
|
Finland
|
229/8
|
2008-01-21 |
|
[ 67 ]
|
Services issues in the Circular Letter for IMT-Advanced
|
Finland
|
|
2008-01-21 |
|
[ 66 ]
|
Technical system performance related requirements for IMT-Advanced radio interface
|
Nokia Corporation
,
Elektrobit Corporation
,
Nokia Siemens Networks
,
Telefon AB - LM Ericsson
|
229/8
|
2008-01-21 |
|
[ 65 ]
|
Towards a principle on which test environments to fulfil
|
Telefon AB - LM Ericsson
|
|
2008-01-21 |
|
[ 64 ]
|
Spectrum issues in the Circular Letter for IMT-Advanced
|
Nokia Siemens Networks
,
Elektrobit Corporation
,
Nokia Corporation
,
Telefon AB-LM Ericsson
|
|
2008-01-21 |
|
[ 63 ]
|
Structure of IMT.EVAL and elements for the chapters
|
Telefon AB-LM Ericsson
,
Elektrobit Corporation
,
Nokia Corporation
,
Nokia-Siemens Networks
|
229/8
|
2008-01-21 |
|
[ 62 ]
|
Proposed new test environments and channel models of preliminary draft new Report M.[IMT.EVAL]
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 61 ]
|
Proposal to simplify the propagation model for IMT-Advanced evaluation
|
China and New Zealand
|
229-1
|
2008-01-21 |
|
[ 60 ]
|
Proposed minimum service requirements for Circular Letter Annex 3 of IMT Advanced
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 59 ]
|
Proposal to reduce test operating scenarios for IMT-Advanced evaluation
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 58 ]
|
Proposal for [IMT.TECH] based on report and output of Correspondence Group
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 57 ]
|
Proposed guideline for the channel modelling work of IMT.EVAL
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 56 ]
|
Proposed revisions for draft new [Report/Recommendation] [Guidelines for evaluation of radio interface technologies for IMT-Advanced]
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 55 ]
|
Proposed revisions for the Annex 7 of the Circular Letter
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 54 ]
|
Proposed draft text for Annex 6 of the Circular Letter
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 53 ]
|
Proposed modification to Annex 5 of the Circular Letter for IMT-Advanced
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 52 ]
|
Considerations for study of 2 300-2 400 MHz band
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 51 ]
|
Proposed the technology requirements for Circular Letter Annex 4
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 50 ]
|
Considerations for sharing study of 698-862 MHz band
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 49 ]
|
Update simulation result from CMCC to the working document towards sharing studies in the 2 500-2 690 MHz band between IMT-2000 and fixed broadband wireless access (BWA) systems
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 48 ]
|
Proposals of study methodology and parameters about sharing studies between TD-SCDMA and FBWA in the 2 500~2 690 MHz band
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 47 ]
|
Proposals of dynamic simulation methodology about sharing studies in the 2 500-2 690 MHz band between IMT-2000 and mobile broadband wireless access (MBWA) systems in the same geographical area
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 46 ]
|
Proposed revisions for Circular Letter Annex 2
|
China (People's Republic of)
|
229/8
|
2008-01-21 |
|
[ 45 ]
|
Proposal for evaluation methodologies of IMT.EVAL
|
China (People's Republic of)
|
|
2008-01-21 |
|
[ 44 ]
|
Proposal on Ricean K-factor model for urban micro & macro scenario based on measurement campaigns
|
Korea (Republic of)
|
|
2008-01-21 |
|
[ 43 ]
|
Proposed work to develop frequency arrangement for spectrum bands identified by WRC-07
|
Korea (Republic of)
|
229/8
|
2008-01-21 |
|
[ 42 ]
|
Proposal for an IMT-Advanced workshop
|
Korea (Republic of)
|
|
2008-01-21 |
|
[ 41 ]
|
Comments on the peak data rate requirements
|
Korea (Republic of)
|
229/8
|
2008-01-21 |
|
[ 40 ]
|
Proposal on channel model parameter sets for urban micro & macro scenario based on measurement campaigns
|
Korea (Republic of)
|
|
2008-01-21 |
|
[ 39 ]
|
Draft text for the main body and Annex 2 of the Circular Letter on an invitation to propose candidate radio interface technologies for IMT-Advanced
|
Korea (Republic of)
|
|
2008-01-21 |
|
[ 38 ]
|
Update of working document towards a preliminary draft new Report on sharing studies in the 2 500-2 690 MHz band between IMT-2000 and Mobile Broadband Wireless Access (MBWA) systems in the same geographical area with respect to 10MHz 802.16E Case
|
Samsung Electronics Co. Ltd.
|
|
2008-01-21 |
|
[ 37 ]
|
Additional simulation results between CDMA-DS and OFDMA-TDD-WMAN for the sharing studies in the 2 500 - 2 690 MHz band between IMT-2000 and MBWA systems in the same geographical area
|
Intel Corporation
|
|
2008-01-21 |
|
[ 36 ]
|
Enforcement of technical conditions for global circulation of IMT terminals
|
Germany (Federal Republic of)
|
|
2008-01-21 |
|
[ 35 ]
(Rev.1) |
Proposed amendment to IMT.TECH
|
Intel Corporation
|
229-1/8
|
2008-01-19 |
|
[ 34 ]
|
Proposed changes to IMT.EVAL
|
Intel Corporation
|
|
2008-01-19 |
|
[ 33 ]
|
Process for the evaluation of IMT radio interface proposals
|
Canada
|
|
2008-01-18 |
|
[ 32 ]
|
On the use of the term "4G"
|
Canada
|
|
2008-01-18 |
|
[ 31 ]
|
Preparation of the Report IMT.TECH
|
Canada
|
|
2008-01-18 |
Results:1180 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):