International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 27 ]  
 
2008-05-13 Chairman, SG 1   Structure of Study Group 1 and its Working Parties     N/A  
[ 26 ]  
 
2008-05-06 WP 4A   Liaison statement to Working Party 5C (copy to Working Parties 1A, 7B, 7C and 7D) - WRC-11 Agenda item 1.8     N/A  
[ 25 ]  
 
2008-05-06 WP 4A   Liaison statement to Working Party 3J (copy to Working Party 1A) - Radio noise     N/A  
[ 24 ]  
 
2008-04-22 WP 4C   Liaison statement to Working Parties 7A, 7B, 7C, 7D, 4A, 4B, 6D, 6X, 6G, 1A, 1B, 1C, 5A, 5B, 5C and 5D (copy for information to Working Parties 3J, 3K, 3L and 3M) - Information for studies related to WRC-11 Agenda item 1.25     N/A  
[ 23 ]  
 
2008-04-22 WP 4C   Liaison statement to Working Parties 1A and 3J radio noise     N/A  
[ 22 ]  
 
2008-04-07 WP 7B   Liaison statement to Working Parties 1A and 5C - Considerations for satellite optical links     N/A  
[ 21 ]  
 
2008-04-07 WP 7C   Liaison statement to Working Party 3J (Copy to Working Party 1A) - Typical bandwidths for radiocommunication systems under the purview of Working Party 7C     N/A  
[ 20 ]  
 
2008-04-07 WP 5A   Liaison statement to ITU-T Study Group 16 (copy to Working Party 1A) - Joint coordination activity on network aspects of identification systems (including RFID)     N/A  
[ 19 ]  
 
2008-04-07 WP 7B   Liaison statement to Working Party 3J (copy to Working Party 1A) - Radio noise     N/A  
[ 18 ]  
 
2008-04-04 WP 7C   Liaison statement to Working Party 1A - Spectrum use by the passive services between 275 GHz and 3 000 GHz (WRC-11 Agenda item 1.6)     N/A  
[ 17 ]  
 
2008-04-04 WP 7C   Liaison statement to Working Party 1A - Interference protection requirements from power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     N/A  
[ 16 ]  
 
2008-04-04 WP 7B   Liaison statement to Working Party 1A - Interference protection requirements from power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     N/A  
[ 15 ]  
 
2008-04-04 WP 7B   Liaison statement to Working Party 1B concerning the study of software defined radio and cognitive radio systems in Working Party 1B (copy for information to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6D, 6G, 7C, 7D)     N/A  
[ 14 ]  
 
2008-03-28 IEEE   Liaison to ITU-R WP 1A regarding status of the 275-3 000 GHz frequency band     N/A  
[ 13 ]  
 
2008-03-31 BR Study Group Department   Recommendation to be brought to the attention of Study Groups 1, 4, 5 (former SGs 8 and 9) and 6 - Recommendation ITU-R RA.1031-2 "Protection of the radio astronomy service in frequency bands shared with other services"     N/A  
[ 12 ]  
 
2008-03-13 BR Study Group Department   Recommendation to be brought to the attention of Study Groups 1 and 5 - Recommendation ITU-R P.1814     N/A  
[ 11 ]  
 
2008-03-13 BR Study Group Department   Recommendation to be brought to the attention of Study Groups 1 and 5 - Recommendation ITU-R P.1817     N/A  
[ 10 ]  
 
2008-02-19 WP 5C   Liaison statement to Working Parties 1A, 4A, 7B, 7C and 7D - WRC-11 Agenda item 1.8 - consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz     N/A  
[ 9 ]  
 
2008-02-15 WP 5B   Liaison statement to WP 1A - Future work related to Annex 8 of Recommendation ITU-R SM.1541-2     N/A  
[ 8 ]  
 
2008-02-15 WP 5C   Liaison statement to Working Party 1A - WRC-11 Agenda item 1.6     N/A  
[ 7 ]  
 
2008-02-11 WP 5C   Liaison statement to Working Party 3J (copy to WPs 1A and 1C for information) - Radio noise     N/A  
[ 6 ]  
 
2008-02-11 WP 5C   Liaison statement to ITU-R Working Party 1A - WRC-11 Agenda item 1.22     N/A  
[ 5 ]  
 
2008-01-29 Chairman, CPM-11   Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11     N/A  
[ 4 ]  
 
2008-01-16 BR Study Group Department   Recommendation to be brought to the attention of Study Groups 1, 3, 4 and 5     N/A  
[ 3 ]  
 
2008-01-16 BR Study Group Department   ITU-R Study Group 3 question to be brought to the attention of Study Group 1     N/A  
Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-11-05