International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions : 546 Recently posted -  Search Meeting Documents
   
[546]  Chairman's report on the meeting of Working Party 4A, Geneva, 10 - 19 March 2003

Format

Size

Posted

English

Word  

54272 bytes 2003-04-04 [546] Annex 25 - Liaison statement to Working Party 6 E - HEO satellite system below 1 GHz

Word  

90112 bytes 2003-04-04 [546] Annex 24 - Liaison statement to WP 4-9S - Impact of various PFD masks on the performance of HEO satellite systems in the 4 GHz band

Word  

143360 bytes 2003-04-04 [546] Annex 23 - Note to the Director, Radiocommunication Bureau - Software implementation of earth station antenna patterns for use in coordination and interference assessment for the fixed-satellite service

Word  

56320 bytes 2003-04-04 [546] Annex 22 - Liaison statement to Working Parties 7C and 7D and JRG 8A-9B - Preliminary draft revision of Recommendation ITU-R S.1427

Word  

116736 bytes 2003-04-04 [546] Annex 21 - Liaison statement to Task Group 1/8 - Protection of FSS systems from the interference caused by UWB devices

Word  

57344 bytes 2003-04-07 [546] Annex 20 - Draft liaison statement to Working Party 1A - Assessment of unwanted emissions

Word  

53248 bytes 2003-04-07 [546] Annex 19 - Liaison statement to Working Parties 6S and 8B - Sharing and compatibility between the fixed-satellite service (space-to-Earth) in the band 17.3-18.1 GHz and the radiolocation service in the band 15.6-17.7 GHz

Word  

59904 bytes 2003-04-07 [546] Annex 18 - Note to the Director of the BR on the study of Appendix 30B Plan interference with modified plan parameters

Word  

64000 bytes 2003-04-07 [546] Annex 17 - Liaison statement to Working Party 7B - Sharing between non-GSO inter-satellite links and GSO/GSO inter-satellite links

Word  

931840 bytes 2003-04-04 [546] Annex 16 - Element fo the Chairman's Report - Support material for PDNR on possible EPFD limits for 6/4 GHz FSS bands

Word  

63488 bytes 2003-04-07 [546] Annex 15 - Element for Chairman's report of WP 4A meeting - Possible modification to the definition of geostationarl satellite (No.1.189)

Word  

57856 bytes 2003-04-07 [546] Annex 14 - Statement for the Chairman's report of the WP 4A meeting (10-19 March 2003) - Protection of GSO down-links from interference by HEO systems in the frequency band 19.7-10.2 GHz

Word  

586240 bytes 2003-04-07 [546] Annex 13 - Working document towards a preliminary draft revision to Recommendation ITU-R S.731 - Reference earth-station cross-polarized radiation pattern for use

Word  

198656 bytes 2003-04-07 [546] Annex 12 - Consideration of possible modification to Appendix 4 of the ITU Radio Regulations data to allow the submission of non-GSO systems with heterogeneous orbits

Word  

158208 bytes 2003-04-07 [546] Annex 11 - Working document on additional interference and other considerations pertaining to the potential addition of an allocation to the fixed-satellite service (space-to-Earth) for use by HD-FSS applications in parts of the band 47.2-50.2 GHz

Word  

91136 bytes 2003-04-07 [546] Annex 10 - Working document towards a preliminary draft new Recommendation for a reference antenna radiation pattern for use in coordination and interference assessment for earth stations operating with geostationary satellites in the frequency range from 2 to [51.4

Word  

72704 bytes 2003-04-04 [546] Annex 9 - Draft element for the Chairman's report - Software validation of simulation packages developed in accordance with Recommendation ITU-R S.1503

Word  

65536 bytes 2003-04-07 [546] Annex 8 - Working document towards a preliminary draft new Recommendation - Protection criteria of FSS systems from the interference caused by UWB devices

Word  

114176 bytes 2003-04-07 [546] Annex 7 - Working document - Study of Appendix 30B Plan interference with modified plan parameters

Word  

96768 bytes 2003-04-07 [546] Annex 6 - Preliminary draft revision of Recommendation ITU-R S.1427 - Methodology and criterion to assess interference from radio local area

Word  

368128 bytes 2003-04-07 [546] Annex 5 - Preliminary draft new Recommendation - Protection of satellite networks using the geostationary satellite orbits (GSO) from interference caused by HEO geosynchronous satellites systems in highly inclined orbits in the frequency band 19.7-20.2 GHz

Word  

105472 bytes 2003-04-07 [546] Annex 4 - Preliminary draft new Recommendation - Sharing between geostationary-satellite networks and non-geostationary-satellite systems in the fixed-satellite service operating in the 6/4 GHz band

Word  

225280 bytes 2003-04-04 [546] Annex 3 - Preliminary draft new Recommendation - Electronic data file format for earth station antenna patterns

Word  

102912 bytes 2003-04-04 [546] Annex 2 - Preliminary draft new Recommendation - Power-flux density values in the band 11.7-12.7 GHz and associated calculation methodology which may be used when the power flux-density values in § 6 of Annex 1 to Appendix 30 are exceeded

Word  

325632 bytes 2003-04-04 [546] Annex 1 - Working document towards a preliminary draft new Recommendation - Static methodology for calculating epfd down to trigger very large antenna coordination under Nos. 9.7A and 9.7B

Word  

155136 bytes 2003-04-07 [546]  - Chairman's report on the meeting of WP 4A
 

Document :

ITU-R WP4A  Contribution  546

Title :

Chairman's report on the meeting of Working Party 4A, Geneva, 10 - 19 March 2003

Date :

2003-04-03

Source :

Chairman, WP 4A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-05-15