International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG09 : Circulars  Recently posted -  Search Meeting Documents
   
ITU-R SG09  CIR 

ITU-R SG09

Fixed service

Results:32 total items.
Circulars
 
Number 
Title Source Date
[ 97 ]  
 
Meeting of Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service)     Director, BR   2007-02-12
[ 96 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D in conjunction with a meeting of Radiocommunication Study Group 9     Director, BR   2007-02-06
[ 95 ]  
 
Meeting of Working Party 9C - Sytems below 30 MHz (HF and others)     WP 9C   2006-06-08
[ 94 ]  
 
Meeting of WP 4-9S (Frequency sharing between the fixed-satellite service and the fixed service), 25 August - 1 September 2006     Director, BR   2006-05-09
[ 93 ]  
 
Fifth and final meeting of Joint Task Group 6-8-9 of Radiocommunication Study Groups 6, 8 and 9     Director, BR   2006-03-14
[ 92 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D - Kobe, Japan (27 June - 5 July 2006)     Director, BR   2006-02-27
[ 91 ]  
 
Meeting of Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service)     Director, BR   2005-11-28
[ 90 ]  
 
Fourth meeting of Joint Task Group 6-8-9 of Radiocommunication Study Groups 6, 8 and 9     Director, BR   2005-11-11
[ 89 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D     Director, BR   2005-07-28
[ 88 ]  
 
Meeting of WP 4-9S (Frequency sharing between the fixed-satellite service and the fixed service)     Director, BR   2005-07-27
[ 87 ]  
 
Third meeting of Joint Jask Group 6-8-9 of Radiocommunication Study Groups 6, 8 and 9     Director, BR   2005-05-27
[ 86 ]  
 
Meeting of Working Party 4-9S (Geneva, 2 - 10 May 2005)     Director, BR   2005-01-13
[ 85 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D     Director, BR   2005-01-12
[ 84 ]  
 
Second meeting of Joint Task Group 6-8-9 of Radiocommunication Study Groups 6, 8 and 9, Geneva, 24-28 January 2005     Director, BR   2004-11-10
[ 83 ]  
 
Meeting of Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service) - 4-11 October 2004     Director, BR   2004-07-06
[ 82 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D     Director, BR   2004-06-21
[ 81 ]  
 
Meetings of Working Parties 9A, 9B, 9C and 9D     Director, BR   2003-11-24
[ 80 ]  
 
Meeting of Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service)     Director, BR   2003-11-21
[ 79 ]  
 
Seventh meeting of the Joint Rapporteur Group of Working Parties 8A and 9B on wireless access issues     Director, BR   2003-09-02
[ 78 ]  
+Add.1 
Adoption of 4 draft new Recommendations, 2 draft revised Recommendations and 1 draft modified Recommendation by Study Group 9 in accordance with Section 10.2.2 of Resolution ITU-R 1-3     SG 9   2003-04-30
[ 77 ]  
 
Meeting of Joint Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service)     Director, BR   2003-02-07
[ 76 ]  
 
Meetings of Working Parties 9A, 9B and 9D     Director, BR   2003-02-07
[ 75 ]  
 
Sixth meeting of the Joint Rapporteur Group of Working Parties 8A and 9B on Wireless access issues     Director, BR   2002-11-28
[ 74 ]  
 
[9/LCCE/74, 8/LCCE/115] Fifth meeting of the Joint Rapporteur Group of Working Parties 8A and 9B on wireless access issues     Director, BR   2002-06-03
[ 73 ]  
+Add.1 
[9/LCCE/73] Adoption of 10 draft new Recommendations and 8 draft revised Recommendations by Study Group 9 in accordance with § 10.2.2 of Resolution ITU-R 1-3 (Adoption by a Study Group by correspondence)     Director, BR   2002-05-31
[ 72 ]  
 
[9/LCCE/72, 4/LCCE/76] Adoption of 5 draft new Recommendations and 1 draft revised Recommendation by Study Groups 4 and 9     Director, BR   2002-06-10
[ 71 ]  
 
[9/LCCE/71, 1/LCCE/50, 6/LCCE/17, 8/LCCE/108] Third meeting of Joint Task Group 1-6-8-9 concerning technical and regulatory requirements of terrestrial wireless interactive multimedia applications     Director, BR   2002-01-25
[ 70 ]  
 
[9/LCCE/70, 8/LCCE/107, 7/LCCE/34, 4/LCCE/73] Third meeting of Joint Task Group 4-7-8-9 on 5 GHz band allocations (Resolution 736 (WRC-2000))     Director, BR   2002-01-21
[ 69 ]  
 
[9/LCCE/69, 8/LCCE/105] Fourth meeting of the Joint Rapporteur Group of Working Parties 8A and 9B on wireless access issues     Director, BR   2002-01-07
[ 68 ]  
 
[9/LCCE/68, 4/LCCE/72] Meeting of Joint Working Party 4-9S (Frequency sharing between the fixed-satellite service and the fixed service))     Director, BR   2002-01-07
[ 67 ]  
 
Second meeting of the Joint Rapporteur Group of Working Parties 6S and 9D on frequency sharing between the fixed service and the broadcasting-satellite service (sound)     Director, BR   2002-11-28
[ 66 ]  
 
[9/LCCE/66] Meetings of Working Parties 9A, 9B, 9C and 9D     Director, BR   2002-01-07
Results:32 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-09-03